| Plan Review Stops For Permit 05091697 |
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2005-10-18 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2005-10-18 |
Time |
14:13 |
Rev Time |
0.50 |
| Received By |
jleech |
Date |
2005-10-18 |
Time |
14:13 |
Sent To |
|
|
| Notes |
| 2005-10-18 00:00:00 | DENIED; | | | 1. SUBMIT AN ISOMETRIC DRAWING THAT | | | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE | | | AND CORRESPONDING LENGTHS PER FBC-2001 | | | FUEL GAS CODE. | | | 2. TYPE OF GAS, (LP OR NATURAL) | | | | | | 3. BTU LOAD OF EACH APPLIANCE AND THE | | | TOTAL BTU LOAD ON THE SYSTEM. REFER TO | | | THE FBC-2001 FUEL GAS CODE SECS. 401.8 | | | THRU 402.5.2 AND TABLES 402(1) THRU | | | 402(34). | | | 4. SHOW THE DISTANCE FROM THE POINT OF | | | DELIVERY, (METER), TO THE MOST REMOTE | | | OUTLET IN THE BUILDING AND/OR SYSTEM PER | | | FBC-2001 FUEL GAS CODE APPENDIX A - USE | | | OF CAPACITY TABLES (A)(3). | | | 5. INDICATE THE DELIVERY PRESSURE (PSI) | | | PER FBC-2001 FUEL GAS CODE SEC. 402.2. | | | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. | | | 6.HOW IS PIPE TO BE INSTALLED, UNDER | | | GROUND, OR STAPED TO DECK. | | | GAS PLAN REVIEW BY; | | | JOHN LEECH | | | 805-6695 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2005-10-03 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-10-03 |
Time |
08:28 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-10-03 |
Time |
08:28 |
Sent To |
G |
|
| Notes |
| 2005-10-03 00:00:00 | TO "G" BOX |
|
|
|