Plan Review Details - Permit 05110803
Plan Review Stops For Permit 05110803
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2006-06-06 Cont ID  
Sent By lursu Date 2006-06-06 Time 09:04 Rev Time 0.00
Received By lursu Date 2006-06-06 Time 09:04 Sent To  
Notes
2006-06-06 00:00:00PERMIT ATTACHED TO EXT #0001 ,2475
 MERCER AVE FOR THE BLDG 2( THREE STORY
 OFFICE).IT WILL BE THE RESPONSIBILITY OF
 THE DEVELOPER TO ASSIGN THE INTERIOR
 UNITS NUMBERS.
 BASED ON THE ADDRESSING GUIDE EACH
 STRUCTURE SHALL BE ASSIGNED A NUMBER (
 SITE ADDRESS) .

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2007-10-25 Cont ID  
Sent By amorse Date 2007-10-25 Time 17:27 Rev Time 0.00
Received By amorse Date 2007-10-25 Time 17:27 Sent To PC
Notes
2007-10-25 17:29:02 
  
 BULDING REVISION OK,COVER SHEET AND SHEETS A-4 AND
 A-6

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2007-01-31 Cont ID  
Sent By jwitmer Date 2007-01-31 Time 14:25 Rev Time 3.33
Received By jwitmer Date 2007-01-30 Time 15:44 Sent To PC
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2006-10-20 Cont ID  
Sent By amorse Date 2006-10-20 Time 06:49 Rev Time 0.00
Received By amorse Date 2006-10-20 Time 06:49 Sent To PC
Notes
2006-10-20 06:50:24 
  
 DENIED
  
 1) FIXED WINDOWS APPEAR TO BE SEPERATE LITES IF SO
 MULLIONS ARE REQUIRED AND PRODUCT APPROVALS SHALL BE
 SUBMITTED
  
 2) THE STATE COVER FL#5259 FOR THE POLYSTICK
 UNDERLAYMENT IS NOT THE CORRECT COVER FOR THE
 MIAMI-DADE NOA PLEASE SUBMIT CORRECT COVER (FL#986-R1)
  
 3) THE STATE COVER FL#2795 FOR THE FIXED WINDOWS ARE
 FOR THE 2001 CODE CYCLE, YALE OGRON DOES NOT YET HAVE
 STATE APPROVAL FOR THIS PRODUCT SO A LOCAL PRODUT
 APPROVAL WAS GIVEN FOR THE MIAMI-DADE NOA. THE SAME
 APPLIES TO THE SMITH MOUNTAIN ENTRANCE DOOR & TRANSOM
 NOA'S
  
 4) PROVIDE THE UL LISTING/SYSTEM USED TO MEET THE ONE
 HOUR RATING FOR THE CEILING AND ATTIC ACCESS PANELS.
 DRAWINGS ONLY SHOW ONE LAYER 5/8" TYPE X WHICH IS A 40
 MINUTE RATING
  
 5) PROVIDE ENERGY CALC'S PER 13-101.1.6 FBC USING
 METHOD B AS PER CONVERSATION WITH PATTY KRAUSS (MECH
 PLAN REVEIW) AND SHOW COMPLIANCE ON THE CONSTRUCTION
 DOCUMENTS
  
 6) PER ELEVATOR SHOP DRAWINGS PROVIDE MINIMUM ONE HR
 RATED DOOR TO THE MACHINE ROOM COMPLETE WITH CLOSER AND
 LOCK
  
 7) PROVIDE HARDWARE SCHEDULE WITH HARDWARE THAT MEETS
 THE ACCESSABILITY REQUIREMENTS PER 11-4.13.8 THROUGH
 11-4.13.11
  
 8) PROVIDE SHORING PLANS FOR BEAMS (OTHER THAN TAHT
 ALREADY SUPPLIED FOR EPICORE)
  
 9) ENGINEERS SHALL LEGIBLY INDICATE THEIR NAME,
 ADDRESS, AND LICENCE NUMBER ON EACH SHEET THAT BEARS
 THEIR SEAL PER
 61G15-23.002(2) FAC GUARD RAIL DETAIL IS MISSING
 ENGINEERS NAME AND PE LICENCE NUMBER
  
 10) FIRE SPRINKLERAND EPICORE FRAMING LAYOUT PLANS DO
 NOT CARRY AN ORIGINAL "SIGNATURE" AS REQUIRED BY
 61G15-23.002(2) FAC AND THE FLORIDA BOARD OF
 PROFESSIONAL ENGINEERS
  
 11) THE ENGINEER SEAL ON THE TRUSS LAYOUT PLANS AND
 INDEX SHEETS DOES NOT MEET THE REQUIREMENTS OF
 61G15-23.001 FAC, 471.025 FS AND THE FBPE THAT THE
 WORDING ON THE SEAL SHALL CHANGE FROM CERTIFICATE TO
 LICENCE
  
 12) THE CLAIMED VALUATION ON THE PERMIT APPLICATION IS
 LOW. FOR PERMITTING PURPOSES, VALUATION OF BUILDINGS
 AND SYSTEMS SHALL BE THE TOTAL REPLACEMENT COST
 EXCLUDING LAND VALUE. OUR VALUATION REFERENCE IS ICC
 (BVD), MARSHALL-SWIFT AND MEANS COST ANALYSIS SERVICES
 PER 108.3 FBC* PLEASE SEE THAT THE VALUE HAS BEEN
 INCREASED AND FEES ARE DUE
  
 13) A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT IS REQUIRED PRIOR TO
 A PERMIT BEING ISSUED
  
 14) NOTE: AN ELEVATION CERTIFICATE WILL BE REQUIRED
 PRIOR TO THE ISSUANCE OF A CO
  
 BLDG PLAN REVIEW
 ADRIAN MORSE
 561-805-6716
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2006-03-03 Cont ID  
Sent By amorse Date 2006-03-03 Time 12:26 Rev Time 0.00
Received By amorse Date 2006-03-03 Time 12:26 Sent To PC
Notes
2006-03-03 00:00:00 
  
  
  
 DENIED
  
 1) SUBMIT PRODUCT APPROVALS,
 THOSE PRODUCTS WHICH ARE REGULATED BY
 DCA RULE 9B-72 SHALL BE REVIEWED AND
 APPROVED IN WRITING BY THE DESIGNER OF
 RECORD PRIOR TO SUBMITTAL FOR
 JURISDICTIONAL APPROVAL PER 106.3.3 FBC*
  
 2) SUBMIT SITE PLAN,
 DRAWINGS SHALL SHOW THE LOCATION OF ALL
 WORK, INCLUDING THE PROPOSED BUILDING(S)
 OR STRUCTURE(S), AND ALL EXISTING
 MAN-MADE IMPROVEMENTS AND EVERY EXISTING
 SURVEY, OR OTHER SPECIAL SURVEY,
 PREPARED BY A QUALIFIED SURVEYOR. PER
 106.3.4 FBC*
  
 3) SUBMIT SOIL REPORT PER 1802.2.1 FBC
 AND 106.3.5.1.1 FBC*
  
 4) DRAWINGS SHALL SPECIFY CONSTRUCTION
 TYPE WITH AREA AND HEIGHT MODIFICATIONS
 USED TO MEET CODE
  
 5) AN AUTOMATIC FIRE SPRINKLER SYSTEM
 SHALL BE INSTALLED PER 903.2.10 FBC,
 PROVIDE DRAWINGS
  
 6) PROVIDE ENERGY CALCULATIONS AND
 COMPLIANCE WITH 13-101.1.6 AND
 13-103.1.1.1 FBC
  
 7) SUBMIT ENGINEERED TRUSS DRAWINGS PER
 2303.4.1 AND ENGINEERING NOTE 1 OF TRUSS
 DESIGN CRITERIA ON S/4
  
 8) S/4 HAS REFERENCE TO STANDING SEAM
 METAL ROOF AND A/3 HAS CONCRETE ROOF
 TILE, CLARIFY
  
 9) GUARDS ON A/3 AND A/5 DO NOT MATCH
  
 10) SIGN AND AWNINGS SHALL BE SUBMITTED
 UNDER SEPERATE PERMITS
  
 11) DRAWINGS MISSING SITE,PARKING,ETC,
 TO REVIEW FOR ACCESSABILITY, COMPLY WITH
 REQUIREMENTS OF CHAPTER 11 FBC
  
 12) DRAWINGS MISSING REQUIRED FOR REVIEW
 OF EGRESS, COMPLY WITH REQUIREMENTS OF
 CHAPTER 10 FBC
  
 13) BEFORE A PERMIT TO CONSTRUCT, MAY BE
 ISSUED, IMPACT FEES MUST BE PAID TO
 PALM BEACH COUNTY. THE ACTUAL PERMIT SET
 OF PLANS MUST BE STAMPED BY THAT
 OFFICE, AND A COPY OF THE PAID RECEIPT
 ATTACHED TO THE PERMIT APPLICATION.
 PLEASE CALL (561)233-5025 FOR MORE
 INFORMATION.
  
 14) PROVIDE STAIR SHOP DRAWINGS FOR
 COMPLIANCE, ATTACHMENT, ETC.
  
 15) PROVIDE COMPLIANCE OF GUARDS WITH
 1607.7 FBC
  
 16) UPON SUBMITTAL OF THESE REQUIREMENTS
 FURTHER COMMENTS MAY BE GENERATED
  
 NOTE: FBC = FLORIDA BUILDING CODE 2004
 FBC* = WEST PALM BEACH
 ADMINISTATIVE AMMENDMENTS TO FBC
 FAC = FLORIDA ADMINISTRATIVE CODE
  
  
 BLDG PLAN REVIEW
 ADRIAN MORSE
 561-805-6716
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  

Review Stop E ELECTRICAL
Rev No 5 Status P Date 2007-10-07 Cont ID  
Sent By dpalmer Date 2007-10-07 Time 09:48 Rev Time 0.00
Received By dpalmer Date 2007-10-07 Time 09:48 Sent To PC
Notes
2007-10-07 09:49:19REV FOR PARKING LOT
 LIGHTING/POLES/FIXTURES/CIRCUITING.
 OK, STAMPED.

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2007-09-20 Cont ID  
Sent By dpalmer Date 2007-09-20 Time 12:18 Rev Time 0.00
Received By dpalmer Date 2007-09-20 Time 11:38 Sent To FIRE
Notes
2007-09-20 12:19:07** REDLINED LETTER AS IT STATES THE 2005 NEC, WHEN
 PROJECT IS ACTUALLY PERMITTED UNDER THE 2002 NEC.

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2006-12-29 Cont ID  
Sent By dpalmer Date 2006-12-29 Time 17:40 Rev Time 0.00
Received By dpalmer Date 2006-12-29 Time 16:31 Sent To  
Notes
2006-12-29 17:17:07** PROVISO **
  
 NOTES REDLINED, AND NOTES FOR INFORMATION ****
  
 PLANS ARE TO BE REVISED FOR NOTES #1 AND #2 BELOW
 ALONG WITH ANY OTHER REVISIONS BEFORE ROUGH.
  
  
 *** 1) ELECTRICAL ROOMS, EQUIPMENT ROOMS, PIT AREA AND
 ROOMS OF THE LIKE SHALL CONTAIN AUTOMATIC MEANS FOR
 LIGHTING TO TURN OFF AS REQUIRED PER FBC
 13-415.1.ABC.1.1, .1.2, AND .1.3
 THIS WAS NOT ON ORIGINAL REVIEW , AS THIS WAS NOT KNOWN
 TO THIS OFFICE.
 ** AS INFORMATION FOR FUTURE BUILD OUTS, ALL SHALL
 COMPLY COMPLETELY WITH THE NEW REQUIREMENTS UNDER THE
 NEW 2004 FBC CHAPTER 13.
  
 ** 2) PLEASE SEE THE MINIMUM LEVELS FOR HORN/STROBES
 SHALL MEET 2004 FBC 11-4.28.2, .3(4).
 75 MIN CANDELAS ON STROBES AND 15DB MIN FOR HORNS. THIS
 COMMENT WAS NOT MADE ON ANY PREVIOUS ELECTRICAL REVIEWS
 AS IT HAS NOW ONLY BECOME ONE OF THE ITEMS ELECTRICAL
 PLAN REVIEW WILL BE REQUIRED TO REVIEW FOR.
  
 3) PLEASE SEE THE TRUSS PLANS SUBMITTED STILL DO NOT
 CONTAIN AN ORIGINAL SIGNATURE, THEY ARE IN FACT COLOR
 PHOTO-COPIES. SEE BUILDING REVIEW NOTES OR BE SURE TO
 SUBMIT/CHANGE THESE DOCUMENTS OUT BEFORE BUILDING
 REVIEW COMMENCES
 IF THERE ARE ANY QUESTIONS ON THIS OR WHEN AN
 APPOINTMENT TO DO SO CAN BE SET UP, PLEASE CALL.
  
  
 IF THERE ARE ANY QUESTIONS, PLEASE DO NOT HESIATE IN
 CONTACTING THIS OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2006-09-21 Cont ID  
Sent By dpalmer Date 2006-09-21 Time 19:17 Rev Time 0.00
Received By dpalmer Date 2006-09-21 Time 15:53 Sent To  
Notes
2006-09-21 00:00:00***** UNSAT 2ND REVIEW *****
  
 BLGD "B".
  
 ** PLEASE SEE THE FOLLOWING COMMENTS,
 SOME OF WHICH ARE BEING NOTEDBY THIS
 REVIEWER AS A "HEADS-UP". THESE ITEMS
 ARE REQUIRED FOR COMPLIANCE FOR THE
 ENTIRE PROJECT.
 PLEASE SEE MANY ARE NOT FOR THE
 ELECTRICAL REVIEW.
 PLEASE SEE SOME ITEMS WHICH ARE REQUIRED
 FOR ELECTRICAL .
 PLEASE SEE ONLY ONE COMMENT FROM
 PREVIOUS ELECTRICAL REVIEW STILL STANDS
 AND SOME NEW COMMENTS BASED ON PLANS
 SUBMITTED.
  
  
 1) NOTE: PLEASE SEE MISSING FOOTER STEEL
 REQUIRED TO BE PART OF THE GROUNDING
 ELECTRODE SYSTEM. 250.50
 PLEASE SEE CWP, GRND RODS AND BLDG STEEL
 IS BEING SHOWN, ONLY MISSING FOOTER
 STEEL.
  
 2) NOTE: PLEASE SEE FA SHEETS SUBMITTED
 SEPARATELY FROM SETS WHICH ARE NOT
 SIGNED , DATED OR SEALED BY THE ENGINEER
 OF RECORD. PLEASE ALSO SEE SHEETS
 WITHOUT TITLE BLOCKS.
 PLEASE SEE FBC 106.1 FOR MINIMUM
 REQUIRMENTS FOR PLANS/DRAWINGS TO BE
 SUBMITTED. (SCALE/CLARITY ETC)
 FS 471.025
  
 3) NOTE: PLEASE SEE ALL FIRE SPRINKLER
 PLANS WHICH CONTAIN A "RUBBER STAMP" FOR
 THE ENGINEER OF RECORD. PLEASE KNOW,
 THIS HAS BEEN NOTED ON OTHER PROJECTS
 FOR THE SAME ENGINEER THAT A "RUBBER
 STAMP" FOR THE REQUIRED ORIGINAL
 SIGNATURE IS NOT ACCEPTABLE UNDER FAC
 61G15-23.002, FLORIDA STATUES 471.025.
 PLEASE ALSO SEE THE SEAL FOR SAID
 ENGINEER IS ALSO NO LONGER VALID AS THE
 SEAL HAS EXPIRED PER RULING IN THEFAC
 61G15-23.001. THE RULING PASSED IN FEB
 "04"WHICH REQUIRED THE WORDING OF
 "CERTIFICATE" TO CHANGE TO "LICENSE" FOR
 ALL ENGINEERS. PLEASE KNOW THE STATE
 FBPE'S HAD ANEXTENSIONGRANTED FOR
 ALMOST TWO YEARS TO GIVE ALL ENGINEERS
 TIME TO OBTAIN THEIR NEW SEALS. THIS
 EXTENED DATE WAS TO DEC 31ST, 2005.
 PLEASE KNOW AS THIS HAS BEEN STATED ON
 PREVIOUS PROJECTS AND PLANS ARE STILL
 COMING IN WITH A "RUBBER STAMP" FROM
 THIS DESIGN PROFESSIOAL, ONE SET OF EACH
 PLAN FOR EACH SET AND EACHBUILDING IS
 NOW BEING RETAINED BY THIS OFFICE FOR
 FILE. PLEASE KNOW THIS MAY BE TURNED
 OVER TO THE FLORIDA BOARD OF
 PROFESSIONAL ENGINEERS FOR REVIEW AND
 STATE'S LEGAL COUNSEL TO THE BOARD.
  
 4) NOTE: PLEASE SEE TRUSS PLANS. PLEASE
 SEE BUILDING REVIEW COMMENTS.
 A)PLEASE SEE THE FAC 61G15-23.001. THE
 RULING PASSED IN FEB "04" REQUIRED THE
 WORDING OF "CERTIFICATE" TO CHANGE TO
 "LICENSE" FOR ALL ENGINEERS. PLEASE KNOW
 THE STATE FBPE'S HAD ANEXTENSION TO
 DEC 31ST, 2005. PLEASE OBTAIN NEW SEAL.
 B) PLEASE ALSO SEE THAT THESE SHEETS
 ALSO DO NOT CONTAIN AN ORIGINAL
 SIGNATURE AS REQUIRED UNDER FS 471.025,
 FAC 61G15-23.002.
 THESE MAY ALSO BE RETAINED.
  
 5) NOTE: PLEASE SEE SETS OF PLANS FOR
 THE "EPICORE FRAMING PLAN". PLEASE SEE
 THESE CONTAIN A RAISED SEAL OVER
 SIGNATURES WHICH ARENOT ORIGINAL AND
 ARE "PHOTO-COPIES" OF THE ENGINEER'S
 SIGNATURE WHICH IS REQUIRED TO BE
 ORIGINAL.
 PLEASE KNOW THESE ALSO MAY BE RETAINED
 AS ALL SETS FOR BOTH BLDG'S ARE THE SAME
 AS NOTED.
  
 6) NOTE: PLEASE SEE SURVEY'S , PLEASE
 SEE THESE ALSO CONTAIN A RAISED SEAL
 OVER A "COPIED" SIGNATURE WHICH IS NOT
 PERMITTED UNDER FAC 61G17 AND FS
 472.025.
 PLEASE BE SURE THESE ARE SIGNED WITH
 ORIGINAL SIGNATURE.
  
 ** PLEASE SEE THE COMMENTS FOR THE
 ELECTRICAL ENGINEERING FIRM ARE MINOR
 EXCEPT FOR THE FA SHEETS.
  
 ** PLEASE KNOW, THE SIGNING, DATING AND
 SEALING OF ALL DOCUMENTS IS MOST
 IMPORTANT!!
  
 ** IMPORTANT**
  
 ONCE ALL REVIEWS ARE DONE AND PLANS ARE
 PICKED UP FOR CORRECTIONS, PLEASE BE
 SURE TO COMPLETELY REMOVE ALL OLD/VOIDED
 SHEETS AND ONLY INSERT NEW REVISED
 SHEETS INTO TWO COMPLETE SETS FOR REVIEW
 AND STAMPING. DO NOT LEAVE ANY
 OLD/VOIDED SHEETS IN SETS.
 PLEASE KNOW ONLY ONE SET OF THE
 OLD/VOIDED SHEETS SHOULD BE SUBMITTED
 FOR REFERENCE.
 PLEASE SEE COMPLETE SETS WITH ALL
 ARCHITECTURAL PLANS WERE NOT MADE INTO
 THE SETS SUBMITTED.
 THIS WILL HELP IN THE REVIEW PROCESS AND
 AVOID ANY DELAYS.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CONSTRUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  
  
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2005-12-25 Cont ID  
Sent By dpalmer Date 2005-12-25 Time 11:06 Rev Time 0.00
Received By dpalmer Date 2005-12-25 Time 10:55 Sent To  
Notes
2005-12-25 00:00:00IN ELEC FOR REVIEW
 *** UNSAT ***
  
 1)NOTE: PLEASE BE SURE PLANS, A-SHEETS
 ETC REFERENCE THE CURRENT CODES IN
 EFFECT AND APPLIED UNDER.
 (2004 FBC , 2002 NFPA-72, 2003 NFPA-101,
 2002 NFPA-70
  
 2)NOTE: PLEASE SSE FIRE REVIEW COMMENTS
 WHICH MAY HAVE A DIRECT AFFETC ON
 ELECTRICAL PLANS.
  
 3)NOTE: PLEASE SEE NFPA-101 7.8 , 7.9
 WHICH REQUIRES STAIRWAYS TO HAVE A MIN
 OF 10FT CANDLES DURING NORMAL POWER AND
 1FT CANDLE UNDER EM POWER/BATTERY BACK
 UP.
 PLEASE PROVIDE PHOTOMETRICS FOR THIS.
 MAY BE A BRIEF DETAIL FOR THE MIN NEEDED
 TO PUBLIC RIGHT OF WAY.
  
 4)NOTE: PLEASE SEE 250.50 WHICH ALSO
 REQUIRES THE FOOTER STEEL TO BE PART OF
 THE GROUNDING ELECTRODE SYSTEM. PLEASE
 ADD.
 PLEASE INCLUDE.
  
 5)NOTE: PLEASE CORRLELATE RISER WITH
 HOUSE PANEL. PLEASE SEE RISER INDICATES
 PANEL "H" AS 225A MCB , HOWEVER PANEL
 INDICATES BEING MLO?
  
 6)NOTE:
  
 7)NOTE: PLEASE CLARIFY THE EQUIPMENT
 GROUNDING CONDUCTOR FROM MAIN TO HOSE
 PANEL.
 250.110,250.24, 250.122
  
 ** PLEASE REMOVE ANY OLD/VOIDED SHEETS
 FROM SETS AND ONLY INSERT NEW REVISED
 SHEETS INTO COMPLETE SETS FOR REVIEW AND
 STAMPING.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVEIW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE IN CONTACTING
 THIS OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2006-10-27 Cont ID  
Sent By rchokshi Date 2006-10-27 Time 11:39 Rev Time 0.00
Received By rchokshi Date 2006-10-27 Time 11:31 Sent To  
Notes
2006-10-27 11:39:45I TALKED TO PAUL BURI OF SIMMON & WHITE THAT HE WILL
 REMOVE THE WORD SECTION E-E FROM SHEET 4 OF 10 CIVIL
 DRAWINGS WHEN ARCHITECH RESUBMIT WITH EVERYBODY'S
 COMMENTS. ALL OTHER ENG COMMENTS ARE TAKEN CARE.
 THEREFORE, IT IS APPROVED BY ENG.RASIK CHOKSHI
 805-6723

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2006-09-22 Cont ID  
Sent By rchokshi Date 2006-09-22 Time 10:46 Rev Time 0.00
Received By rchokshi Date 2006-09-22 Time 10:22 Sent To  
Notes
2006-09-22 00:00:00FAILED FOR FOLLOWING REASONS:
  
 1. SHEET 4 0F 10,WHERE IS SEC E-E
 DETAILS.PLEASE SHOW ALL CONTROL
 STRUCTURES, & DETAILS,
 ELEVATIONS,BLEEDER ELE ETC.,
 2. PLEASE WRIRE NOTES THAT MEET
 STANDARDS OF CITY OF WPB FOR
 SIDEWALK,DRIVEWAY, PARKING,ADA,& ALSO
 SHOW DUMPSTER ENCLOSURE DETAILS.
 3. PLEASE SHOW ALL CATCH BASINS IN THE
 SURROUNDING SITE, TO MAKE SURE THAT YOUR
 SITE INCLUDING NEIGHBOURS DO NOT GET
 FLOODED.
 4. PLEASE SHOW CENTERLINE OF THE ROAD
 ELE.,SIDEWALK ELE.,PARKING LOT ELE, &
 FIRST FLOOR ELE., ALL THESE MUST MEET
 FLORIDA BUILD. CODES.
  
 PLEASE RESPOND EACH ITEM TO EXPEDITE
 YOUR PERMIT.
  
 RASIK CHOKSHI 805-6723

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2006-01-20 Cont ID  
Sent By mamini Date 2006-01-20 Time 14:13 Rev Time 0.50
Received By mamini Date 2006-01-20 Time 14:12 Sent To  
Notes
2006-01-20 00:00:00FAILED:
  
 1. PLEASE PROVIDE CIVIL/SITE PLANS FOR
 OURE REVIEW AND APPROVAL, SUBMITAL
 SHOULD INCLUDE STORM WATER CALCULATION,
 POLLUTION PREVENTION PLANS.NOTE THAT
 CIVIL PLANS ALSO SHOULD BE SUBMITTED TO
 THE PUBLIC UTILITIES AND ENGINEERING FOR
 ALL THE CONNECTION TO THE CITY SERVICES,
 WATER, SEWER, BACKFLOWS AND METER'S
 LOCATIONS, ATT; MANNY GONZALEZ 494-1086.
  
 IF ANY QUESTION PLEASE CONTACT 805-6723
 MOHAMMAD R. AMINI

Review Stop FIRE FIRE DEPARTMENT
Rev No 5 Status P Date 2007-10-25 Cont ID  
Sent By mawillia Date 2007-10-25 Time 17:14 Rev Time 0.00
Received By mawillia Date 2007-10-25 Time 17:12 Sent To  
Notes
2007-10-25 17:13:53*****APPROVED (REVISION)*****
  
  
 REVISED COVER SHEET,A-4, AND A-6 WERE REVIEWED;NO
 FIRE-STAMP NEEDED.
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 4 Status P Date 2007-10-03 Cont ID  
Sent By mawillia Date 2007-10-03 Time 11:28 Rev Time 0.00
Received By mawillia Date 2007-10-03 Time 10:59 Sent To  
Notes
2007-10-03 11:28:35*****APPROVED*****
  
  
 REVISED PLAN SHEET E-1B AND NEWLY ADDED SHEET FAB-1
 WERE STAMPED, INITIALED, AND DATED.

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2007-01-31 Cont ID  
Sent By mawillia Date 2007-01-31 Time 14:16 Rev Time 0.00
Received By mawillia Date 2007-01-31 Time 14:16 Sent To  
Notes
2007-01-31 14:19:48*****APPROVED*****
  
  
 SHEETS A-3, E-1B, AND FS-1 WERE STAMPED, INITIALED, AND
 DATED.

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2006-10-17 Cont ID  
Sent By mawillia Date 2006-10-17 Time 16:57 Rev Time 0.00
Received By mawillia Date 2006-10-17 Time 16:57 Sent To  
Notes
2006-10-17 17:27:01*****APPROVED*****
  
  
 **RESPONSES TO PREVIOUS FIRE PLAN REVIEW COMMENTS
 (12/23/2005) ACCEPTABLE AS FOLLOWS:
  
 01.)PLEASE NOTE THAT AS PER WEST PALM BEACH CODE, THE
 NUMERICAL ADDRESS ON THE BUILDING SHALL BE NO LESS THAN
 6" IN HEIGHT ANDNO LESS THAN 1" IN WIDTH.IF A
 MONUMENT SIGN/MARQUEE IS ERECTED, THE ADDRESS OR A
 RANGE OF ADDRESSES ARE REQUIRED.
  
 02.)OK;SEE ELECTRICAL PLAN REVIEW NOTE #3;TO BE
 CORRECTED WHEN THE FIRE SPRINKLER PERMIT AND PLANS ARE
 SUBMITTED.
  
 03.)OK
  
 04.)SO NOTED.
  
 05.)SEE NOTE #2.
  
 06.)OK
  
 07.)OK;SEE ELECTRICAL PLAN REVIEW NOTE #2;TO BE
 CORRECTED WHEN THE FIRE ALARM PERMIT AND PLANS ARE
 SUBMITTED.
  
 08.)OK
  
 09.)OK
  
 10.)OK
  
 11.)OK
  
 12.)OK
  
 13.)SO NOTED.
  
 14.)OK
  
 15.)SO NOTED.
  
  
  
  
 CAPT. MICHAEL A. WILLIAMS
 FIRE PLAN REVIEW
 561-805-6722
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2005-12-23 Cont ID  
Sent By mcarsill Date 2005-12-23 Time 09:47 Rev Time 0.00
Received By mcarsill Date 2005-12-23 Time 09:28 Sent To  
Notes
2005-12-23 00:00:001. BUILDING ADDRESS REQUIRED. A MINIMUM
 OF AT LEAST 6" HIGH NUMBERS ARE
 REQUIRED.
  
 2. BUILDING WILL BE REQUIRED TO BE FIRE
 SPRINKLER PROTECTED IN ACCORDANCE WITH
 FS 553.895 (2)
  
 3. COULD NOT LOCATE ANY EXISTING OR NEW
 FIRE HYDRANTS.
  
 4. A KNOX-BOX WILL BE REQUIRED FOR THE
 BUILDING.
  
 5. NO FIRE SPRINKLER DRAWINGS PROVIDED
 WITH PLANS.
  
 6. SEPERATE PLANS AND PERMITS REQUIRED
 FOR FIRE SPRINKLER SYSTEM.
  
 7. SEPERATE PLANS AND PERMITS REQUIRED
 FOR FIRE ALARM SYSTEM. FIRE ALARM SYSTEM
 SHALL BE MONITORED BY A UL LISTED
 CENTRAL STATION APPROVED FOR CENTRAL
 STATION SERVICE.
  
 8. PLEASE PROVIDE PRESCRIPTVE STRENGTH
 REQUIREMENTS FOR ALL HANDRAILS AND
 GUARDRAILS. DETAILS LOCATED ON PAGE A-6.
  
 9. MORE DETAILS REQUIRED ON AWNINGS.
 FLAME RETARDANCY WILL BE REQUIRED.
  
 10. TENANT IMPROVEMENTS SHALL HAVE
 EMERGENCY LIGHTING AND ILLUMINATED EXIT
 SIGNS.
  
 11. PLEASE ILLUSTRATE PORTABLE FIRE
 EXTINGUISHER LOCATIONS.
  
 12. RENOVATION, CONSTRUCTION, AND
 DEMOLITION SHALL COMPLY WITH NFPA 241.
  
 13. SUITABLE ROADS ARE TO BE PROVIDED
 DURING CONSTRUCTION.
  
 14. THE FIRE DEPARTMENT SPRINKLER
 CONNECTION SHALL BE LOCATED NO FARTHER
 THAN 150 FEET FROM A FIRE HYDRANT.
  
 15. KNOX-BOX LOCKING CAPS SHALL BE
 PROVIDED ON THE FIRE DEPARTMENT
 CONNECTION.
  
 MIKE CARSILLO, CHIEF FIRE PREVENTION
 OFFICER
 804-4709

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2007-12-19 Cont ID  
Sent By adarroug Date 2007-12-19 Time 16:09 Rev Time 0.00
Received By adarroug Date 2007-12-19 Time 16:09 Sent To Z
Notes
2007-12-19 16:11:06TO "Z" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2007-10-05 Cont ID  
Sent By adarroug Date 2007-10-05 Time 11:15 Rev Time 0.00
Received By adarroug Date 2007-10-05 Time 11:15 Sent To E
Notes
2007-10-05 11:16:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2007-09-14 Cont ID  
Sent By adarroug Date 2007-09-14 Time 09:39 Rev Time 0.00
Received By adarroug Date 2007-09-14 Time 09:39 Sent To E
Notes
2007-09-14 09:40:13TO "DPALMER" DESK/REV--OK TO HAND-ROUTE PER ROBERT
 BROWN.

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2007-09-10 Cont ID  
Sent By adarroug Date 2007-09-10 Time 09:01 Rev Time 0.00
Received By adarroug Date 2007-09-10 Time 09:01 Sent To  
Notes
2007-10-01 09:19:14TO "COMM" BD#6
2007-09-10 09:01:45WAITING FOR "COMM" BD

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2007-09-06 Cont ID  
Sent By adarroug Date 2007-09-06 Time 14:44 Rev Time 0.00
Received By adarroug Date 2007-09-06 Time 14:44 Sent To M
Notes
2007-09-06 14:45:23TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2006-12-07 Cont ID  
Sent By adarroug Date 2006-12-07 Time 15:33 Rev Time 0.00
Received By adarroug Date 2006-12-07 Time 15:33 Sent To  
Notes
2006-12-27 09:52:29TO "COMM" BD#4/PLANS ON RACK--2 BOXES
2006-12-07 15:33:50WAITING FOR "COMM" BD

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-09-07 Cont ID  
Sent By adarroug Date 2006-09-07 Time 15:00 Rev Time 0.00
Received By adarroug Date 2006-09-07 Time 15:00 Sent To  
Notes
2006-09-15 00:00:00TO "COMM" BD#5/PLANS ON RACK/2 BOXES
2006-09-07 00:00:00WAITING FOR "COMM" BD

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-03-03 Cont ID  
Sent By amorse Date 2006-03-03 Time 12:27 Rev Time 0.00
Received By amorse Date 2005-11-28 Time 10:59 Sent To  
Notes
2005-12-06 00:00:00TO "COMM" BD#56
2005-11-28 00:00:00WAITING FOR "COMM" BD

Review Stop L LANDSCAPING
Rev No 1 Status P Date   Cont ID  
Sent By   Date 2007-12-27 Time   Rev Time 0.00
Received By rkussner Date 2007-12-27 Time 14:34 Sent To  
Notes
2007-12-27 14:36:3512/27/07- SENT TO CHRAK 12/27/07

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2007-09-14 Cont ID  
Sent By rregueir Date 2007-09-14 Time 17:51 Rev Time 0.00
Received By rregueir Date 2007-09-14 Time 17:51 Sent To PC
Notes
2007-09-14 17:51:42LETTER FOR CHANGE, GRILL AND DUCT SIZE

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2006-10-12 Cont ID  
Sent By pkrauss Date 2006-10-12 Time 12:15 Rev Time 0.00
Received By pkrauss Date 2006-10-12 Time 12:15 Sent To  
Notes
2006-10-12 12:16:50***************SHELLONLY***************
 BUILDING B:
  
 RESPONSE TO COMMENTS FROM REVIEW DATED 2-2-06:
  
 COMMENT 1:REPONSE INDICATES PER OUR CONVERSATION
 METHOD A ENERGY CALCULATIONS WILL BE SUBMITTED WITH
 SPEPARATE BUILD OUT PERMIT.PER 2004 FBC CHAPTER 13
 SUB-CHAPTER 13-101.1.1, NEW CONSTRUCTION COMEERCIAL
 BUILDINGS SHALL COMPLY WITH SUBCHAPTER 13-4.METHOD B,
 BUILDING, ENVELOPE TRADE-OFF METHOD IS REQUIRED FOR
 SHELL BUILDINGS.THE METHOD A WILL BE REQUIRED FOR THE
 BUILD-OUT PERMIT.THIS WAS ALSO A COMMENT BY THE
 BUILDING PLANS EXAMINER.
  
 PLAN SHEET M-1B
 SCOPE OF MECHANICAL WORK TO BE DONE UNDER THE SHELL
 PERMIT IS AS FOLLOWS:
 1.DUCTLESS SPLIT UNIT TO THE ELEVATOR EQUIPMENT ROOM
 2.OUTDOOR INTAKES & EXHAUST LOUVERS, EXTENDING 12"
 INTO BUILDING & CAPPED OF FUTURE.
  
 PLEASE NOTE, PVC REFRIGERANT RISER SHALL NOT BE A PASS
 THROUGH ANY FUTURE PLENUMS.
  
 COMMENT 2 & 3 WERE ADDRESSED.
  
 ***NEW COMMENT****
 ADDITIONAL MECHANICAL PERMIT REQUIRED FOR THE BUILDOUT
 PLAN SHEET M-1B INDICATES CONDENSING UNITS,PLEASE
 NOTE CLEARANCES SHALL BE NO LESS THAN MANUFACTURER'S
 RECOMMENDATIONS AND SUFFICIENT TO ALLOW INSPECTIONS,
 SERVICE REPAIR OR REPLACEMENT PER 2004 FMC 306.1.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2006-02-02 Cont ID  
Sent By pkrauss Date 2006-02-02 Time 09:24 Rev Time 0.00
Received By pkrauss Date 2006-02-02 Time 08:32 Sent To  
Notes
2006-02-02 00:00:00DENIED:BUILDING B
 1.PERMIT APPLICATION INDICATES SHELL
 ONLY.
  
 2.THE MECHANICAL PLANS INDICATE
 INSTALLATION OF THE CONDENSATE DRAIN
 LINES. THE MECHANICAL NOTE #2, WASTE &
 VENT PIPING SHALL BE PVC & DWV.FOR
 FUTURE BUILDOUT - NO COMBUSTIBLES
 ALLOWED IN THE RETURN AIR PLENUM PER
 2004 FMC 602.2.1.
  
 3.PLAN SHEET M-1 & M-2, PLANS INDICATE
 SLEEVES FOR FRESH AIR INTAKE & EXHAUST
 AIR.PLEASE PROVIDE THE DISTANCE
 BETWEEN THE TOP OF THE CONDENSING UNIT
 TO THE FRESH AIR INTAKE.THE CONDENSING
 UNIT WILL BE OMITTING HOT AIR WHICH
 SHALL NOT BE RECIRCULATED.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561)805-6719.

Review Stop P PLUMBING
Rev No 2 Status P Date 2006-09-23 Cont ID  
Sent By pschmitz Date 2006-09-23 Time 10:40 Rev Time 0.00
Received By pschmitz Date 2006-09-23 Time 10:40 Sent To  
Notes
2006-09-23 00:00:00RE-SUB

Review Stop P PLUMBING
Rev No 1 Status F Date 2006-02-25 Cont ID  
Sent By pschmitz Date 2006-02-25 Time 11:23 Rev Time 0.00
Received By pschmitz Date 2006-02-25 Time 11:23 Sent To  
Notes
2006-02-25 00:00:00PLUMBING PLAN REVIEW EXAMINER
 PAUL SCHMITZ 561-805-6692
 [email protected]
 FBC PLUMBING 2004
 FBC FUEL GAS 2004
 AMENDMENTS TO THE FLORIDA BUILDING CODE
 CH 1, ADMINISTRATION, 2004 EDITION (
 ATFBC) FBC BUILDING 2004, CH 11
 DENIED
 1)PLEASE SEE ANY POSSIBLE COMMENTS FROM
 OTHER TRADES WHICH MAY AFFECT PLUMBING
 PLANS.ENGINEERING,MECHANICAL,ZONING,
 ELECTRICAL, BUIDING.
 2) SHT M-1 REFERENCES BUILDING "A"
 PLEASE REFERENCEBUILDING "B" AS
 INDICATED ON PERMIT APPLICATION.
 3)SHT M-3 RISER S-1, SEC 903.4 EVERY
 VENT STACK SHALL CONNECT TO THE BASE OF
 THE DRAINAGE STACK.
 4)106.3.5 MINIMUM PLAN REVIEW CRITERIA
 FOR BUILDINGS. THE EXAMINATION OF THE
 DOCUMENTS BY THE BUILDING OFFICIAL SHALL
 INCLUDE THE FOLLOWING MINIMUM CRITERIA
 AND DOCUMENTS: A FLOOR PLAN; SITE PLAN;
 FOUNDATION PLAN; FLOOR/ROOF FRAMING PLAN
 OR TRUSS LAYOUT; AND ALL EXTERIOR
 ELEVATIONS:
 PROVIDE SEPERATE SHEETS FOR PLUMBING
 AND,MECHANICAL.
 5)WHEN RESUBMITTING PLANS PLEASE
 INDICATE THE REVISION & REMOVE & REPLACE
 ANY PAGES AS NECESSARY.
 A TRANSMITTAL LETTER LISTING THE
 ORIGINAL REVIEW COMMENT NUMBER, WITH A
 DESCRIPTION OF THE REVISION MADE,
 IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND
 WILL HELP TO EXPEDITE YOUR PERMIT. THANK
 YOU FOR YOUR ANTICIPATED COOPERATION.
 6) PLEASE COMPLETELY REMOVE ANY
 OLD/VOIDED SHEETS FROM SETS AND ONLY
 INSERT NEW REVISED SHEETS INTO COMPLETE
 SETS FOR REVIEW AND STAMPING.
  
 END OF COMMENTS, QUESTIONS 561-805-6692

Review Stop Z ZONING
Rev No 3 Status P Date 2007-01-07 Cont ID  
Sent By jroach Date 2007-01-07 Time 21:10 Rev Time 0.00
Received By jroach Date 2007-01-07 Time 21:10 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2006-10-02 Cont ID  
Sent By jroach Date 2006-10-02 Time 19:36 Rev Time 0.00
Received By jroach Date 2006-10-02 Time 19:36 Sent To  
Notes
2006-10-02 00:00:0010/02/06 ***FAILED***
  
 1) LOCATION OF A/C UNITS ON THE
 ELECTRICAL PLANS CONFLICTS WITH THE
 INSTALLATION OF LANDSCAPING.A/C UNITS
 SHALL BE SHOWN ON THE SITE AND LANDSCAPE
 PLANS AND SHALL BE ADJUSTED ACCORDINGLY
 TO ACCOMMODATE SUCH INSTALLATIONS.
 ADDITIONALLY, ENSURE THAT THE MECHANICAL
 EQUIPMENT DOES NOT ENCROACH MORE THAN 3
 FEET INTO A REQUIRED SETBACK.
  
 2) THE SITE PLAN INDICATES 45,000 GROSS
 SQUARE FEET OF BUILDING WHILE THE ARCH.
 PLANS INDICATE 58,998 GROSS SQUARE FEET.
 PLANS SHALL BE CONSISTENT AND THE
 PARKING, LANDSCAPING, PERVIOUS,
 IMPERVIOUS, ETC. SHALL BE ADJUSTED
 ACCORDINGLY.
  
 3) A NOTE SHALL BE PROVIDED ON THE SITE
 AND LANDSCAPE PLANS THAT THE MONUMENT
 WILL BE UNDER A SEPARATE PERMIT.
  
 QUESTIONS/COMMENTS, CONTACT JOHN ROACH,
 SENIOR PLANNER, AT (561) 822-1435.

Review Stop Z ZONING
Rev No 1 Status F Date 2006-02-16 Cont ID  
Sent By jroach Date 2006-02-16 Time 09:42 Rev Time 0.00
Received By jroach Date 2006-02-16 Time 09:42 Sent To  
Notes
2006-02-16 00:00:002/16/06 ***FAILED***
  
 1) NO SITE PLAN OR LANDSCAPE PLAN WAS
 PROVIDED.ADDITIONALLY COMMENTS MAY
 ARISE UPON SUBMISSION OF SUCH PLANS.
  
 QUESTIONS/COMMENTS, CONTACT JOHN ROACH,
 PLANNER AT (561) 822-1435.