Plan Review Details - Permit 05091692
Plan Review Stops For Permit 05091692
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2005-12-23 Cont ID  
Sent By amorse Date 2005-12-23 Time 09:03 Rev Time 0.50
Received By amorse Date 2005-12-23 Time 09:03 Sent To PC
Notes
2005-12-23 00:00:00 
  
 PROVISO
  
  
 POOL BARRIER REQUIREMENTS PER 424.2.17
 SHALL BE INSTALLED FOR FINAL INSPECTION

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2006-01-26 Cont ID  
Sent By btrobaug Date 2006-01-26 Time 07:28 Rev Time 0.50
Received By btrobaug Date 2006-01-26 Time 06:58 Sent To B
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2005-11-08 Cont ID  
Sent By btrobaug Date 2005-11-08 Time 06:27 Rev Time 0.33
Received By btrobaug Date 2005-11-08 Time 06:02 Sent To P
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2005-11-22 Cont ID  
Sent By jleech Date 2005-11-22 Time 18:29 Rev Time  
Received By jleech Date   Time   Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2006-01-05 Cont ID  
Sent By adarroug Date 2006-01-05 Time 08:24 Rev Time 0.00
Received By adarroug Date 2006-01-05 Time 08:24 Sent To P
Notes
2006-01-05 00:00:00TO "P" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-10-21 Cont ID  
Sent By adarroug Date 2005-10-21 Time 13:48 Rev Time 0.00
Received By adarroug Date 2005-10-21 Time 13:48 Sent To E
Notes
2005-10-21 00:00:00TO "E" BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-10-03 Cont ID  
Sent By adarroug Date 2005-10-03 Time 09:24 Rev Time 0.00
Received By adarroug Date 2005-10-03 Time 09:24 Sent To Z
Notes
2005-10-03 00:00:00TO "Z" BOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2006-01-25 Cont ID  
Sent By jleech Date 2006-01-25 Time 08:35 Rev Time 0.50
Received By jleech Date 2006-01-25 Time 08:35 Sent To E
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2005-11-22 Cont ID  
Sent By jleech Date 2005-11-22 Time 18:29 Rev Time 1.00
Received By jleech Date 2005-11-22 Time 18:29 Sent To B
Notes
2005-11-23 00:00:006) FBC-2001 SEC 424.2.6.6 ENTRAPMENT
 PROTECTION FOR SUCTION INLETS. (DETAIL)
 7)FBC-2001 424.2.9 WATER SUPPLY, LOCAL
 ORD. #2853-95, BACKFLOW REQUIRED ON
 WATER SERVICE (ADD TO NOTES)
 8)FBC-2001 424.2.13.2 JOINTS AND
 CONNECTIONS, FBC PLUMBING SEC. 605.21,
 PURPLE PRIMER REQUIRED ON PVC PIPING.
 PLUMBING PLAN REVIEW BY;
 JOHN LEECH
 805-6695
2005-11-22 00:00:001) FBC-2001 SEC 424.2.6.1 ENGINEERING
 DESIGN, CONSTRUCTION AND WORKMANSHIP.
 ANSI/NSPI-5. (ADD TO NOTES)
 DENIED;
 2) FBC-2001 424.2.7.2 PUMPS AND
 EQUIPMENT SHALL BE MOUNTED ON A
 SUBSTANTIAL BASE IN A MANNER THAT WILL
 ELIMINATE STRAIN ON PIPING.SLAB SHALL
 BE A NOMINAL 4" THICK. (DETAIL)
 3) FBC-2001 424.2.8.1 VALVES SHALL BE
 MADE OF MATERIALS THAT ARE APPROVED IN
 THE FLA BLDG CODE, PLUMBING.THEY WILL
 BE READILY ACCESSIBLE FOR MAINT. AND
 REMOVAL.SEC 424.2.8.2 FULL WAY VALVES
 SHALL BE INSTALLED TO INSURE PROPER
 FUNCTION OF THE FILTRATION AND PIPING
 SYSTEMS.SEC 424.2.8.3 WHERE CHECK
 VALVES ARE INSTALLED THEY SHALL BE OF
 THE SWING OR VERTICAL CHECK PATTERNS.
 SEC 424.2.8.4 COMBINATION VALVES SHALL
 REQUIRE APPROVAL OF THE ADMINISTRATIVE
 AUTHORITY PRIOR TO THEIR INSTALLATION.
 4) FBC-2001424.2.6.6.5 WHERE PROVIDED,
 THE VACUUM OR PRESSURE CLEANER FITTING
 SHALL BE LOCATED AT LEAST 6" AND NOT
 GREATER THAN 12" BELOW THE MINIMUM OPER-
 ATING WATER LEVEL OR AS AN ATTACHMENT TO
 THE SKIMMER.
 5) FBC-2001 424.2.12.1 PRESSURE TESTS.
 PER MANUFACTURE RECOMMENDATIONS, NO AIR
 TEST SHALL BE APPROVED FOR PVC PIPE AND
 FITTINGS. (ADD TO NOTES)
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2005-10-18 Cont ID  
Sent By mmclean Date 2005-10-18 Time 11:07 Rev Time 0.00
Received By mmclean Date 2005-10-18 Time 11:07 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved