| 2005-08-23 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | FBC-2001 CHAPTER 1 |
| | FBC-2001 CHAPTER 11 |
| | |
| | 1. SHT 1.0A EQUIPMENT SCHEDULE ITEM #5 |
| | DOES NOT SHOW WATER SUPPLY OR DRAINAGE. |
| | PLEASE CLARIFY. SECTION 104.2.1. |
| | 2. SHT 1.0A EQUIPMENT PLAN INDICATES |
| | EXISTING GREASE INTECEPTOR. THIS IS A |
| | NEW RESTURANT AND AS INDICATED BY |
| | ENVIRONMENTAL COMPLIANCE THERE IS NO |
| | GREASE INTECEPTOR AND THE REQUIREMENT |
| | HAS BEEN WAIVED. PLEASE CLARIFY. SECTION |
| | 104.2.1. |
| | 3. SHT 1.0A INDICATE THE FOLLOWING |
| | ACCESSIBLITY REQUIREMENTS ON THE |
| | DETAILS: |
| | A. 11-4.16.5 FLUSH CONTROLS |
| | B. 11-4.18.4 FLUSH CONTROLS |
| | C. 11-4.19.5 FAUCETS |
| | 4. SHT 3.0P WATER RISER DIAGRAM WATER |
| | HAMMER ARRESTORS SHALL BE LOCATED NEAR |
| | THE FIXTURE IN AN "EFFECTIVE RANGE" NOT |
| | IN THE CEILING AS SHOWN. PDI-WH 201. - |
| | PLUMBING NOTES: |
| | #8 1/4"/FT FOR 2-1/2" AND SMALLER PIPE |
| | PER TABLE 704.1. |
| | #11 "L" OR "K" COPPER REQUIRED |
| | UNDERGROUND. "M" COPPER NOT MANUF. IN |
| | ROLL COPPER AND JOINTS FOR COPPER NOT |
| | APPROVE UNDER THE SLAB. |
| | #12 AIR CHAMBERS NOT APPROVED. DELETE |
| | FROM REFERENCE. SECTION 604.9 |
| | 5. THE FOLLOWING INFORMATION IS REQUIRED |
| | FOR THE GAS PERMIT: |
| | A. TYPE OF GAS, (LP OR NATURAL) |
| | B. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2001 FUEL GAS CODE SEC 402.2 |
| | C. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | D. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND |
| | APPURTENANCES PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 3-2.2.7(H). |
| | E. EMERGENCY HOOD SHUT DOWN SHUT OFF |
| | VALVE TO BE BELOW CEILING. MANUAL SHUT |
| | OFF VALVE TO BE UPSTREAM. UNION TO BE |
| | DOWN STREAM OF MANUAL VALVE. |
| | F. GAS RISER DIAGRAM INDICATES 2PSI |
| | PRESSURE FROM THE METER. INDICATE |
| | LOCATION OF 2LB TO 1/2LB REGULATOR IN |
| | GAS SYSTEM AND SUBMIT MANUF. |
| | SPECIFICATION SHEETS FOR REGULATOR. |
| | 6. SHT 1.0A WITH DBPR STAMPS SHALL BE |
| | SIGNED, SEALED AND DATED PER SECTION |
| | 104.2.2. - TWO PAGE "WORKSHEETS" SHALL |
| | BE ATTACHED TO EACH SET OF PLANS BEING |
| | SUBMITTED FOR REVIEW. SECTION 101.4.7. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |