Plan Review Details - Permit 06040775
Plan Review Stops For Permit 06040775
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2006-09-05 Cont ID  
Sent By amorse Date 2006-09-05 Time 15:16 Rev Time 0.00
Received By amorse Date 2006-09-05 Time 15:16 Sent To PC
Notes
2006-09-05 00:00:00 
 SUBMIT ELECTRICAL UNDER SEPERATE PERMIT
  
 BLDG PLAN REVIEW
 ADRIAN MORSE
 561-805-6716

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2006-07-24 Cont ID  
Sent By amorse Date 2006-07-24 Time 07:20 Rev Time 0.50
Received By amorse Date 2006-07-24 Time 07:20 Sent To PC
Notes
2006-07-24 00:00:00 
  
 DENIED
  
 1) 2 SIGNED AND SEALED COPIES OF THE
 SOIL REPORT MUST BE SUBMITTED WITH THE
 PERMIT APPLICATION, AFTERS APPROVAL ONE
 COMPLETE SET OF SUBMITTALS WILL BE
 RETURNED WITH PERMIT FOR CONSTRUCTION
  
 BLDG PLAN REVIEW
 ADRIAN MORSE
 561-805-6716

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2006-05-22 Cont ID  
Sent By amorse Date 2006-05-22 Time 07:39 Rev Time 1.00
Received By amorse Date 2006-05-22 Time 07:39 Sent To PC
Notes
2006-05-22 00:00:00 
  
 DENIED
  
 1) STRUCTURE IS IN AN AREA OF
 QUESTIONABLE SOILS AND AS SUCH REQUIRES
 A SOIL REPORT
  
 2) THERE ARE ELECTRICAL CONTROLS ON
 DRAWING THAT WILL REQUIRE ELECTRICAL
 CONTRACTOR UNDER THIS PERMIT OR WITH
 SEPARATE PERMIT TIED TO THIS PERMIT
 NUMBER
  
 BLDG PLAN REVIEW
 ADRIAN MORSE
 561-805-6716

Review Stop E ELECTRICAL
Rev No 1 Status N Date 2006-09-05 Cont ID  
Sent By dpalmer Date 2006-09-05 Time 14:58 Rev Time 0.00
Received By dpalmer Date 2006-09-05 Time 14:58 Sent To B
Notes
2006-09-05 00:00:00*** UNSAT ***
  
 1) NOTE: PLEASE SEE ELECTRICAL PLANS AND
 PERMIT APPLICATION IS NOW BEING
 SUBMITTED WITH BUILDING PERMIT. PLEASE
 KNOW, IT IS OK, FOR THE ELECTRICAL PLANS
 TO BE SUBMITTED WITH BUILDING , HOWEVER
 SINCE THE ELECTRICAL CONTRACTORWAS NOT
 SIGNED ON BUILDING CONTRACTORS ORIGINAL
 PERMIT APPLICATION, THE ELECTRICAL
 CONTRACTOR MAY COME IN AFTER BUILDING
 PERMIT IS ISSUED, REFERENCE THE BUILDIGN
 PERMIT AND AS LONG AS THE ELECTRICAL
 REVIEW IS "PASSED", THEN THE PERMIT IS
 DONE AS A TURNAROUND PERMIT.
 PLEASE SEETHE FOLLOWING ELECTRICAL
 COMMENTS.
  
 2) NOTE: PLEASE SUBMIT LOAD CALCULATIONS
 FOR NEW ADDED LOADS ON HE EXISTING
 ELECTRICAL SERVICE.
 220.31
  
 3) NOTE: PLEASE SEE AN ADDITIONAL SWITCH
 IS BEING SHOWN ON THE PLANS FOR ??
 SOMETHING, BUT IT IS NOT SHOWN WHAT THIS
 IS SWITCHING.
  
  
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CONSTUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2006-09-05 Cont ID  
Sent By adarroug Date 2006-09-05 Time 08:32 Rev Time 0.00
Received By adarroug Date 2006-09-05 Time 08:32 Sent To B
Notes
2006-09-05 00:00:00TO "AMORSE" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2006-07-21 Cont ID  
Sent By adarroug Date 2006-07-21 Time 10:51 Rev Time 0.00
Received By adarroug Date 2006-07-21 Time 10:51 Sent To B
Notes
2006-07-21 00:00:00TO "AMORSE" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-04-25 Cont ID  
Sent By adarroug Date 2006-04-25 Time 11:11 Rev Time 0.00
Received By adarroug Date 2006-04-25 Time 11:11 Sent To B
Notes
2006-04-25 00:00:00TO "MISC" BOX#2

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2006-05-22 Time   Rev Time 0.00
Received By adarroug Date 2006-04-21 Time 09:35 Sent To  
Notes
2006-04-21 00:00:00TO "Z" BOX

Review Stop Z ZONING
Rev No 1 Status P Date 2006-04-24 Cont ID  
Sent By mmclean Date 2006-04-24 Time 11:19 Rev Time 0.00
Received By mmclean Date 2006-04-24 Time 11:19 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved