| 2006-02-04 00:00:00 | ALL REPAIRS MUST COMPLY WITH THE |
| | EXISTING BUILDING REPAIR SECTION AND |
| | OTHER APPLICABLE SECTIONS. |
| | 1)FBC 401.2 PERMITTED MATERIALS:EXCEPT |
| | AS OTHERWISE REQUIRED HEREIN,WORK SHALL |
| | BE DONE USING MATERIALS PERMITTED BY THE |
| | APPLICABLE CODE FOR NEW CONSTRUCTION OR |
| | USING LIKE MATERIALS SUCH THAT NO HAZARD |
| | TO LIFE,HEALTH OR PROPERTY IS CREATED. |
| | |
| | 2)FBC 401.3 CONFORMANCE:THE WORK SHALL |
| | NOT MAKE THE BUILDING LESS CONFORMING TO |
| | THE |
| | BUILDING,PLUMBING,MECHANICAL,ELECTRICAL |
| | OR FIRE CODES OF THE JURISDICTION,OR TO |
| | ALTERNATIVE MATERIALS,DESIGN AND METHODS |
| | OF CONSTRUCTION,OR ANY PREVIOUSLY |
| | APPROVED PLANS,MODIFICATIONS,OR |
| | COMPLIANCE ALTERNATIVES,THAN IT WAS |
| | BEFORE THE REPAIR WAS MADE. |
| | |
| | 3)FBC 1703.4.1 RESEARCH AND |
| | INVESTIGATION: |
| | |
| | A)REQUIRED SUBMITTAL: 2 COPIES OF THE |
| | TENDON PROFILE AND PLACEMENT PLAN |
| | APPLICABLE TO THE PROPOSED FLOOR |
| | REPAIR.INDICATE REPAIR LOCATION. |
| | |
| | B)EVIDENCE THAT THE PRELIMINARY FLOOR |
| | SLAB X-RAYS WERE COMPLETED. |
| | |
| | C)SUBMIT RESUME OF PREVIOUS POST-TENSION |
| | REPAIR WORK. |
| | |
| | D)ENGINEERING REPAIR LETTER SHOULD |
| | INDICATE THAT NO TYPE OF SHORING IS |
| | REQUIRED DURING THE REPAIR. |