Plan Review Details - Permit 06010900
Plan Review Stops For Permit 06010900
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2006-03-14 Cont ID  
Sent By alange Date 2006-03-14 Time 13:54 Rev Time 0.50
Received By alange Date 2006-03-14 Time 13:49 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2006-02-17 Cont ID  
Sent By alange Date 2006-02-17 Time 10:39 Rev Time 0.50
Received By alange Date 2006-02-17 Time 10:39 Sent To  
Notes
2006-02-17 00:00:00DENIED
  
 SHOW SLAB DETAIL AND METHOD OF GENERATOR
 ATTACHMENT TO SLAB.
  
 ART LANGE
 BUILDING PLANS EXAMINER
 805-6672

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2006-03-14 Cont ID  
Sent By btrobaug Date 2006-03-14 Time 07:33 Rev Time 0.50
Received By btrobaug Date 2006-03-14 Time 07:19 Sent To B
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2006-02-09 Cont ID  
Sent By btrobaug Date 2006-02-09 Time 16:43 Rev Time 0.75
Received By btrobaug Date 2006-02-09 Time 11:10 Sent To M
Notes
2006-02-09 00:00:00 
 PLEASE MAKE THE FOLLOWING CORRECTIONS
 FOR CODE COMPLIANCE AND RESUBMIT FOR
 REVIEW.
  
 1} THE DEMAND ON THE EM PANEL EXCEEDS
 THE GENERATOR OUTPUT AND IS NONCOMPLIANT
 WITH 702.5.
  
 2} IT IS UNCLEAR ON THE SITE PLAN IF THE
 ATS, GENERATOR, AND SUBPANEL ARE LOCATED
 ON OR IN A SEPARATE STRUCTURE FROM THE
 MAIN SERVICE. PLEASE CLARIFY AND SEE
 ARTICLE 225.31 THROUGH 225.39. NOTE
 225.34 "GROUPING". THE ATS MUST COMPLY
 WITH THIS ARTICLE IF USED AS A
 DISCONNECT.
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718
 [email protected]
 FAX/:561/659-8026
  
  
  
  

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2006-02-14 Cont ID  
Sent By mperson Date 2006-02-14 Time 14:28 Rev Time 1.00
Received By mperson Date 2006-02-14 Time 14:28 Sent To B
Notes
2006-02-14 00:00:00REFERENCE: GAS PERMIT #05040186

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2006-03-03 Cont ID  
Sent By adarroug Date 2006-03-03 Time 12:02 Rev Time 0.00
Received By adarroug Date 2006-03-03 Time 12:02 Sent To E
Notes
2006-03-03 00:00:00TO "BTROBAUG" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2006-02-02 Cont ID  
Sent By adarroug Date 2006-02-02 Time 15:36 Rev Time 0.00
Received By adarroug Date 2006-02-02 Time 15:36 Sent To E
Notes
2006-02-02 00:00:00TO "GEN-RES" "E"

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-02-01 Cont ID  
Sent By adarroug Date 2006-02-01 Time 16:51 Rev Time 0.00
Received By adarroug Date 2006-02-01 Time 16:51 Sent To  
Notes
2006-02-01 00:00:001/30/06-SUBMITTAL OK AS PER "LMARTINEZ"
 ROUTED WITH PLANS IN REVIEW

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-03-14 Cont ID  
Sent By alange Date 2006-03-14 Time 13:54 Rev Time 0.00
Received By alange Date 2006-01-26 Time 16:33 Sent To  
Notes
2006-01-26 00:00:00TO "Z" BOX

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2006-02-13 Cont ID  
Sent By tgordon Date 2006-02-13 Time 14:26 Rev Time 0.15
Received By tgordon Date 2006-02-13 Time 14:26 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2006-02-14 Cont ID  
Sent By mperson Date 2006-02-14 Time 14:28 Rev Time 0.00
Received By mperson Date 2006-02-14 Time 14:28 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2006-01-31 Cont ID  
Sent By mmclean Date 2006-01-31 Time 17:43 Rev Time 0.00
Received By mmclean Date 2006-01-31 Time 17:43 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved