| Plan Review Stops For Permit 05091091 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2005-12-05 |
|
|
Cont ID |
|
| Sent By |
alange |
Date |
2005-12-05 |
Time |
09:01 |
Rev Time |
0.50 |
| Received By |
alange |
Date |
2005-12-05 |
Time |
08:55 |
Sent To |
|
|
| Notes |
| 2005-12-05 00:00:00 | DENIED | | | | | | 1.SUBMIT A PLANS SHOWING FASTENING | | | METHOD OF GENERATOR TO SLAB. | | | | | | NOTE: SEE ELECTRICAL COMMENTS REGARDING | | | SIGNING PAGES. | | | | | | ANY QUESTIONS CALL ME | | | | | | ART LANGE | | | BUILDING PLANS EXAMINER | | | 805-6672 |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2005-10-04 |
|
|
Cont ID |
|
| Sent By |
alange |
Date |
2005-10-04 |
Time |
14:32 |
Rev Time |
0.50 |
| Received By |
alange |
Date |
2005-10-04 |
Time |
14:32 |
Sent To |
|
|
| Notes |
| 2005-10-04 00:00:00 | DENIED | | | | | | 1.SUBMIT A PLANS SHOWING SLAB DETAIL | | | AND FASTENING METHOD OF GENERATOR TO | | | SLAB. | | | | | | ANY QUESTIONS CALL ME | | | | | | ART LANGE | | | BUILDING PLANS EXAMINER | | | 805-6672 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2005-12-01 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2005-12-01 |
Time |
07:17 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2005-12-01 |
Time |
06:50 |
Sent To |
P |
|
| Notes |
| 2005-12-01 00:00:00 | | | | | | | PLEASE MAKE THE FOLLOWING CORRECTIONS | | | FOR CODE COMPLIANCE AND RESUBMIT FOR | | | REVIEW | | | | | | 1} PLEASE GIVE LOAD CALCS FOR THE BRANCH | | | CIRCUITS BEING SERVED BY THE GENERATOR. | | | | | | 2} SUBMIT A SITE PLAN SHOWING THE | | | LOCATION OF THE SERVICE EQUIPMENT AND | | | THE PROPOSED LOCATION OF THE GENERATOR | | | AND RELATED EQUIPMENT SO THAT COMPLIANCE | | | FOR 225.31 THROUGH 225.37 INCLUSIVE MAY | | | BE REVIEWED. | | | | | | 3} THE PERSON TAKING RESPONSIBILITY FOR | | | THE PLAN MUST PRINT AND SIGN THEIR NAME | | | TO SAME PER 104.2.1 FBC. | | | | | | IF THERE ARE ANY QUESTIONS PLEASE CALL | | | OR WE COULD SET UP A MEETING TO CLARIFY | | | THESE ISSUES. YOU MUST ALSO INDICATE THE | | | TYPE OF FUEL AS THE PRIME MOVER AS IT | | | HAS A BEARING ON THE GENERATOR OUTPUT. | | | | | | THERE MAY BE OTHER COMMENTS WHEN THESE | | | ITEMS ARE SUBMITTED.BE AWARE THAT ALL | | | DISCONNECTS MUST BE SERVICE RATED PER | | | 225.36. | | | | | | BILL TROBAUGH | | | ELECTRICAL PLAN REVIEW | | | 561/805-6718 | | | [email protected] | | | FAX/:561/659-8026 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2005-09-30 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2005-09-30 |
Time |
15:15 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2005-09-30 |
Time |
14:59 |
Sent To |
M |
|
| Notes |
| 2005-09-30 00:00:00 | | | | PLEASE MAKE THE FOLLOWING CORRECTIONS | | | FOR CODE COMPLIANCE AND RESUBMIT FOR | | | REVIEW | | | | | | 1} TWO COPIIES OF THE MANUFACTURERS | | | SPECIFICATIONS FOR THE GENERATOR AND | | | TRANSFER SWITCH. | | | | | | 2} SUBMIT A SITE PLAN SHOWING THE | | | LOCATION OF THE SERVICE EQUIPMENT AND | | | THE PROPOSED LOCATION OF THE GENERATOR | | | AND RELATED EQUIPMENT SO THAT COMPLIANCE | | | FOR 225.31 THROUGH 225.37 INCLUSIVE MAY | | | BE REVIEWED. | | | | | | 3} THE PERSON TAKING RESPONSIBILITY FOR | | | THE PLAN MUST PRINT AND SIGN THEIR NAME | | | TO SAME PER 104.2.1 FBC. | | | | | | 4} THE VALUE ON THE PERMIT APPLICATION | | | MUST REFLECT THE COST OF ALL LABOR AND | | | MATERIAL (EQUIPMENT) FOR THIS PROJECT | | | UNDER THE GEN RES PERMIT TYPE. SEE | | | 104.6.5.CWPB AMMENDMENTS. | | | | | | THERE MAY BE OTHER COMMENTS WHEN THESE | | | ITEMS ARE SUBMITTED.BE AWARE THAT ALL | | | DISCONNECTS MUST BE SERVICE RATED PER | | | 225.36. | | | | | | BILL TROBAUGH | | | ELECTRICAL PLAN REVIEW | | | 561/805-6718 | | | [email protected] | | | FAX/:561/659-8026 |
|
|
| Review Stop |
FUEL |
DIESEL GENERATOR |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
N |
Date |
2005-12-05 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2005-12-05 |
Time |
08:42 |
Rev Time |
0.25 |
| Received By |
jleech |
Date |
2005-12-05 |
Time |
08:42 |
Sent To |
B |
|
| Notes |
| 2005-12-05 00:00:00 | GAS PERMIT REQUIRED. GAS CONTRACTOR | | | REQUIRED TO SUBMIT PLANS WITH | | | APPLICATION. FINAL GAS INSPECTION TO BE | | | DONE BEFORE FINAL INSPECTION ON | | | GENERATOR. | | | GAS REVIEW BY | | | JOHN LEECH | | | 805-6695 |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2005-10-04 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2005-10-04 |
Time |
07:36 |
Rev Time |
0.25 |
| Received By |
jleech |
Date |
2005-10-04 |
Time |
07:36 |
Sent To |
B |
|
| Notes |
| 2005-10-04 00:00:00 | DENIED; | | | FUEL TYPE NOT LISTED. PERMIT REQUIRED | | | FOR FUEL. APPLICATION BY LICENSED | | | CONTRACTOR PLANS REQUIRED. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2005-11-29 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-11-29 |
Time |
08:07 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-11-29 |
Time |
08:07 |
Sent To |
E |
|
| Notes |
| 2005-11-29 00:00:00 | TO "BTROBAUG" DESK/RESUB |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2005-11-23 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-11-23 |
Time |
14:16 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-11-23 |
Time |
14:16 |
Sent To |
Z |
|
| Notes |
| 2005-11-23 00:00:00 | TO "Z" BOX/RESUB |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2005-09-30 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-09-30 |
Time |
08:18 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-09-30 |
Time |
08:18 |
Sent To |
E |
|
| Notes |
| 2005-09-30 00:00:00 | TO "GEN-RES" BOX "E" |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2005-12-05 |
|
|
Cont ID |
|
| Sent By |
alange |
Date |
2005-12-05 |
Time |
08:56 |
Rev Time |
0.00 |
| Received By |
alange |
Date |
2005-09-23 |
Time |
13:30 |
Sent To |
|
|
| Notes |
| 2005-09-23 00:00:00 | TO "Z" BOX |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
N |
Date |
2005-09-30 |
|
|
Cont ID |
|
| Sent By |
tgordon |
Date |
2005-09-30 |
Time |
15:59 |
Rev Time |
0.15 |
| Received By |
tgordon |
Date |
2005-09-30 |
Time |
15:59 |
Sent To |
P |
|
| Notes |
| 2005-09-30 00:00:00 | *** PROVISO *** | | | 1) GENERATOR EXHUST MUST BE TEN FEET | | | AWAY FROM ANY BUILDING OPENINGS | | | (WINDOWS, DOORS, ROOF & EAVE VENTS), AND | | | TEN FEET AWAY FROM ADJECENT BUILDING | | | OPENINGS. PER 2001 FBC/M 804.3.3 . | | | 2) MANUFACTURE'S INSTALLATION | | | INSTRUCTIONS MUST BE SUBMITTED WITH | | | PERMIT APPLICATION SHOWING MODEL AND GAS | | | TYPE BEING INSTALLED. | | | IF YOU HAVE ANY QUESTIONS PLEASE CALL | | | TOM GORDON 805-6729 OR PATTY KRAUSS | | | 805-6719. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2005-10-04 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2005-10-04 |
Time |
07:35 |
Rev Time |
|
| Received By |
jleech |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2005-11-29 |
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2005-11-29 |
Time |
07:08 |
Rev Time |
0.00 |
| Received By |
sgraham |
Date |
2005-11-29 |
Time |
07:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2005-09-29 |
|
|
Cont ID |
|
| Sent By |
mmclean |
Date |
2005-09-29 |
Time |
16:54 |
Rev Time |
0.00 |
| Received By |
mmclean |
Date |
2005-09-29 |
Time |
16:54 |
Sent To |
I |
|
| Notes |
| 2005-09-29 00:00:00 | DENIED, | | | 1. MUST PROVIDE TWO COPY OF CURRENT | | | SURVEY SHOWING THE LOCATION OF THE | | | GENERATOR AND SETBACKS. (DISTANCE FROM | | | THE STRUCTURE & PROPERTY LINE). | | | | | | | | | MICHELLE MCLEAN | | | ZONING TECHNICIAN | | | 805-6720 |
|
|