Plan Review Details - Permit 06011202
Plan Review Stops For Permit 06011202
Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2006-10-04 Cont ID  
Sent By amorse Date 2006-10-04 Time 07:10 Rev Time 0.00
Received By amorse Date 2006-10-04 Time 07:10 Sent To PC
Notes
2006-10-04 00:00:00 
  
 *****REVISION*****
  
 REVISED DRAWINGS TO SHOW NEW PATIO SLAB

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2006-08-02 Cont ID  
Sent By amorse Date 2006-08-02 Time 11:03 Rev Time 0.00
Received By amorse Date 2006-08-02 Time 11:03 Sent To PC
Notes
2006-08-02 00:00:00 
  
 **************REVISION*************
 ADD A PATIO SLAB

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2006-04-21 Cont ID  
Sent By amorse Date 2006-04-21 Time 12:33 Rev Time 0.75
Received By amorse Date 2006-04-21 Time 12:32 Sent To PC
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2006-04-18 Cont ID  
Sent By amorse Date 2006-04-18 Time 06:48 Rev Time 0.50
Received By amorse Date 2006-04-18 Time 06:48 Sent To PC
Notes
2006-04-18 00:00:00 
  
 DENIED
  
 1) THREE PRODUCT APPROVALS NEED TO BE
 CORRECTED
 A) TYPE OF ASPHALT SHINGLES TO BE USED
 (EG. OAKRIDGE PRO 30 AR, SUPREME AR,
 ETC.) AND THE INSTALLATION DOCUMENTS
 THAT REFFER TO THAT SHINGLE
 B) UPDATED SHUTTER COVER AND DRAWINGS
 THAT ARE ATTACHED TO COVERS PDF FILE.
 PLEASE SPECIFY THE GAUGE USED AND THE
 METHOD OF ATTACHMENT
 C) HORIZONTAL SLIDER COVER SHEET AND
 PRODUCT NOA DONOT MATCH
  
 BLDG PLAN REVIEW
 ADRIAN MORSE
 561-805-6716

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2006-03-21 Cont ID  
Sent By amorse Date 2006-03-21 Time 09:26 Rev Time 2.00
Received By amorse Date 2006-03-21 Time 09:26 Sent To PC
Notes
2006-03-21 00:00:00 
  
 DENIED
  
 1) GLASS BLOCK WILL REQUIRE IMPSCT
 PROTECTION PER 1609.1.4 FBC SUBMIT
 PRODUCT APPROVALS FOR SHUTTERS
  
 2) NO PRODUCT APPROVALS WERE SUBMITTED
 FOR FRENCH DOORS OR HORIZONTAL SLIDER
  
 3) ALL PRODUCT APPROVALS WERE SUBMITTED
 WITH ONLY THE STATE COVER SHEETS PLEASE
 SUMIT THE NOA'S, EVALUATION REPORTS
 AND/OR INSTALLATIONSHEETS THAT GO WITH
 THE COVER SHEET
  
 4) TWO STATE COVER SHEETS FOR SHINGLES
 FROM TWO DIFFERENT MANUFACTURERS PLEASE
 CLARIFY
  
 5) PRODUCT APPROVALS SHALL BE APPROVED
 BY DESIGNER OF RECORD PER 106.3.3 FBC*
  
 6) PROVIDE ENGINEERED TRUSS DRAWINGS
 WITH SUBMITAL PER R802.10 FBC
  
 7) PROVIDE ATTIC ACCESS LOCATION AND
 SIZE ON DRAWINGS THAT COMPLY WITH R807.1
 ALSO SEE M/E 100 AS FLOURESCENT FIXTURE
 MAY CROSS ACCESS
  
 8) PROVIDE 2 COPIES OF ENERGY CALCS AND
 MANUEL J
  
 9) SHOW DETAIL OF NEW BEAM-EXISTING
 TRUSS CONNECTION WITH LUS26
  
 10) PROVIDE FIN. FL. ELEVATION, BEAM
 ELEVATION, ROOF PITCH AND ELAVATION, AND
 MEAN ROOF HEIGHT ON A/200
  
 11) RADON FEE SHALL BE COLLECTED FOR THE
 STATE ON SQUARE FOOTAGE BEING ADDED PER
 10D-91 FAC
  
 12) A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT IS REQUIRED PRIOR TO A
 PERMIT BEING ISSUED
  
 BLDG PLAN REVIEW
 ADRIAN MORSE
 561-805-6716
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2006-04-17 Cont ID  
Sent By btrobaug Date 2006-04-17 Time 07:42 Rev Time 0.50
Received By btrobaug Date 2006-04-17 Time 07:28 Sent To M
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2006-03-22 Cont ID  
Sent By btrobaug Date 2006-02-21 Time 18:03 Rev Time 0.00
Received By amorse Date 2006-08-02 Time 11:02 Sent To M
Notes
2006-03-22 00:00:00 
 PLEASE MAKE THE FOLLOWING CORRECTIONS
 FOR CODE COMPLIANCE AND RESUBMIT FOR
 REVIEW.
  
 1} THE GROUNDING ELECTRODE CONDUCTOR
 MUST BE BONDED TO FOOTER STEEL PER
 250.52(A)(3).
  
 2} THE SERVICE ENTRANCE CONDUCTORS ARE
 TOO SMALL FOR A 200 AMP SERVICE. SEE
 310.16(B)(6).
  
 3} PLEASE SUBMIT A PANEL SCHEDULE SO
 THAT BRANCH CIRCUIT COMPLIANCE CAN BE
 REVIEWED.
  
 4} THE PLAN SHOWS AN ADDED A/C SYSTEM.
 THIS NEEDS TO BE ADDED TO THE
 CALCULATION, AND AT 100%, SEE 220.31(B).
  
 5} THE BATH RECEPTACLES MUST BE GFI PER
 210.8(A)(1).
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718
 [email protected]
 FAX/:561/659-8026
  
  

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2006-10-03 Cont ID  
Sent By adarroug Date 2006-10-03 Time 14:27 Rev Time 0.00
Received By adarroug Date 2006-10-03 Time 14:27 Sent To B
Notes
2006-10-03 00:00:00TO "AMORSE" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date   Cont ID  
Sent By   Date 2006-08-02 Time   Rev Time 0.00
Received By adarroug Date 2006-08-01 Time 17:32 Sent To  
Notes
2006-08-01 00:00:00SENT TO "AMORSE DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2006-07-28 Cont ID  
Sent By adarroug Date 2006-07-28 Time 14:23 Rev Time 0.00
Received By adarroug Date 2006-07-28 Time 14:23 Sent To Z
Notes
2006-07-28 00:00:00TO "Z" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2006-04-12 Cont ID  
Sent By adarroug Date 2006-04-12 Time 15:01 Rev Time 0.00
Received By adarroug Date 2006-04-12 Time 15:01 Sent To E
Notes
2006-04-12 00:00:00TO "BTROBAUG" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-02-08 Cont ID  
Sent By adarroug Date 2006-02-08 Time 09:31 Rev Time 0.00
Received By adarroug Date 2006-02-08 Time 09:31 Sent To E
Notes
2006-02-08 00:00:00TO "E" BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-03-21 Cont ID  
Sent By amorse Date 2006-03-21 Time 09:27 Rev Time 0.00
Received By amorse Date 2006-02-01 Time 17:57 Sent To  
Notes
2006-02-01 00:00:00TO "Z" BOX

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2006-04-17 Cont ID  
Sent By tgordon Date 2006-04-17 Time 08:54 Rev Time 0.25
Received By tgordon Date 2006-04-17 Time 08:54 Sent To B
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2006-03-22 Cont ID  
Sent By btrobaug Date 2006-04-17 Time 07:43 Rev Time 0.30
Received By tgordon Date 2006-03-22 Time 16:31 Sent To P
Notes
2006-03-22 00:00:00*** DENIED ***
 1) NEED TO SUBMIT ENERGY CALCULATIONS,
 PER 2004 FBC 13-600.0.ABC .
  
 MECHANICAL PLAN REVIEW BY;
 TOM GORDON (561) 805-6729.

Review Stop P PLUMBING
Rev No 2 Status P Date 2006-04-17 Cont ID  
Sent By jleech Date 2006-04-17 Time 07:16 Rev Time 0.00
Received By jleech Date 2006-04-17 Time 07:16 Sent To E
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2006-03-02 Cont ID  
Sent By tgordon Date 2006-03-22 Time 16:31 Rev Time 0.00
Received By jleech Date 2006-03-02 Time 08:53 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2006-07-30 Cont ID  
Sent By mmclean Date 2006-07-30 Time 11:33 Rev Time 0.00
Received By mmclean Date 2006-07-30 Time 11:33 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2006-02-07 Cont ID  
Sent By mmclean Date 2006-02-07 Time 11:20 Rev Time 0.00
Received By mmclean Date 2006-02-07 Time 11:20 Sent To I
Notes
2006-02-07 00:00:00NOTE: MUST PULL A SEPERATE PERMIT FOR
 FENCE/GATE WITH EASEMENT APPROVAL FROM
 THE CITY OF WEST PALM BEACH UTILITY DEPT