Plan Review Details - Permit 06010269
Plan Review Stops For Permit 06010269
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2006-05-22 Cont ID  
Sent By amorse Date 2006-05-22 Time 09:19 Rev Time 0.00
Received By pschmitz Date 2006-05-25 Time 12:38 Sent To P
Notes
2006-05-25 00:00:00LOGED ACCIDENTALY PES
2006-05-22 00:00:00 
  
 **************REVISION*****************
  
 CHANGE OCCUPANCY TO ORIGINAL GROUP R.
 PROVISO FOR ELEVATIONS IS OK

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2006-03-16 Cont ID  
Sent By amorse Date 2006-03-16 Time 06:58 Rev Time 2.00
Received By amorse Date 2006-03-16 Time 06:58 Sent To PC
Notes
2006-03-16 00:00:00 
  
  
 ********PASSED WITH PROVISO*************
  
 1) INCORRECT PRODUCT APPROVALS FOR
 DOORS, SUBMIT AS REVISION BE SURE THAT
 NOA COVERS ALL THREE DOORS AS DRAWINGS
 SHOW DIFFERENT TYPES OF DOORS
  
 2) DESIGN PROFFESIONAL TO REVIEW AND
 APPROVE PRODUCTS REGULATED BY 9B-72 PER
 106.3.3 FBC* HAVE NXG SIGN OFF ON
 PRODUCT APPROVALS
  
 3) BE SURE THAT LAVATORY MEETS ALL OF
 THE REQUIREMENTS OF 11-4.19.2 FBC
  
 4) SIDE WALL GRAB BAR DOES NOT MEET THE
 REQUIREMENTS OF 11-4.16.4 AND FIGURE
 11-29 FBC
  
 5) DRAWINGS SHALL CONTAIN EXTERIOR
 ELEVATIONS PER 106.3.5 FBC* PLEASE
 ATTACH TO DRAWING SETS
  
 6) SUBMIT DRAWINGS TO COUNTY FOR IMPACT
 FEE STAMP. THEY MAY OR MAY NOT BE
 REQUIRED BUT DRAWINGS SHOULD BE STAMPED
 TO REFLECT THIS
  
  
 BLDG PLAN REVIEW
 ADRIAN MORSE
 561-805-6716

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2006-02-02 Cont ID  
Sent By amorse Date 2006-02-02 Time 14:10 Rev Time 0.50
Received By amorse Date 2006-02-02 Time 14:10 Sent To PC
Notes
2006-02-02 00:00:00 
  
 DENIED
  
 COMMENTS FROM 1ST REVIEW NOT ADDRESSED
  
 1) DRAWINGS SHALL REFLECT CHANGE OF
 OCCUPANCY TO BUSINESS GROUP B
  
 2) EXTERIOR WALL SECTION 4/A2 STATES
 THAT A NEW CONCRETE FLOOR WILL BE POURED
 BEFORE SLAB IS POURED TERMITE PROTECTION
 PER 1816 FBC SHALL BE PERFORMED
  
 3) ON EXTERIOR WALL SECTION 4/A2 SPECIFY
 THE ANCHOR/CLIP TO BE USED FOR STUD TO
 PLATE CONNECTIONS.
  
 4) DETAIL 1/A2 IS TITLED EXTERIOR WALL
 SECTION SHOULD BE INTERIOR
  
 5) ROOF PLAN ON A1 AND DETAIL 2/A2 SHOW
 DIFFERENT OVERHANG SIZES
  
 6) EXTERIOR WALL SECTION 3/A2 SPECIFIES
 HURRICANE TIE IN SCHEDULE ON S-2 NO
 STRUCTURAL DRAWINGS WERE SUPPIED. IS NEW
 HURRICANE STRAP #1 TYPICAL FOR ALL
 TRUSSES, IF SO INDICATE ON DRAWINGS
  
 7) ATTIC VENTILATION SHALL COMPLY WITH
 1203.2 FBC 2004. 50% OF THE REQUIRED
 VENTILATING AREA SHALL BE PROVIDED BY
 VENTILATORS IN THE UPPER PORTION OF THE
 SPACE AND AT LEAST 3FT ABOVE THE EAVE
 VENTS
  
 8) BUSINESS OCCUPANCY SHALL MEET ALL THE
 CODE REQUIREMENTS FOR EGRESS AND
 ACCESSIBILITY INCLUDING BUT NOT LIMITED
 TO:
  
 A) DOOR OPENINGS SHALL BE 32" CLEAR
 FROM STOP TO FACE OF DOOR OPEN AT 90
 DEGREES PER 11-4.13.5
  
  
  
  
  
  
 B) DOORS TO ACCESSIBLE TOILET ROOMS
 SHALL COMPLY WITH SECTION 11-4.13 AND
 SHALL NOT SWING INTO THE CLEAR FLOOR
 SPACE FOR ANY FIXTURE PER 11-4.22.2
  
 C) ACCESSIBLE TOILET ROOMS SHALL MEET
 ALL OF THE REQUIREMENTS OF CHAPTER 11
 FBC 2004
  
 D) DRAWINGS DO NOT SHOW DETAIL OF
 ELEVATION CHANGE AT EXIT EGRESS DOOR.
 DOOR SHALL COMPLY WITH 11-4.5.2
  
 E) DOOR HARDWARE SHALL MEET
 ACCESSIBILITY CODES PER 11-4.13.9
  
 F) KITCHEN SINK SHALL MEET
 ACCESSIBILITY REQUIREMENTS PER 11-4.24
  
 G) EXIT/ENTRANCE SHALL BE ACCESSIBLE TO
 AN ACCESSIBLE ROUTE TO PUBLIC
 TRANSPOTATION STOPS, ACCESSIBLE PARKING
 SPACES AND PASSENGER LOADING ZONE
  
 H) ONE PARKING SPACE SHALL BE HANDI-CAP
 ACCESSIBLE AND MEET THE REQUIREMENTS OF
 11-4.6.1 THROUGH 11-4.6.6 AND BE SHOWN
 ON DRAWINGS TO MEET COMPLIANCE
  
 9) PRODUCT APPROVALS FOR EXTERIOR DOORS
 HAVE BEEN REVISED, SUBMIT UPDATED COVER
 SHEET. PAGE 1 OF 7 IS MISSING THAT PAGE
 HAS THE DESIGN PRESSURES FOR THE PRODUCT
 THE METHOD OF ATTACHMENT SHALL BE
 CLEARLY MARKED ON THE PRODUCT APPROVALS.
  
 10) DRAWINGS SPECIFY THREE DIFFERENT
 TYPES OF DOORS IF SO SUBMIT PRODUCT
 APPROVALS FOR EACH
  
 11) WINDOW AND DOOR PRODUCT APPROVALS
 CALL FOR BUCKS BY OTHERS, SUBMIT A
 DETAIL ON PLANS FOR BUCK ATTACHMENT THAT
 MEETS THE CODE WIND PRESSURES
  
 12) ENSURE THAT EXISTING FRAMING HAS
 BACKING FOR SHUTTER ATTACHMENT IN WOOD
 FRAMED WALL, ROOM 104
  
  
  
  
  
  
  
  
  
  
 15) STORM PANEL PRODUCT APPROVALS SHALL
 SPECIFY TYPE OF FASTENER USED IN BOTH
 WOOD AND BLOCK,EDGE DISTANCE,SPAN,ETC.
 A SCHEDULE WITH ALL THE INFORMATION AND
 A KEY PLAN WITH WINDOW LOCATION SHUTTER#
 AND LOCATION OF EMERGENCY EGRESS
 EXPEDITES THE PLAN REVIEW AND INSPECTION
 PROCESS. FIND ENCLOSED A SAMPLE OF AN
 INSTALLATION SCHEDULE. MOST SHUTTER
 CONTRACTORS MAKE UP SIMILAR SCHEDULES
 FOR THE GENERAL CONTRACTOR
  
  
  
 BLDG PLAN REVIEW
 ADRIAN MORSE
 561-805-6716
  
  
  
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2006-01-19 Cont ID  
Sent By amorse Date 2006-01-19 Time 10:18 Rev Time 2.00
Received By amorse Date 2006-01-19 Time 10:18 Sent To  
Notes
2006-01-18 00:00:00 
  
 DENIED
  
  
 1) DRAWINGS SHALL REFLECT CHANGE OF
 OCCUPANCY TO BUSINESS GROUP B
  
 2) EXTERIOR WALL SECTION 4/A2 STATES
 THAT A NEW CONCRETE FLOOR WILL BE POURED
 BEFORE SLAB IS POURED TERMITE PROTECTION
 PER 1816 FBC SHALL BE PERFORMED
  
 3) ON EXTERIOR WALL SECTION 4/A2 SPECIFY
 THE ANCHOR/CLIP TO BE USED FOR STUD TO
 PLATE CONNECTIONS.
  
 4) DETAIL 1/A2 IS TITLED EXTERIOR WALL
 SECTION SHOULD BE INTERIOR
  
 5) ROOF PLAN ON A1 AND DETAIL 2/A2 SHOW
 DIFFERENT OVERHANG SIZES
  
 6) EXTERIOR WALL SECTION 3/A2 SPECIFIES
 HURRICANE TIE IN SCHEDULE ON S-2 NO
 STRUCTURAL DRAWINGS WERE SUPPIED. IS NEW
 HURRICANE STRAP #1 TYPICAL FOR ALL
 TRUSSES, IF SO INDICATE ON DRAWINGS
  
 7) ATTIC VENTILATION SHALL COMPLY WITH
 1203.2 FBC 2004. 50% OF THE REQUIRED
 VENTILATING AREA SHALL BE PROVIDED BY
 VENTILATORS IN THE UPPER PORTION OF THE
 SPACE AND AT LEAST 3FT ABOVE THE EAVE
 VENTS
  
 8) BUSINESS OCCUPANCY SHALL MEET ALL THE
 CODE REQUIREMENTS FOR EGRESS AND
 ACCESSIBILITY INCLUDING BUT NOT LIMITED
 TO:
  
 A) DOOR OPENINGS SHALL BE 32" CLEAR
 FROM STOP TO FACE OF DOOR OPEN AT 90
 DEGREES PER 11-4.13.5
  
  
  
  
  
  
 B) DOORS TO ACCESSIBLE TOILET ROOMS
 SHALL COMPLY WITH SECTION 11-4.13 AND
 SHALL NOT SWING INTO THE CLEAR FLOOR
 SPACE FOR ANY FIXTURE PER 11-4.22.2
  
 C) ACCESSIBLE TOILET ROOMS SHALL MEET
 ALL OF THE REQUIREMENTS OF CHAPTER 11
 FBC 2004
  
 D) DRAWINGS DO NOT SHOW DETAIL OF
 ELEVATION CHANGE AT EXIT EGRESS DOOR.
 DOOR SHALL COMPLY WITH 11-4.5.2
  
 E) DOOR HARDWARE SHALL MEET
 ACCESSIBILITY CODES PER 11-4.13.9
  
 F) KITCHEN SINK SHALL MEET
 ACCESSIBILITY REQUIREMENTS PER 11-4.24
  
 G) EXIT/ENTRANCE SHALL BE ACCESSIBLE TO
 AN ACCESSIBLE ROUTE TO PUBLIC
 TRANSPOTATION STOPS, ACCESSIBLE PARKING
 SPACES AND PASSENGER LOADING ZONE
  
 H) ONE PARKING SPACE SHALL BE HANDI-CAP
 ACCESSIBLE AND MEET THE REQUIREMENTS OF
 11-4.6.1 THROUGH 11-4.6.6 AND BE SHOWN
 ON DRAWINGS TO MEET COMPLIANCE
  
 9) PRODUCT APPROVALS FOR EXTERIOR DOORS
 HAVE BEEN REVISED, SUBMIT UPDATED COVER
 SHEET. PAGE 1 OF 7 IS MISSING THAT PAGE
 HAS THE DESIGN PRESSURES FOR THE PRODUCT
 THE METHOD OF ATTACHMENT SHALL BE
 CLEARLY MARKED ON THE PRODUCT APPROVALS.
  
 10) DRAWINGS SPECIFY THREE DIFFERENT
 TYPES OF DOORS IF SO SUBMIT PRODUCT
 APPROVALS FOR EACH
  
 11) WINDOW AND DOOR PRODUCT APPROVALS
 CALL FOR BUCKS BY OTHERS, SUBMIT A
 DETAIL ON PLANS FOR BUCK ATTACHMENT THAT
 MEETS THE CODE WIND PRESSURES
  
 12) ENSURE THAT EXISTING FRAMING HAS
 BACKING FOR SHUTTER ATTACHMENT IN WOOD
 FRAMED WALL, ROOM 104
  
  
  
  
  
  
  
  
  
  
 15) STORM PANEL PRODUCT APPROVALS SHALL
 SPECIFY TYPE OF FASTENER USED IN BOTH
 WOOD AND BLOCK,EDGE DISTANCE,SPAN,ETC.
 A SCHEDULE WITH ALL THE INFORMATION AND
 A KEY PLAN WITH WINDOW LOCATION SHUTTER#
 AND LOCATION OF EMERGENCY EGRESS
 EXPEDITES THE PLAN REVIEW AND INSPECTION
 PROCESS. FIND ENCLOSED A SAMPLE OF AN
 INSTALLATION SCHEDULE. MOST SHUTTER
 CONTRACTORS MAKE UP SIMILAR SCHEDULES
 FOR THE GENERAL CONTRACTOR
  
  
  
 BLDG PLAN REVIEW
 ADRIAN MORSE
 561-805-6716
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2006-05-19 Cont ID  
Sent By btrobaug Date 2006-05-19 Time 15:31 Rev Time 0.50
Received By btrobaug Date 2006-05-19 Time 15:03 Sent To M
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2006-03-13 Cont ID  
Sent By btrobaug Date 2006-03-13 Time 17:00 Rev Time 0.50
Received By btrobaug Date 2006-03-13 Time 16:42 Sent To M
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2006-01-31 Cont ID  
Sent By btrobaug Date 2006-01-31 Time 18:09 Rev Time 0.75
Received By btrobaug Date 2006-01-31 Time 17:45 Sent To B
Notes
2006-01-31 00:00:00 
 NO COMMENTS FROM THE PREVIOUS REVIEW
 WERE ADDRESSED.
  
  
 PLEASE MAKE THE FOLLOWING CORRECTIONS
 FOR CODE COMPLIANCE AND RESUBMIT FOR
 REVIEW.
  
 1} PROVIDE THE AIC RATING FOR THE
 SERVICE EQUIPMENT PER 110.9.
  
 2} SUBMIT A PANEL SCHEDULE SO THAT
 BRANCH CIRCUIT COMPLIANCE CAN BE
 REVIEWED.
  
 3} THE REFERENCE IN THE ELECTRICAL NOTES
 TO THE 2001 NEC ARE INCORRECT, WE ARE
 CURRENTLY UNDER THE 2002 EDITION.
  
 4} THE 3 SMALL APPLIANCE CIRCUITS IN THE
 LOAD CALCULATION MUST BE 1500 VA EACH
 PER 220.16(A).
  
 5} A RECEPTACLE MUST BE ADDED IN BEDROOM
 #3 TO COMPLY WITH 210.52(A)(1).
  
 6} A SMOKE DETECTOR IS REQUIRED OUTSIDE
 BEDROOM #3 PER 313.1 FBC(RES). BECAUSE
 THIS WOULD PLACE IT IN THE KITCHEN SEE
 NFPA-72 ARTICLE 11.8.3.5(4) FOR
 REQUIREMENTS.
  
 7} LOCATE A RECEPTACLE IN BEDROOM #1 TO
 COMPLY WITH 210.52(A)(2) AT ENTRANCE.
 SEE REVIEWED SET OF PLANS.
  
 8} A RECEPTACLE MUST BE ADDED IN THE
 DINING ROOM PER 210.52(A)(1), ALSO SEE
 210.52(B)(1).
  
 9} THE LOAD CALC INDICATES TWO A/C
 SYSTEMS, THERE IS ONLY ONE SHOWN ON THE
 DRAWINGS. PLEASE CORRELATE.
  
  
 ATTACHED IS THE REQUIRED VIOLATION
 NOTICE ADDRESSED TO THE DESIGN
 PROFESSIONAL PER 553.80(2)(B)FLORIDA
 STATUTES.
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718
 [email protected]
 FAX/:561/659-8026

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2006-01-13 Cont ID  
Sent By btrobaug Date 2006-01-13 Time 14:21 Rev Time 1.00
Received By btrobaug Date 2006-01-13 Time 10:12 Sent To M
Notes
2006-01-13 00:00:00 
 PLEASE MAKE THE FOLLOWING CORRECTIONS
 FOR CODE COMPLIANCE AND RESUBMIT FOR
 REVIEW.
  
 1} PROVIDE THE AIC RATING FOR THE
 SERVICE EQUIPMENT PER 110.9.
  
 2} SUBMIT A PANEL SCHEDULE SO THAT
 BRANCH CIRCUIT COMPLIANCE CAN BE
 REVIEWED.
  
 3} THE REFERENCE IN THE ELECTRICAL NOTES
 TO THE 2001 NEC ARE INCORRECT, WE ARE
 CURRENTLY UNDER THE 2002 EDITION.
  
 4} THE 3 SMALL APPLIANCE CIRCUITS IN THE
 LOAD CALCULATION MUST BE 1500 VA EACH
 PER 220.16(A).
  
 5} A RECEPTACLE MUST BE ADDED IN BEDROOM
 #3 TO COMPLY WITH 210.52(A)(1).
  
 6} A SMOKE DETECTOR IS REQUIRED OUTSIDE
 BEDROOM #3 PER 313.1 FBC(RES). BECAUSE
 THIS WOULD PLACE IT IN THE KITCHEN SEE
 NFPA-72 ARTICLE 11.8.3.5(4) FOR
 REQUIREMENTS.
  
 7} LOCATE A RECEPTACLE IN BEDROOM #1 TO
 COMPLY WITH 210.52(A)(2) AT ENTRANCE.
 SEE REVIEWED SET OF PLANS.
  
 8} A RECEPTACLE MUST BE ADDED IN THE
 DINING ROOM PER 210.52(A)(1), ALSO SEE
 210.52(B)(1).
  
 9} THE LOAD CALC INDICATES TWO A/C
 SYSTEMS, THERE IS ONLY ONE SHOWN ON THE
 DRAWINGS. PLEASE CORRELATE.
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718
 [email protected]
 FAX/:561/659-8026

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2006-05-18 Cont ID  
Sent By adarroug Date 2006-05-18 Time 11:24 Rev Time 0.00
Received By adarroug Date 2006-05-18 Time 11:24 Sent To E
Notes
2006-05-18 00:00:00TO "BTROBAUG" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2006-03-08 Cont ID  
Sent By adarroug Date 2006-03-08 Time 16:53 Rev Time 0.00
Received By adarroug Date 2006-03-08 Time 16:53 Sent To E
Notes
2006-03-08 00:00:00TO "BTROBAUG" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-02-01 Cont ID  
Sent By adarroug Date 2006-02-01 Time 09:31 Rev Time 0.00
Received By adarroug Date 2006-02-01 Time 09:31 Sent To M
Notes
2006-02-01 00:00:00TO "TGORDON" DESK AS PER "LMARTINEZ"

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-02-01 Cont ID  
Sent By amorse Date 2006-01-19 Time 15:25 Rev Time 0.00
Received By adarroug Date 2006-01-10 Time 09:58 Sent To  
Notes
2006-01-10 00:00:00TO "E" BOX

Review Stop M MECHANICAL (A/C)
Rev No 4 Status P Date 2006-05-19 Cont ID  
Sent By tgordon Date 2006-05-19 Time 16:19 Rev Time 0.30
Received By tgordon Date 2006-05-19 Time 16:19 Sent To B
Notes
2006-05-19 00:00:00REVISION TO MECH. PLANS. (SFR).

