Plan Review Details - Permit 06020757
Plan Review Stops For Permit 06020757
Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2006-05-17 Cont ID  
Sent By adarroug Date 2006-05-17 Time 14:34 Rev Time 0.00
Received By adarroug Date 2006-05-17 Time 14:34 Sent To Z
Notes
2006-05-17 00:00:00TO "Z" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2006-05-02 Cont ID  
Sent By adarroug Date 2006-05-02 Time 11:50 Rev Time 0.00
Received By adarroug Date 2006-05-02 Time 11:50 Sent To Z
Notes
2006-05-02 00:00:00TO "Z" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-03-02 Cont ID  
Sent By adarroug Date 2006-03-02 Time 08:37 Rev Time 0.00
Received By adarroug Date 2006-03-02 Time 08:37 Sent To ENG
Notes
2006-03-02 00:00:00TO "ENG" DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-05-10 Cont ID  
Sent By mmclean Date 2006-05-10 Time 13:04 Rev Time 0.00
Received By mmclean Date 2006-02-19 Time 12:00 Sent To  
Notes
2006-02-19 00:00:00TO "Z" BOX

Review Stop Z ZONING
Rev No 4 Status P Date 2006-05-31 Cont ID  
Sent By mmclean Date 2006-05-31 Time 16:29 Rev Time 0.00
Received By mmclean Date 2006-05-31 Time 16:29 Sent To  
Notes
2006-05-31 00:00:00APPROVED FOR PAVERS ONLY.

Review Stop Z ZONING
Rev No 3 Status F Date 2006-05-30 Cont ID  
Sent By mmclean Date 2006-05-30 Time 11:51 Rev Time 0.00
Received By mmclean Date 2006-05-30 Time 11:51 Sent To  
Notes
2006-05-30 00:00:00DENIED,
 1. THE PROPOSED CIRCULAR DRIVEWAY STILL
 EXCEEDS THE REQUIREMENT FOR
 CONCRETE/PAVERS WITHIN THE FIRST 25FT
 FRONT SETBACK.
 2. NEED TO RECONFIGURE THE PROPOSED TO
 MEET THE REQUIREMENT FOR LANDSCAPE
 WITHIN THE FRONT SETBACK.
  
 NOTE: MUST MAINTAIN 1000SQ FT OR 75%
 WHICHEVER IS LESS WITHIN THE FIRST 25FT
 FRONT SETBACK.
 3. MAYBE REDUCING THE CIRCULAR DRIVEWAY
 TO 8FT WIDE & THE EXISTING DRIVEWAY TO
 8FT WIDE THE MEET THE REQUIREMENT OR DO
 STRIPS WITH THE EXISTING DRIVEWAY.
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720

Review Stop Z ZONING
Rev No 2 Status F Date 2006-05-10 Cont ID  
Sent By mmclean Date 2006-05-10 Time 13:02 Rev Time 0.00
Received By mmclean Date 2006-05-10 Time 13:02 Sent To  
Notes
2006-05-10 00:00:00DENIED,
 1. CAN ONLY HAVE 427.28SQ FT OF CONCRETE
 WITHIN THE FIRST 25FT FRONT SETBACK.
 2.THE PROPOSED CIRCULAR DRIVEWAY EXCEEDS
 THE REQUIREMENTS.
 3. MUST PROVIDE TWO COPY OF CURRENT
 SURVEY SHOWING THE PROPOSED WORK THAT
 WILL MEET THE ZONING REQUIREMENT OF
 LANDSCAPE WITHIN THE FRONT SETBACK.
 4. PLEASE INDICATE ON THE TWO COPY OF
 SURVEY THE EXISITING DRIVEWAY THAT WILL
 BE REMOVED AND PROPOSED.
  
  
 NOTE: MUST MAINTAIN 1000SQ FT OR 75%
 WHICHEVER IS LESS WITHIN THE FIRST 25FT
 FRONT SETBACK.
  
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720

Review Stop Z ZONING
Rev No 1 Status F Date 2006-02-28 Cont ID  
Sent By mmclean Date 2006-02-28 Time 13:58 Rev Time 0.00
Received By mmclean Date 2006-02-28 Time 13:58 Sent To I
Notes
2006-02-28 00:00:00DENIED,
 1. NEED TO INDICATE IF THE EXISITING
 DRIVEWAY & WALKWAY WILL REMAIN OR BE
 REMOVED.
 2. IF THE EXISTING DRIVEWAY & WALKWAY TO
 REMAIN, PLEASE PROVIDE THE DIMENSION OF
 WALKWAY.
 3. NEED TO PROVIDE THE LENGTH OF THE
 CIRCULAR DRIVEWAY.
 4. CAN ONLY HAVE 427.28SQ FT OF CONCRETE
 WITHIN THE FIRST 25FT FRONT SETBACK.
  
 NOTE: MUST MAINTAIN 1000SQ FT OR 75%
 WHICHEVER IS LESS WITHIN THE FIRST 25FT
 FRONT SETBACK.
  
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved