| 2005-12-03 00:00:00 | PAUL SCHMITZ |
| | FBC2001 FUEL GAS CODEPLAN REVIEW |
| | FBC 2001 PLUMBING CODEPLAN REVIEW |
| | DENIED |
| | (1) FAC 61G-15.23.002(2) |
| | ENGINEERS CERTIFICATE OF AUTHORIZATION |
| | DELIQUENT. |
| | (2) RPZV BACKFLOW PREVENTER SHALL BE |
| | INSTALLED AND INSPECTED PRIOR TO |
| | STARTING WORK ON POOL. |
| | SEPARATE PERMIT REQUIRED BY LICENSED |
| | PUMBING CONTRACTOR. |
| | (3) SEC 106.1.1 INFORMATION ON |
| | CONSTRUCTION DOUCMENTS, PLANS AND |
| | PRODUCT APPROVAL, REQUIRED. |
| | MANFACTURE CUT SHEETS ON POOL HEATER. |
| | |
| | (4) SEPERATE PERMIT FOR GAS PIPING. |
| | THE FOLLOWING INFORMATION IS REQUIRED |
| | FOR THE GAS PERMIT: |
| | |
| | 1. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE. |
| | |
| | 2. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED. |
| | 3. TYPE OF GAS, (LP OR NATURAL) |
| | |
| | 4. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2004 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.6.1 AND TABLES 402.4(1) THRU |
| | 402.4(33). |
| | |
| | 5. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES A.3.1(4). |
| | . |
| | 6. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2004 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | |
| | END OF COMMENTS QUESTIONS 561-805-6692 |
| | |
| | |
| | |