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2006-03-14 Cont ID  
Sent By tgordon Date 2006-03-14 Time 08:22 Rev Time 0.25
Received By tgordon Date 2006-03-14 Time 08:22 Sent To P
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2006-02-01 Cont ID  
Sent By tgordon Date 2006-02-01 Time 14:34 Rev Time 0.20
Received By tgordon Date 2006-02-01 Time 14:34 Sent To P
Notes
2006-02-01 00:00:00*** DENIED ***
 ** COMMENTS FROM LAST REVIEW 1/13/06
 HAVE NOT BEEN ADDRESSED, SEE BELOW.
 1) NEED TO SUBMIT ENERGY CALCULATIONS.
 ENERGY CALCULATIONS NEED TO BE ON FORM
 600A-04 (2004) PER FBC 13-600.3.A .
  
 2) NEED TO PROVIDE RETURN AIR IN
 BEDROOMS, SEE NOTE #3.
  
 3)BALANCED RETURN AIR.
 THIS MAY BE ACHIEVED BY.
 (A)TRANSFER DUCTS MAY ACHIEVE THIS BY
 INCREASING THE RETURN TRANSFER ONE AND
 ONE HALF TIMES THE CROSS SECTIONAL AREA
 (SQUARE INCHES) OF THE SUPPLY DUCT
 ENTERING THE ROOM OR SPACE IT'S SERVING
 AND THE DOOR HAVING AT LEAST AN
 UNRESTRICTED 1 INCHUNDERCUT TO ACHIEVE
 PROPER RETURN AIR BALANCE.
 (B)TRANSFER GRILLES SHALL USE 50
 SQUARE INCHES (OF GRILLE AREA) TO 100
 CFM (OF SUPPLY AIR) FOR SIZING
 THROUGH-THE-WALL TRANSFER GRILLES AND
 USING AN UNRESTRICTED 1-INCH
 UNDERCUTTING OF DOORS TO ACHIEVE PROPER
 RETURN AIR BALANCE
 (C)HABITABLE ROOMS ONLY SHALL BE
 REQUIRED TO MEET THESE REQUIREMENTS FOR
 PROPER BALANCED RETURN AIR EXCLUDING
 BATHROOMS, CLOSETS, STORAGE ROOMS AND
 LAUNDRY ROOMS, EXCEPT THAT ALL SUPPLY
 AIR INTO THE MASTER SUITE SHALL BE
 INCLUDED. PER 2004 FBC/R M1602.4 .
  
 4) AFTER GETTING YOUR ENERGY CAL'S.
 PLEASE CHECK THE MANUAL 'J' SECTION AND
 AJUST THE SIZE OF THE SUPPLY AIR DUCTS
 (FLEX) ACCORDINGLY, THEY APPEAR TO LARGE
 AT THIS TIME.
  
 5) PLEASE SHOW BATHROOM AND KITCHEN
 EXHUST DUCTS ON MECHANICAL PLANS.
  
 6) PLEASE SHOW A/C SYSTEM'S TOTAL AND
 SENSIBLE BTU'S ON MECHANICAL PLANS.
  
 MECHANICAL PLAN REVIEW BY;
 TOM GORDON (561) 805-6729.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2006-01-13 Cont ID  
Sent By tgordon Date 2006-01-13 Time 15:24 Rev Time 0.30
Received By tgordon Date 2006-01-13 Time 15:24 Sent To B
Notes
2006-01-13 00:00:00*** DENIED ***
 1) NEED TO SUBMIT ENERGY CALCULATIONS.
 ENERGY CALCULATIONS NEED TO BE ON FORM
 600A-04 (2004) PER FBC 13-600.3.A .
  
 2) NEED TO PROVIDE RETURN AIR IN
 BEDROOMS, SEE NOTE #3.
  
 3)BALANCED RETURN AIR.
 THIS MAY BE ACHIEVED BY.
 (A)TRANSFER DUCTS MAY ACHIEVE THIS BY
 INCREASING THE RETURN TRANSFER ONE AND
 ONE HALF TIMES THE CROSS SECTIONAL AREA
 (SQUARE INCHES) OF THE SUPPLY DUCT
 ENTERING THE ROOM OR SPACE IT'S SERVING
 AND THE DOOR HAVING AT LEAST AN
 UNRESTRICTED 1 INCHUNDERCUT TO ACHIEVE
 PROPER RETURN AIR BALANCE.
 (B)TRANSFER GRILLES SHALL USE 50
 SQUARE INCHES (OF GRILLE AREA) TO 100
 CFM (OF SUPPLY AIR) FOR SIZING
 THROUGH-THE-WALL TRANSFER GRILLES AND
 USING AN UNRESTRICTED 1-INCH
 UNDERCUTTING OF DOORS TO ACHIEVE PROPER
 RETURN AIR BALANCE
 (C)HABITABLE ROOMS ONLY SHALL BE
 REQUIRED TO MEET THESE REQUIREMENTS FOR
 PROPER BALANCED RETURN AIR EXCLUDING
 BATHROOMS, CLOSETS, STORAGE ROOMS AND
 LAUNDRY ROOMS, EXCEPT THAT ALL SUPPLY
 AIR INTO THE MASTER SUITE SHALL BE
 INCLUDED. PER 2004 FBC/R M1602.4 .
  
 4) AFTER GETTING YOUR ENERGY CAL'S.
 PLEASE CHECK THE MANUAL 'J' SECTION AND
 AJUST THE SIZE OF THE SUPPLY AIR DUCTS
 (FLEX) ACCORDINGLY, THEY APPEAR TO LARGE
 AT THIS TIME.
  
 5) PLEASE SHOW BATHROOM AND KITCHEN
 EXHUST DUCTS ON MECHANICAL PLANS.
  
 6) PLEASE SHOW A/C SYSTEM'S TOTAL AND
 SENSIBLE BTU'S ON MECHANICAL PLANS.
  
 MECHANICAL PLAN REVIEW BY;
 TOM GORDON (561) 805-6729.

Review Stop P PLUMBING
Rev No 4 Status P Date 2006-05-25 Cont ID  
Sent By pschmitz Date 2006-05-25 Time 12:42 Rev Time 0.00
Received By pschmitz Date 2006-05-25 Time 12:42 Sent To PC
Notes
2006-05-25 00:00:00REVISION: CHANGE OCCUPANCY BACK
 RESIDENTAL.

Review Stop P PLUMBING
Rev No 3 Status P Date 2006-03-15 Cont ID  
Sent By jleech Date 2006-03-15 Time 08:53 Rev Time 0.00
Received By jleech Date 2006-03-15 Time 08:53 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2006-02-01 Cont ID  
Sent By jleech Date 2006-02-01 Time 14:57 Rev Time 0.00
Received By jleech Date 2006-02-01 Time 14:57 Sent To B
Notes
2006-02-01 00:00:00DENIED;
 1.ALL OF THE OLD SANITARY PIPES MUST BE
 REMOVED PER FBC-2004 PLUMBING SEC.
 704.5.
 2.SUBMIT A SANITARY RISER DIAGRAM SEE
 ADMINISTRATION CODE 2004 EDITION SEC.
 106.3.5.4(9).
 3.MINIMUM PLUMBING FIXTURES TABLE
 403.1.7 (R-3) ONE AUTOMATIC CLOTHES
 WASHER HOOK UP IS REQUIRED.
 4.KITCHEN SINK MUST COMPLY WITH FBC-2004
 CHAPTER 11 SEC.11-4.24.1 THRU 11-4.24.7.
 PLEASE SHOW A DETAIL ON PLANS SINK MUST
 HAVE A 30" OPEN FRONT FOR A FRONTAL
 APPROACH.
 PLUMBING PLAN REVIEW BY;
 JOHN LEECH
 805-6695

Review Stop P PLUMBING
Rev No 1 Status F Date 2006-01-13 Cont ID  
Sent By jleech Date 2006-01-13 Time 12:55 Rev Time 0.50
Received By jleech Date 2006-01-13 Time 12:55 Sent To  
Notes
2006-01-13 00:00:00BATHROOM AND KITCHEN SINK MUST BE
 HADICAP ACCESSIBILITY. SEE FBC-2004
 CHAPTER 11.
 PLUMBING PLAN REVIEW BY;
 JOHN LEECH
 805-6695

Review Stop Z ZONING
Rev No 1 Status P Date 2006-01-17 Cont ID  
Sent By mmclean Date 2006-01-17 Time 14:45 Rev Time 0.00
Received By mmclean Date 2006-01-17 Time 14:45 Sent To B
Notes
***NONE***