Plan Review Details - Permit 05101074
Plan Review Stops For Permit 05101074
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2005-12-28 Cont ID  
Sent By amorse Date 2005-12-28 Time 09:08 Rev Time 0.50
Received By amorse Date 2005-12-28 Time 09:08 Sent To PC
Notes
2005-12-30 00:00:00 
  
 ?PROVISO?
  
 POOL BARRIER REQUIREMENTS PER 424.2.17 &
 R4101.17
 SHALL BE IN PLACE AT POOL FINAL
 INSPECTION PER
 R4101.19

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2005-11-15 Cont ID  
Sent By btrobaug Date 2005-11-15 Time 13:56 Rev Time 0.33
Received By btrobaug Date 2005-11-15 Time 13:55 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2006-01-13 Cont ID  
Sent By adarroug Date 2006-01-13 Time 10:29 Rev Time 0.00
Received By adarroug Date 2006-01-13 Time 10:29 Sent To P
Notes
2006-01-13 00:00:00TO "P" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-12-29 Cont ID  
Sent By mmclean Date 2006-01-13 Time 10:05 Rev Time 0.00
Received By adarroug Date 2005-12-29 Time 11:30 Sent To Z
Notes
2005-12-29 00:00:00TO "Z" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-11-15 Cont ID  
Sent By adarroug Date 2005-11-15 Time 10:59 Rev Time 0.00
Received By adarroug Date 2005-11-15 Time 10:59 Sent To E
Notes
2005-11-15 00:00:00TO "E" BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-10-22 Cont ID  
Sent By adarroug Date 2005-10-22 Time 10:39 Rev Time 0.00
Received By adarroug Date 2005-10-22 Time 10:39 Sent To Z
Notes
2005-10-22 00:00:00TO "Z" BOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2006-01-20 Cont ID  
Sent By jleech Date 2006-01-20 Time 07:14 Rev Time 0.33
Received By jleech Date 2006-01-20 Time 07:14 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2005-12-03 Cont ID  
Sent By pschmitz Date 2005-12-03 Time 13:18 Rev Time 0.00
Received By pschmitz Date 2005-12-03 Time 13:18 Sent To  
Notes
2005-12-03 00:00:00PAUL SCHMITZ
 FBC2001 FUEL GAS CODEPLAN REVIEW
 FBC 2001 PLUMBING CODEPLAN REVIEW
 DENIED
 (1) FAC 61G-15.23.002(2)
 ENGINEERS CERTIFICATE OF AUTHORIZATION
 DELIQUENT.
 (2) RPZV BACKFLOW PREVENTER SHALL BE
 INSTALLED AND INSPECTED PRIOR TO
 STARTING WORK ON POOL.
 SEPARATE PERMIT REQUIRED BY LICENSED
 PUMBING CONTRACTOR.
 (3) SEC 106.1.1 INFORMATION ON
 CONSTRUCTION DOUCMENTS, PLANS AND
 PRODUCT APPROVAL, REQUIRED.
 MANFACTURE CUT SHEETS ON POOL HEATER.
  
 (4) SEPERATE PERMIT FOR GAS PIPING.
 THE FOLLOWING INFORMATION IS REQUIRED
 FOR THE GAS PERMIT:
  
 1. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE.
  
 2. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 3. TYPE OF GAS, (LP OR NATURAL)
  
 4. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2004 FUEL GAS CODE SECS. 401.8
 THRU 402.6.1 AND TABLES 402.4(1) THRU
 402.4(33).
  
 5. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2004 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES A.3.1(4).
 .
 6. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2004 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
  
 END OF COMMENTS QUESTIONS 561-805-6692
  
  
  

Review Stop Z ZONING
Rev No 2 Status P Date 2006-01-13 Cont ID  
Sent By mmclean Date 2006-01-11 Time 14:37 Rev Time 0.00
Received By mmclean Date 2006-01-11 Time 14:37 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2005-11-14 Cont ID  
Sent By mmclean Date 2005-11-14 Time 07:40 Rev Time 0.00
Received By mmclean Date 2005-11-14 Time 07:39 Sent To I
Notes
2005-11-14 00:00:00DENIED,
 1. MUST PROVIDE TWO CURRENT COPY OF
 SURVEY WITH THE LOCATION OF THE
 POOL/DECK WITH SETBACKS. (FROM WATER'S
 EDGE TO PROPERTY LINE AND FROM DECK TO
 PROPERTY LINE.)
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved