Plan Review Details - Permit 05071276
Plan Review Stops For Permit 05071276
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2005-07-29 Cont ID  
Sent By jhiggins Date 2005-07-29 Time 10:04 Rev Time 0.00
Received By jwitmer Date 2005-08-17 Time 13:10 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2005-08-17 Cont ID  
Sent By jwitmer Date 2005-08-17 Time 13:11 Rev Time 0.33
Received By jwitmer Date 2005-08-17 Time 13:11 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2005-08-23 Cont ID  
Sent By dpalmer Date 2005-08-23 Time 07:30 Rev Time 0.75
Received By dpalmer Date 2005-08-23 Time 07:30 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2005-08-16 Cont ID  
Sent By dpalmer Date 2005-08-16 Time 09:00 Rev Time 1.00
Received By dpalmer Date 2005-08-16 Time 09:00 Sent To B
Notes
2005-08-16 00:00:00*** UNSAT ***
  
 1)NOTE: PLEASE SEE NEW RISER DIAGRAM
 SUBMITTED.
 PLEASE SEE MISSING GROUNDING ELECTRODE
 SYSTEM. PLEASE SEE 250.50,250.66,250.24
 ETC.
 PLEASE SEE A MIN OF TWO GROUND RODS WILL
 BE REQUIRED.
 PLEASE SEE MAIN SHOWN AT FPL STRUCTURE
 AND THEN OVER TO A METER AND THEN NEW
 MPC.
 PLEASE CLARIFY MAIN DISCONNECTLOCATED ON
 THE "LINE SIDE" OF THE FPL METERING
 DEVICE?
 PLEASE SEE MISSING EQUIPMENT GROUNDING
 CONDUCOTR AFTER THE FIRST MEANS OF
 DISCONNECT. 250.122,250.110,250.24
  
 2)NOTE: PLEASE SEE RISER INDICATES NO
 MORE THAN 10' FOR A "TAP"?
 PLEASE SEE INSTALLATION AS SHOWN WILL
 EXCEED 10'.
 PLEASE ALSO SEE ANY TAPS MUST TERMINATE
 IN OCP. THIS CAN NOT GO TO A METER.
 240.21,240.4,310.16 ETC
  
 3)NOTE: PLEASE SEE MPC MUST ALSO
 INDICATE THE MCB AS NOTED ON RISER.
 PLEASE SUBMIT THE MANUFACTURE/SPEC CUT
 SHEETS FOR THIS MPC PANEL.
 PLEASE BE SURE LISITNG PER A NRTL.
  
 4)NOTE: PLEASE SEE ONLY ONE COPY OF
 PLANS WERE SUBMITTED. PLEASE SUBMIT TWO
 SIGNED, DATED AND SEALED COPIES.
 PLEASE ALSO SEE PLANS MUST BE "SIGNED"
 BY THE ENGINEEROF RECORD WITH SIGNATURE
 AS IS ON FILE.
 FS 471.025
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]
  
  
  
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2005-08-01 Cont ID  
Sent By dpalmer Date 2005-08-01 Time 17:04 Rev Time 1.00
Received By dpalmer Date 2005-08-01 Time 17:04 Sent To B
Notes
2005-08-01 00:00:00******** UNSAT **********
  
 1)NOTE: PLEASE SEE SEE PLANS MENTIONS A
 NEW TRANSFORMER, HOWEVER THIS COULD NOT
 BE LCOATED ON ELECTRICAL RISER DIAGRAM?
 215.5
 PLEASE REVISE DIAGRM TO INCLUDE ALL
 WIRING.
  
 2)NOTE: PLEASE SEE NEW"MPC", THIS DOES
 NOT PROVIDE ENOUGH INFORMATION. DOES
 THIS HAVE A MAIN? ETC ETC.
 215.5,240.4,310.16
  
 3)NOTE: PLEASE SEE "EQUIPMENT GROUNDING"
 CONDUCTORS ARE BEING SHOWN FROM METER TO
 "MAINS"/ FIRST MEANS OF DICSONNECT.
 PLEASE SEE 250.6,250.24, "EQUIPMENT
 GROUNDING" CONDUCTORS ARE ONLY INSTALLED
 AFTER THE FIRST MEANS OF DISC.
  
