Plan Review Details - Permit 05100938
Plan Review Stops For Permit 05100938
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2005-12-27 Cont ID  
Sent By amorse Date 2005-12-27 Time 16:41 Rev Time 0.33
Received By amorse Date 2005-12-27 Time 16:41 Sent To PC
Notes
2005-12-30 00:00:00 
  
 ?PROVISO?
  
 POOL BARRIER REQUIREMENTS PER 424.2.17 &
 R4101.17
 SHALL BE IN PLACE AT POOL FINAL
 INSPECTION PER
 R4101.19

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2006-01-23 Cont ID  
Sent By btrobaug Date 2006-01-23 Time 15:40 Rev Time 0.33
Received By btrobaug Date 2006-01-23 Time 15:12 Sent To Z
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2005-11-10 Cont ID  
Sent By btrobaug Date 2005-11-10 Time 13:34 Rev Time 0.25
Received By btrobaug Date 2005-11-10 Time 13:27 Sent To P
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2005-12-09 Cont ID  
Sent By jleech Date 2005-12-09 Time 14:13 Rev Time 0.00
Received By jleech Date 2005-12-09 Time 14:13 Sent To P
Notes
2005-12-09 00:00:00HEAT PUMP USED FOR POOL HEATER NO GAS
 PIPE REQUIRED.

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2006-01-24 Cont ID  
Sent By adarroug Date 2006-01-24 Time 08:58 Rev Time 0.00
Received By adarroug Date 2006-01-24 Time 08:58 Sent To B
Notes
2006-01-24 00:00:00TO "AMORSE" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2006-01-09 Cont ID  
Sent By adarroug Date 2006-01-09 Time 15:38 Rev Time 0.00
Received By adarroug Date 2006-01-09 Time 15:38 Sent To P
Notes
2006-01-09 00:00:00TO "JLEECH" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-11-09 Cont ID  
Sent By adarroug Date 2005-11-09 Time 14:02 Rev Time 0.00
Received By adarroug Date 2005-11-09 Time 14:02 Sent To E
Notes
2005-11-09 00:00:00TO "E" BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-10-19 Cont ID  
Sent By adarroug Date 2005-10-19 Time 10:57 Rev Time 0.00
Received By adarroug Date 2005-10-19 Time 10:57 Sent To Z
Notes
2005-10-19 00:00:00TO "Z" BOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2006-01-26 Cont ID  
Sent By mperson Date 2006-01-26 Time 09:14 Rev Time 1.25
Received By mperson Date 2006-01-26 Time 09:14 Sent To PC
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2005-12-09 Cont ID  
Sent By jleech Date 2005-12-09 Time 14:14 Rev Time 0.33
Received By jleech Date 2005-12-09 Time 14:14 Sent To B
Notes
2005-12-09 00:00:00DENIED;
 1) FBC-2004 SEC 424.2.6.1 ENGINEERING
 DESIGN, CONSTRUCTION AND WORKMANSHIP.
 ANSI/NSPI-5. (ADD TO NOTES)
 2) FBC-2004 424.2.7.2 PUMPS AND
 EQUIPMENT SHALL BE MOUNTED ON A
 SUBSTANTIAL BASE IN A MANNER THAT WILL
 ELIMINATE STRAIN ON PIPING.SLAB SHALL
 BE A NOMINAL 4" THICK. (DETAIL)
 3) FBC-2004 424.2.12.1 PRESSURE TESTS.
 PER MANUFACTURE RECOMMENDATIONS, NO AIR
 TEST SHALL BE APPROVED FOR PVC PIPE AND
 FITTINGS. (ADD TO NOTES)
 4)424.2.9 WATER SUPPLY, LOCAL ORD.
 #2853-95, BACKFLOW REQUIRED ON WATER
 SERVICE.
 5) 424.2.14.1 JOINTS AND CONECTIONS, FBC
 PLUMBING SEC. 605.21, PURPLE PRIMER
 REQUIRED ON PVV PIPING. (ADD TO NOTES.)
 PLUMBING PLAN REVIEW BY;
 JOHN LEECH
 805-6695

Review Stop Z ZONING
Rev No 2 Status P Date 2006-01-23 Cont ID  
Sent By mmclean Date 2006-01-23 Time 15:52 Rev Time 0.00
Received By mmclean Date 2006-01-23 Time 15:52 Sent To I
Notes
2006-01-23 00:00:00APPROVED REVISION (NEW SHEETS).

Review Stop Z ZONING
Rev No 1 Status P Date 2005-11-07 Cont ID  
Sent By mmclean Date 2005-11-07 Time 14:59 Rev Time 0.00
Received By mmclean Date 2005-11-07 Time 14:59 Sent To I
Notes
***NONE***