| 2005-09-08 00:00:00 | DENIED; |
| | 1. FBC-2001 SEC 424.2.6.1 ENGINEERING |
| | DESIGN, CONSTRUCTION AND WORKMANSHIP. |
| | ANSI/NSPI-5. (ADD TO NOTES) |
| | 2. FBC-2001424.2.6.6.2 SHOW COMPLIANCE |
| | WITH ANSI/ASME A112.19.8M. PROVIDE MODEL |
| | NUMBER AND MANUF INFO FOR VAC LOCK. |
| | (GIVE DETAIL, SUBMITTAL OR ADD TO NOTES) |
| | 3.) FBC-2001424.2.6.6.5 WHERE |
| | PROVIDED, THE VACUUM OR PRESSURE CLEANER |
| | FITTING SHALL BE LOCATED AT LEAST 6" AND |
| | NOT GREATER THAN 12" BELOW THE MINIMUM |
| | OPER- ATING WATER LEVEL OR AS AN |
| | ATTACHMENT TO THE SKIMMER. |
| | 4. FBC-2001 424.2.8.1 VALVES SHALL BE |
| | MADE OF MATERIALS THAT ARE APPROVED IN |
| | THE FLA BLDG CODE, PLUMBING.THEY WILL |
| | BE READILY ACCESSIBLE FOR MAINT. AND |
| | REMOVAL.SEC 424.2.8.2 FULL WAY VALVES |
| | SHALL BE INSTALLED TO INSURE PROPER |
| | FUNCTION OF THE FILTRATION AND PIPING |
| | SYSTEMS.SEC 424.2.8.3 WHERE CHECK |
| | VALVES ARE INSTALLED THEY SHALL BE OF |
| | THE SWING OR VERTICAL CHECK PATTERNS. |
| | SEC 424.2.8.4 COMBINATION VALVES SHALL |
| | REQUIRE APPROVAL OF THE ADMINISTRATIVE |
| | AUTHORITY PRIOR TO THEIR INSTALLATION. |
| | 5. FBC-2001 424.2.12.1 PRESSURE TESTS. |
| | PER MANUFACTURE RECOMMENDATIONS, NO AIR |
| | TEST SHALL BE APPROVED FOR PVC PIPE AND |
| | FITTINGS. (ADD TO NOTES) |
| | 6)424.2.9 WATER SUPPLY, LOCAL ORD |
| | #2853-95, BACKFLOW REQUIRED ON WATER |
| | SERVICE. (ADD TO NOTES) |
| | 7)424.2.13.2 JOINTS AND CONNECTIONS, FBC |
| | PLUMBING SEC 605.21, PERPLE PRIMER |
| | REQUIRED ON PVC PIPING. (ADD TO NOTES) |
| | 8)424.2.14.2 WATER RETENTION, PROVIDE A |
| | POSITIVE MEANS OF RETAINING WATER IN |
| | HEATER WHEN PUMP IS SHUT OFF. ( ADD TO |
| | NOTES) |
| | PLUMBING PLAN REVEW BY; |
| | JOHN LEECH |
| | 805-6695 |