Plan Review Details - Permit 06020928
Plan Review Stops For Permit 06020928
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2006-12-08 Cont ID  
Sent By jgomez Date 2006-12-08 Time 08:56 Rev Time 0.40
Received By jgomez Date 2006-12-08 Time 08:56 Sent To M
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2006-06-26 Cont ID  
Sent By jgomez Date 2006-06-26 Time 13:41 Rev Time 0.00
Received By jgomez Date 2006-06-26 Time 13:27 Sent To PC
Notes
2006-06-26 00:00:00PLANS UNDER "R". JG.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2006-04-28 Cont ID  
Sent By mmclean Date 2006-04-28 Time 14:19 Rev Time 1.00
Received By jgomez Date 2006-04-28 Time 10:28 Sent To  
Notes
2006-04-28 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1- A) SOIL TEST REPORT TO BE ADDRESSED
 TO CORRECT BUILDING DEPARTMENT AND
 ADDRESS. THIS IS THE CITY OF WEST PALM
 BEACH CONSTRUCTION SERVICES DEPARTMENT,
 NOT PALM BEACH COUNTY.
 B) TRIANGLE TESTING LAB, INC TO
 INCLUDE CERTIFICATE OF AUTHORIZATION IN
 THE LETTER HEAD AS REQUIRED BY CHAPTER
 471 FLORIDA STATUTE AND 61G15-23.002 OF
 FLORIDA ADMINISTRATIVE CODE.
 C) PROVIDE 2 SIGNED AND SEALED
 COPIES. ONLY ONE SUBMITTED THIS TIME.
  
 NOTE: PROVIDE REQUIRED INFORMATION PRIOR
 TO FIRST INSPECTION TO AVOID DELAYS OR
 CONFLICTS.
 NEED TO PASS ZONING REVIEW TO PRINT
 PERMIT. ZONING SETBACKS MUST BE MET.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2006-03-22 Cont ID  
Sent By jgomez Date 2006-03-22 Time 18:02 Rev Time 2.00
Received By jgomez Date 2006-03-22 Time 18:02 Sent To  
Notes
2006-03-22 00:00:00BUILDING REVIEW CHECKLIST:
 1- AFTER CORRECTIONS ARE DONE TO THE
 ORIGINAL DRAWINGS, TAKE THEM TO PALM
 BEACH COUNTY BUILDING TO PAY THE IMPACT
 FEES. BRING STAMPED DRAWINGS & RECEIPT.
  
 2- NEED RECORDED NOTICE OF COMMENCEMENT.
  
 3- PROVIDE SOIL TEST REPORT. (2 COPIES).
  
 4- SPECIFY SAFETY GLASS FOR WINDOW IN
 MASTER BATHROOM SHOWER AS REQ'D BY SEC.
 R308.4 2004 RESIDENTIAL CODE.
  
 5- SPECIFY ATTIC SIZE AS REQUIRED BY
 SEC. R807 2004 RESIDENTIAL CODE.
  
 6- REVISE STRUCTURAL NOTE #14: A) 1 3/4"
 NAIL IS TOO SHORT. NEED 1 3/4" MIN.
 PENETRATION INTO THE WOOD TRUSSES. SEE
 COPY OF ASTM C1063 ATTACHED.
 B) STUCCO HAS NOTHING TO DO WITH
 VENTILATION. THESE ARE 2 DIFFERENT
 ISSUES. REVISE NOTE AS REQUIRED.
  
 7- OWES $317.87 FOR UPDATED VALUATION
 AND RADON FEES.
  
 8- PROVIDE CALCULATIONS FOR DOOR AND
 WINDOWS DESIGN PRESSURES SHOWN ON PLANS.
 DESIGN PRESSURS SHOWN FOR SOME OPENINGS
 ARE LOWER THAN THOSE SHOWN ON FIGURE
 R301.2(8) OF 2004 RESIDENTIAL CODE.
 ALSO, PROVIDE CORRECT DESIGN PRESSURES
 FOR OPENINGS LOCATED IN THE END ZONE.
 SEC. 106.1.2 CITY AMENDMENTS TO FBC 2004
  
 9- PROVIDE FLORIDA OR LOCAL PRODUCT
 APPROVAL FOR SIMPSON CONNECTOR VTC 2
 SHOWN ON DETAIL D-D, DWG 2 OF 4.
  
 10- ALL PRODUCT APPROVALS NEED TO BE
 REVIEWED AND APPROVED IN WRITTING (TYP.
 DONE USING THE STANDARD REVIEW STAMP) BY
 THE ENGINEER OF RECORD PRIOR TO
 SUBMITTAL TO THIS OFFICE AS REQUIRED BY
 SEC. 106.3.3 CITY AMENDMENTS TO FBC 2004
  
 11- SPECIFY 2 LAYERS OF UNDERLAYMENT FOR
 3:12 PITCH AS REQUIRED BY SEC. R905.2.7
 2004 RESIDENTIAL CODE.
  
 12- CONNECTOR FGTR. SEE CATALOGUE FOR
 SPECIFIED FASTENER. PROVIDE ENGINEERING
 CALCS FOR FASTENERS THAT DIFFER FROM
 THOSE TESTED AND PUBLISHED BY THE
 MANUFACTURER. SEC. 106.1.2 CITY
 AMENDMENTS TO FBC 2004.
  
 13- ENERGY CALCULATIONS: A) USE 2004
 FORM, NOT 2001.
 B) CEILING FAN CREDIT WAS TAKEN.
 THEREFORE, SPECIFY CEILING FANS SIZES IN
 ELECTRICAL PLAN AS REQUIRED BY TABLE
 13-607.1.A.1 FBC 2004.
  
 14- A)CLARIFY IF USING DOORS AND WINDOWS
 WITH HURRICANE MISSILE IMPACT GLAZING OR
 NOT. PRODUCT APPROVALS SUBMITTED ARE FOR
 WINDOWS WITH IMPACT GLAZING, BUT PRODUCT
 APPROVAL FOR DOORS SUBMITTED IS FOR
 NON-IMPACT GLAZING.
 IF USING SHUTTERS, THEN, PROVIDE KEY
 PLAN AND A COMPLETE INSTALLATION
 SCHEDULE. SEE ATTACHED SAMPLE AND
 COMPLETE ALL THE INFORMATION.
 B) IF USING FRENCH DOORS WITH IMPACT
 GLAZING, THEN PROVIDE CORRESPONDING
 FLORIDA PRODUCT APPROVAL.
  
 15- ENGINEER TO SPECIFY ALL LIVE LOADS
 AND DEAD LOADS FOR ROOF TRUSSES. SEE
 TABLE R301.5 FOR MIN. LIVE LOADS
 REQUIRED. DEAD LOADS NEED TO CONSIDER
 THE ACTUAL WEIGHT OF MATERIALS. SEC.
 106.1.2 CITY AMENDMENTS TO FBC 2004.
  
 16- PROVIDE SECTION/DETAIL SHOWING HOW
 ARE ROOF TRUSSES ATTACHED TO EXISTING
 EXTERIOR BEARING WALL. SEC. 106.1.2 CITY
 AMENDMENTS TO FBC 2004.
  
 17- PREFABRICATED WOOD TRUSSES AND
 GIRDERS NOTE #1 NEED TO BE REVISED.
 REFERENCE THE RESIDENTIAL CODE. SEE SEC.
 R802.10 2004 RESIDENTIAL CODE.
  
 18- ROOF FRAMING PLAN: WHAT OR WHERE IS
 DETAIL D 2/3?.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (5610805-6712

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2006-07-13 Cont ID  
Sent By btrobaug Date 2006-07-13 Time 12:55 Rev Time 0.50
Received By btrobaug Date 2006-07-13 Time 12:48 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2006-06-16 Cont ID  
Sent By btrobaug Date 2006-06-16 Time 07:13 Rev Time 0.50
Received By btrobaug Date 2006-06-16 Time 06:42 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2006-04-28 Cont ID  
Sent By btrobaug Date 2006-04-28 Time 09:19 Rev Time 0.33
Received By btrobaug Date 2006-04-28 Time 09:12 Sent To B
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2006-03-09 Cont ID  
Sent By btrobaug Date 2006-03-09 Time 13:34 Rev Time 0.50
Received By btrobaug Date 2006-03-09 Time 11:59 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2006-12-07 Cont ID  
Sent By adarroug Date 2006-12-07 Time 14:21 Rev Time 0.00
Received By adarroug Date 2006-12-07 Time 14:21 Sent To M
Notes
2006-12-07 14:23:59TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2006-07-08 Cont ID  
Sent By adarroug Date 2006-07-08 Time 17:05 Rev Time 0.00
Received By adarroug Date 2006-07-08 Time 17:05 Sent To E
Notes
2006-07-08 00:00:00TO "BTROBAUG" DESK/NEW SHEETS

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2006-06-12 Cont ID  
Sent By adarroug Date 2006-06-12 Time 08:57 Rev Time 0.00
Received By adarroug Date 2006-06-12 Time 08:57 Sent To E
Notes
2006-06-12 00:00:00TO "BTROBAUG" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2006-06-08 Cont ID  
Sent By adarroug Date 2006-06-08 Time 18:22 Rev Time 0.00
Received By adarroug Date 2006-06-08 Time 18:22 Sent To Z
Notes
2006-06-08 00:00:00TO "Z" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-03-07 Cont ID  
Sent By adarroug Date 2006-03-07 Time 08:33 Rev Time 0.00
Received By adarroug Date 2006-03-07 Time 08:33 Sent To E
Notes
2006-03-07 00:00:00TO "E" BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-03-22 Cont ID  
Sent By jgomez Date 2006-03-22 Time 18:04 Rev Time 0.00
Received By jgomez Date 2006-02-22 Time 16:32 Sent To  
Notes
2006-02-22 00:00:00TO "Z" BOX

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2006-12-08 Cont ID  
Sent By tgordon Date 2006-12-08 Time 09:46 Rev Time 0.30
Received By tgordon Date 2006-12-08 Time 09:46 Sent To  
Notes
2006-12-08 09:47:34MECH. REVISION TO PLANS.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2006-06-16 Cont ID  
Sent By tgordon Date 2006-06-16 Time 14:01 Rev Time 0.20
Received By tgordon Date 2006-06-16 Time 14:01 Sent To P
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2006-03-13 Cont ID  
Sent By tgordon Date 2006-03-13 Time 15:23 Rev Time 0.30
Received By tgordon Date 2006-03-13 Time 15:23 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2006-07-12 Cont ID  
Sent By jleech Date 2006-07-12 Time 13:25 Rev Time 0.00
Received By jleech Date 2006-07-12 Time 13:24 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2006-06-20 Cont ID  
Sent By jleech Date 2006-06-20 Time 09:15 Rev Time 0.00
Received By jleech Date 2006-06-20 Time 09:15 Sent To B
Notes
2006-06-20 00:00:00DENIED;
 FLOOR PLAN AND RISER DIAGRAM DO NOT
 MATCH.
 PLUMBING FLOOR PLAN PAGE 4/5 SHOWS 2
 GLASS BLOCK WINDOWS AND NO CLOSET. FLOOR
 PLAN ON 2/5 SHOWS ONE GLASS BLOCK
 WINDOWS AND A CLOSET. ALL FLOOR PLANS
 SHOULD BE THE SAME.
 PLUMBING PLAN REVIEW BY;
 JOHN LEECH
 805-6695
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2006-03-13 Cont ID  
Sent By jleech Date 2006-03-13 Time 12:56 Rev Time 0.00
Received By jleech Date 2006-03-13 Time 12:56 Sent To M
Notes
***NONE***

Review Stop S SIGNS
Rev No 1 Status N Date 2006-04-28 Cont ID  
Sent By mmclean Date 2006-04-28 Time 14:02 Rev Time 0.00
Received By mmclean Date 2006-04-28 Time 14:02 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 2006-06-10 Cont ID  
Sent By mmclean Date 2006-06-10 Time 15:42 Rev Time 0.00
Received By mmclean Date 2006-06-10 Time 15:42 Sent To I
Notes
2006-06-10 00:00:00APPROVING ADDITION ONLY.

Review Stop Z ZONING
Rev No 2 Status F Date 2006-04-28 Cont ID  
Sent By mmclean Date 2006-04-28 Time 14:19 Rev Time 0.00
Received By mmclean Date 2006-04-28 Time 14:19 Sent To B
Notes
2006-04-28 00:00:00DENIED,
 1. THE REAR SETBACK MUST BE 15FT OR 10%
 OF LOT DEPTH.
 2. SURVEY SHOWS 7.94FT.
 3. PLEASE SUBMIT TWO CURRENT COPIES OF
 SURVEY SHOWING THE REQUIRED SETBACK FOR
 PROPOSED ADDITION.
 4. THE PREVIOUS SURVEY DID NOT SHOW THE
 PROPOSED WORK CLEARLY TO DETERMINE IF
 THE REQUIRED SETBACK MEETS CODE.
  
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720

Review Stop Z ZONING
Rev No 1 Status F Date 2006-03-06 Cont ID  
Sent By mmclean Date 2006-03-06 Time 17:33 Rev Time 0.00
Received By mmclean Date 2006-03-06 Time 17:33 Sent To I
Notes
2006-03-06 00:00:00DENIED,
 1. THE COPIES OF SURVEY PROVIDED DOES
 NOT SHOW THE COMPLETE PROPERTY (NEED A
 CLEAR SURVEY THAT SHOWS ALL ON THE
 PROPERTY)
 2. THE PROPOSED ADDITION MUST MEET THE
 6FT SEPERATION FROM THE EXISTING SHED.
  
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720