 4)NOTE: PLEASE SEE FS 471.003, WHICH
 REQUIRED ALL PLANS FOR NEW 277/480V
 SYSTEMS, TRANSFORMER ETC, TO BE SIGNED
 DATED AND SEALED BY A FLORIDA REGISTERED
 PE. PLEASE BE SURE PLANS HAVE ALL
 CORRECT TITLE BLOCK INFORMATION AS
 REQUIRED UNDER FAC 61G15-23.002 FOR
 ENGINEER/ENGINEERING FIRM OF RECORD.
  
 5)NOTE: PLEASE INCDICATE A PANEL
 SCHEDULE WITH SIZE OF OCP, AWG FOR EACH
 BRACH CIRCUIT.
 PLEASE SHOW CONDUIT, CONDUCTORS SIZES,
 CIRCUITS ON PLANS.
 215.5,240.4,310.16 ETC
  
 6)NOTE: PLEASE SEE 240.21,408.16 WHICH
 REQUIRES A MCB ON THE LOAD SIDE OF THE
 TRANSFORMER.
  
 7)NOTE: PLEASE SEE A MIN OF TWO GRNDS
 RODS ARE REQUIRED. 250.50
  
 8)NOTE: PLEASE SEE BLDG REVIEW NOTES,
 "ALL ELECTRICALSERVICE EQUIPMENT SHALL
 BE INSTALLED A MIN OF 6" ABOVE BASED
 FLOOD ELEVATION. THIS SHOULD BE NOTED ON
 PLANS.
  
 PLEASE SEE ANY POSSIBLE COMMENTS FROM
 OTHER TRADES WHICH MAY AFFECT ELECTRICLA
 PLANS.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-08-22 Cont ID  
Sent By adarroug Date 2005-08-22 Time 15:25 Rev Time 0.00
Received By adarroug Date 2005-08-22 Time 15:25 Sent To E
Notes
2005-08-22 00:00:00TO "DPALMER" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-08-01 Cont ID  
Sent By adarroug Date 2005-08-01 Time 10:01 Rev Time 0.00
Received By adarroug Date 2005-08-01 Time 10:01 Sent To E
Notes
2005-08-01 00:00:00TO "E" BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-07-28 Cont ID  
Sent By adarroug Date 2005-07-28 Time 11:13 Rev Time 0.00
Received By adarroug Date 2005-07-28 Time 11:13 Sent To Z
Notes
2005-07-28 00:00:00TO "Z" BOX
 "JWITMER TO BE THE LAST REVIEWER"

Review Stop P PLUMBING
Rev No 2 Status P Date 2005-08-17 Cont ID  
Sent By pschmitz Date 2005-08-17 Time 09:45 Rev Time 0.00
Received By pschmitz Date 2005-08-17 Time 09:45 Sent To B
Notes
2005-08-17 00:00:00BACK FLOW PREVENTER ONLY
 ALL OTHER WORK UNDER STATE PERMIT

Review Stop P PLUMBING
Rev No 1 Status F Date 2005-08-02 Cont ID  
Sent By kstevens Date 2005-08-02 Time 13:03 Rev Time 0.50
Received By kstevens Date 2005-08-02 Time 13:03 Sent To B
Notes
2005-08-02 00:00:00DENIED
 REFERENCE: FBC-2001 CHAPTER 1
  
  
 1. APPLICATION CALLS FOR THE
 INSTALLATION OF A WATER FOUNTAIN AND
 WATERLINE. - THIS APPLICATION SHOULD BE
 FOR THE BACKFLOW AND INSTALLATION OF
 SAME. ALL OTHER WORK SHALL BE ON STATE
 PROPERTY AND SHALL BE PERMITTED BY THE
 STATE. SECTIONS 101.4.7 & 104.1.1.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop Z ZONING
Rev No 1 Status P Date 2005-07-29 Cont ID  
Sent By jlong Date 2005-07-29 Time 08:19 Rev Time 0.00
Received By jlong Date 2005-07-29 Time 08:19 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved