Plan Review Details - Permit 05061270
Plan Review Stops For Permit 05061270
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2005-08-23 Cont ID  
Sent By jwitmer Date 2005-08-23 Time 07:00 Rev Time 0.55
Received By jwitmer Date 2005-08-22 Time 14:04 Sent To P
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2005-07-24 Cont ID  
Sent By jwitmer Date 2005-07-24 Time 13:54 Rev Time 0.55
Received By jwitmer Date 2005-07-24 Time 13:44 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2005-08-10 Cont ID  
Sent By dpalmer Date 2005-08-10 Time 06:36 Rev Time 0.25
Received By dpalmer Date 2005-08-10 Time 06:25 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2005-07-01 Cont ID  
Sent By dpalmer Date 2005-07-01 Time 16:59 Rev Time 1.00
Received By dpalmer Date 2005-07-01 Time 16:59 Sent To  
Notes
2005-07-01 00:00:00****** UNSAT ******
  
 1)NOTE: PLEASE CLARIFY / SHOW LOAD ON
 EXSITING SERVICE. IF 200A SERVICE IS
 PROVIDED, AND NO INCREASE IN LOAD,
 PLEASE SPECIFY.
 NOTE ON PLANS MENTISON "IF" IT IS
 ASSUMED??
 215.5,220
  
 2)NOTE: PLEASE SEE 2002 NEC 210.8B3
 WHICH REQUIRES ALL 15- AND 20-AMPERE,
 125-VOLT RECEPTACLES IN NONDWELLING-TYPE
 KITCHENS TO BE GFCI PROTECTED. THIS
 REQUIREMENT APPLIES TO EACH AND EVERY
 15- AND 20-AMPERE, 125-VOLT KITCHEN
 RECEPTACLE, WHETHER OR NOT THE
 RECEPTACLE SERVES COUNTERTOP APPLIANCES.
  
  
 3)NOTE: PLEASE CLARIFY NEW OR EXSITNG
 ROOF-TOP GFI RECEPT. 210.63,210.8
  
 PLEASE REMOVE ALL OLD/VOIDED SHEETS AND
 ONLY INSERT NEW REVISED SHEETS INTO
 COMPLETE SETS FOR REVIEW AND STAMPING.
 PLEASE SUBMIT ONE SET OF OLD SHEETS FOR
 REFERENCE ONLY.
  
 PLEASE SEE ANY POSSIBLE COMMENTS FROM
 OTHER REVIEWER(S) WHICH MAY AFFECT
 ELECTRICAL PLANS.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2005-07-12 Cont ID  
Sent By mwennerg Date 2005-07-12 Time 14:25 Rev Time 0.00
Received By mwennerg Date 2005-07-12 Time 14:25 Sent To  
Notes
2005-07-12 00:00:00******PASSED******
  
 IN ADDITION TO THE FIRE SPRINKLER AND
 FIRE ALARM REMODEL, SEPARATE SHOP
 DRAWINGS AND PERMITS ARE REQUIRED FOR
 THE HOOD AND SUPPRESSION SYSTEMS.

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2005-12-23 Cont ID  
Sent By adarroug Date 2005-12-23 Time 11:31 Rev Time 0.00
Received By adarroug Date 2005-12-23 Time 11:31 Sent To M
Notes
2005-12-23 00:00:00TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-09-22 Cont ID  
Sent By adarroug Date 2005-09-22 Time 09:12 Rev Time 0.00
Received By adarroug Date 2005-09-22 Time 09:12 Sent To P
Notes
2005-09-22 00:00:00TO "P" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-09-01 Cont ID  
Sent By adarroug Date 2005-09-01 Time 16:14 Rev Time 0.00
Received By adarroug Date 2005-09-01 Time 16:14 Sent To P
Notes
2005-09-01 00:00:00TO "P" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-08-01 Cont ID  
Sent By adarroug Date 2005-08-01 Time 16:42 Rev Time 0.00
Received By adarroug Date 2005-08-01 Time 16:42 Sent To  
Notes
2005-08-01 00:00:00TO "COMM" BD#58

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-07-24 Cont ID  
Sent By jwitmer Date 2005-07-24 Time 13:44 Rev Time 0.00
Received By jwitmer Date 2005-06-21 Time 08:37 Sent To  
Notes
2005-06-23 00:00:00TO "COMM" BD#61
2005-06-21 00:00:00IN INCOMING AWAITING SPACE ON "COMM" BD

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2005-12-27 Cont ID  
Sent By tgordon Date 2005-12-27 Time 13:44 Rev Time 0.45
Received By tgordon Date 2005-12-27 Time 13:44 Sent To  
Notes
2005-12-27 00:00:00*** PROVISO ***
 1) PLEASE REFER TO SECTION 307.2.4 FBC/M
 SECONDARY DRAIN SYSTEM.
 2) PLEASE REFER TO SECTION 606.2.1 FBC/M
 SMOKE DETECTION SYSTEM CONTROL.
 3) PLEASE REFER TO SECTION 606.4.1 FBC/M
 SUPERVISION.
 4) ADDITONAL PERMITS REQUIRED
 1) WALK IN COOLERS
 2) KITCHEN HOODS
 3) HOOD SUPPRESSION
 MECH. PLANS REVISION.
 MECHANICAL PLAN REVIEW BY;
 TOM GORDON (561) 805-6729.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2005-07-22 Cont ID  
Sent By hmoser Date 2005-07-22 Time 14:29 Rev Time 0.00
Received By hmoser Date 2005-07-22 Time 13:24 Sent To  
Notes
2005-07-22 00:00:00PASS PROVISO
 1) PLEASE REFER TO SECTION 307.2.4
 SECONDARY DRAIN SYSTEM.FBC.(M)
 2) PLEASE REFER TO SECTION 606.2.1 SMOKE
 DETECTION SYSTEM CONTROL.FBC(M)
 3) PLEASE REFER TO SECTION 606.4.1
 FBC.(M) SUPERVISION.
 4) ADDITONAL PERMITS REQUIRED
 1) WALK IN COOLERS
 2) KITCHEN HOODS
 3) HOOD SUPPRESSION
 PLAN REVIEW BY HAROLD MOSER 561-805-6732

Review Stop P PLUMBING
Rev No 4 Status P Date 2005-10-05 Cont ID  
Sent By kstevens Date 2005-10-05 Time 09:04 Rev Time 1.22
Received By kstevens Date 2005-10-05 Time 09:04 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status F Date 2005-09-21 Cont ID  
Sent By kstevens Date 2005-09-21 Time 07:48 Rev Time 1.50
Received By kstevens Date 2005-09-20 Time 14:56 Sent To  
Notes
2005-09-21 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 CHAPTER 1
  
 FROM PREVIOUS REVIEWS:
 1. PLANS SHALL BE ROUTED TO DBPR HOTEL
 AND RESTURANT DIVISION FOR REVIEW PRIOR
 TO RESUBMITTING TO CITY WPB FOR REVIEW.
 EACH SET OF PLANS SHALL BE STAMPED BY
 DBPR, AND THE 2 PAGE "WORK SHEETS SHALL
 BE ATTACHED TO EACH SET OF PLANS.
 SECTION 101.4.7. - THE PLANS ARE NOT
 STAMPED AND THE "WORK SHEETS" ARE NOT
 ATTACHED TO EACH SET OF PLANS.
 4. SHT P-1 WATER HEATER DETAIL, THE
 WATER HEATER SHALL COMPLY WITH SECTION
 607.3.2 REQUIREMENT FOR THERMAL
 EXPANSION CONTROL. PLEASE INDICATE THE
 METHOD OF COMPLIANCE ON THE PLANS. THE
 EMERGENCY PAN FOR THE WATER HEATER
 REQUIRES A DRAIN LINE. PLEASE SHOW THE
 DRAIN LINE, SIZE PIPE, PIPE MATERIAL,
 AND TERMINATION POINT OF THE DRAIN LINE
 ON THE PLANS. SECTION 504.8.2. - PER
 SECTION 104.2.1. SUCH INFORMATION SHALL
 BE SPECIFIC, AND THE TECHNICAL CODES
 SHALL NOT BE CITED AS A WHOLE OR IN
 PART, NOR SHALL THE TERM "LEGAL" OR ITS
 EQUIVALENT BE USED AS A SUBSTITUTE FOR
 SPECIFIC INFORMATION. PLEASE SHOW THE
 REQUIRED INFORMATION ON THE PLANS.
 ************NEW COMMENT************
 1B. PLEASE SEE ATTACHED SHEET CONCERNING
 THE DESIGN PROFESSIONAL AND FS
 553.80(2)(B).
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 2 Status F Date 2005-08-27 Cont ID  
Sent By pschmitz Date 2005-08-27 Time 11:29 Rev Time 0.00
Received By pschmitz Date 2005-08-27 Time 11:29 Sent To  
Notes
2005-08-27 00:00:00PLUMBING PLAN REVIEW EXAMINER, FBC 2001
 PAUL SCHMITZ561-805-6692
  
 [email protected]
 FBC 2001
 DENIED 2ND TIME
  
 1. PLANS SHALL BE ROUTED TO DBPR HOTEL
 AND RESTURANT DIVISION FOR REVIEW PRIOR
 TO RESUBMITTING TO CITY WPB FOR REVIEW.
 EACH SET OF PLANS SHALL BE STAMPED BY
 DBPR, AND THE 2 PAGE "WORK SHEETS" SHALL
 BE ATTACHED TO EACH SET OF PLANS.
 SECTION 101.4.7
 2. GREASE INTERCEPTOR SHALL BE SIZED BY
 THE ENVIRONMENTAL COMPLIANCE MANAGER.
 WASTE ORD #2938-96 OR #3434. PLEASE
 CONTACT LYNN MASSON (561) 822-2271, BY
 E-MAI [email protected], OR FAX (561)
 822-2279.- SHT.P-1, EQUIP. SCHEDULE #41
 GREASE INTERCEPTOR SHALL NOT BE LOCATED
 IN THE BUILDING IN THE FOOD PREP AREA.
 SEE ATTACHED WORK SHEET FROM.
 ENVIRONMENTAL COMPLIANCE MANAGER,
 REQUIRING 750 GAL GREASE INTERCEPTOR.
 3. SHT P-1 GREASE RISER DIAGRAM, IS
 MISLABELED AS A SANITARY RISER. SECTION
 104.2.1. ALSO THE DISH WASHER SHALL
 CONNECT TO THE SANITARY SYSTEM, NOT THE
 GREASE SYSTEM, PER UTILITY DEPT.
 THE DISH WASHER SHALL CONNECT DOWNSTREAM
 OF THE TOILET ROOM FIXTURES. SECTION
 909.1. CAN WASH TO CONNECT TO GREASE
 SYSTEM.
 4. SHT P-1 WATER RISER DIAGRAM,
 104.2.1. -THE WATER HEATER SHALL
 COMPLY WITH 607.3.2 REQUIREMENT FOR
 THERMAL EXPANSION CONTROL. - ALSO THE
 P&T VALVE DISCHARGE LINE SHALL NOT HAVE
 ANY TRAPPED SECTIONS AND SHALL HAVE A
 VISIBLE AIR GAP LOCATED IN THE SAME ROOM
 AS THE HEATER. SECTION 504.7.1.
 5. SHT P-1 THE WATER RISER DIAGRAM
 INDICATES THERE IS AN EMERGENCY PAN FOR
 THE WATER HEATER. SECTION 504.8.1 A
 DRAIN LINE IS REQUIRED FOR THE PAN PER
 SECTION 504.8.2.
 END OF COMMENTS

Review Stop P PLUMBING
Rev No 1 Status F Date 2005-07-14 Cont ID  
Sent By kstevens Date 2005-07-14 Time 13:51 Rev Time 2.95
Received By kstevens Date 2005-07-14 Time 10:32 Sent To  
Notes
2005-07-14 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 1
  
  
 1. PLANS SHALL BE ROUTED TO DBPR HOTEL
 AND RESTURANT DIVISION FOR REVIEW PRIOR
 TO RESUBMITTING TO CITY WPB FOR REVIEW.
 EACH SET OF PLANS SHALL BE STAMPED BY
 DBPR, AND THE 2 PAGE "WORK SHEETS" SHALL
 BE ATTACHED TO EACH SET OF PLANS.
 SECTION 101.4.7
 2. GREASE INTERCEPTOR SHALL BE SIZED BY
 THE ENVIRONMENTAL COMPLIANCE MANAGER.
 WASTE ORD #2938-96 OR #3434. PLEASE
 CONTACT LYNN MASSON (561) 822-2271, BY
 E-MAI [email protected], OR FAX (561)
 822-2279.
 3. SHT P-1 GREASE RISER DIAGRAM, IS
 MISLABELED AS A SANITARY RISER. SECTION
 104.2.1. ALSO THE DISH WASHER SHALL
 CONNEDT TO THE SANITARY SYSTEM, NOT THE
 GREASE SYSTEM PER UTILITY DEPT. THE DISH
 WASHER SHALL CONNECT DOWNSTREAM OF THE
 TOILET ROOM FIXTURES. SECTION 909.1.
 4. SHT P-1 WATER RISER DIAGRAM, SHOWS
 HOT & COLD TO THE ICE MACHINE, AND HOT
 AND COLD TO THE DISH WASHER. THIS DOES
 NOT REFLECT THE FOOD SERVICE EQUIPMENT
 SCHEDULE. PLEASE CLARIFY. SECTION
 104.2.1. - ALSO THE WATER HEATER SHALL
 COMPLY WITH 607.3.2 REQUIREMENT FOR
 THERMAL EXPANSION CONTROL. - ALSO THE
 P&T VALVE DISCHARGE LINE SHALL NOT HAVE
 ANY TRAPPED SECTIONS AND SHALL HAVE A
 VISIBLE AIR GAP LOCATED IN THE SAME ROOM
 AS THE HEATER. SECTION 504.7.1.
 5. SHT P-1 THE WATER RISER DIAGRAM
 INDICATES THERE IS AN EMERGENCY PAN FOR
 THE WATER HEATER. SECTION 504.8.1 A
 DRAIN LINE IS REQUIRED FOR THE PAN PER
 SECTION 504.8.2.
 6. A RPZ BACKFLOW IS REQUIRED ON THE
 WATER SERVICE TO THE RESTURANT. SECTION
 608.13.2.
 7. THE FOLLOWING INFORMATION IS REQUIRED
 FOR THE SEPERATE GAS PERMIT:
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2001
 FUEL GAS CODE.
 B. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE IF BEING USED.
 C. TYPE OF GAS, (LP OR NATURAL)
 D. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2001 FUEL GAS CODE SECS. 401.8
 THRU 402.5.2 AND TABLES 402(1) THRU
 402(34).
 E. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2001 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES (A)(3).
 F. SUBMIT CALCULATIONS FOR COMBUSTION
 AIR (IF APPLICABLE) PER FBC-2001 FUEL
 GAS CODE SECTION 304. - WATER HEATER IN
 CLOSET.
 G. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2001 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
 H. SUBMIT A DETAIL SHOWING THE TYPE,
 LOCATION, SIZE AND TERMINATION OF THE
 GAS VENTS PER FBC-2001 FUEL GAS CODE
 SECS. 502 THRU 506.
 I. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2001 FUEL GAS CODE SEC 402.2
 J. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
 K. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND
 APPURTENANCES PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
 L. EMERGENCY HOOD SHUT DOWN SHUT OFF
 VALVE TO BE BELOW CEILING. MANUAL SHUT
 OFF VALVE TO BE UPSTREAM. UNION TO BE
 DOWN STREAM OF MANUAL VALVE.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved