Plan Review Details - Permit 05061225
Plan Review Stops For Permit 05061225
Review Stop G GAS REVIEW
Rev No 5 Status P Date 2006-04-12 Cont ID  
Sent By mperson Date 2006-04-12 Time 09:54 Rev Time 1.00
Received By mperson Date 2006-04-12 Time 09:54 Sent To PC
Notes
2006-04-12 00:00:00REVISION: EXTEND U/G PE GAS 110' FOR
 POOL HEATERS, RELOCATED GAS METER,
 ELIMINATED ONE WATER HEATER

Review Stop G GAS REVIEW
Rev No 4 Status P Date 2005-10-15 Cont ID  
Sent By jleech Date 2005-10-15 Time 09:07 Rev Time 0.50
Received By jleech Date 2005-10-15 Time 09:07 Sent To  
Notes
2005-10-15 00:00:00ADDED 2- DRYERS TO GAS DIAGRAM.

Review Stop G GAS REVIEW
Rev No 3 Status P Date 2005-08-30 Cont ID  
Sent By jleech Date 2005-08-30 Time 11:56 Rev Time 1.00
Received By jleech Date 2005-08-30 Time 11:56 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2005-08-09 Cont ID  
Sent By jleech Date 2005-08-09 Time 11:46 Rev Time 1.00
Received By jleech Date 2005-08-09 Time 11:46 Sent To  
Notes
2005-08-09 00:00:00DENIED; SECOND TIME
 1.NO FUTURE STUBOUTS FOR GENERATOR.
 GENERATOR LOCATION MUST BE APPROVED BY
 ZONING AND ELECTRIC PLANS MUST BE
 SUBMITED.
 2.POOL HEATER HAS BEEN OMITED FROM
 REVISED PLAN. (POOL CONTRACTORS PERMIT
 INCLUDES THE INSTALLATION OF A GAS
 HEATER)
 3.SHOW LOCATIONS OF ALL SHUTOFF VALVES
 AND REGULATORS THAT WILL BE INSTALLED.
 4.SUBMIT CUT SHEETS FOR REGULATORS.
 5.LONGEST RUN IS STILL NOT CORRECT. (
 LOOK ON LINE DRAWING FROM METER TO WATER
 HEATER AT TOP OF THE PAGE) TOTAL OF
 169'.
 6.TOTAL BTU'S DO NOT ADD UP.
 7.WHAT IS THE BTU RATING OF THE FUTURE
 TANKLESS WATER HEATER?
 GAS PLAN REVIEW BY;
 JOHN LEECH
 805-6695

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2005-06-30 Cont ID  
Sent By jleech Date 2005-06-30 Time 09:20 Rev Time 1.00
Received By jleech Date 2005-06-30 Time 09:20 Sent To  
Notes
2005-06-30 00:00:00DENIED;
 1.TOTAL BTU'S IS NOT CORRECT, POOL
 HEATER IS 400,000 BTU,S. LONGEST RUN
 WOULD BE 133' OF PE FOR POOL HEATER.
 FUTURE EQUIPMENT MUST BE SIZED TO MAX.
 BTU,S SO PIPING WILL BE SIZED FOR FUTURE
 LOAD.
 2.NO FUTURE STUBOUTS PERMITED FOR FUTURE
 GENERATORS. RES. GEN. PERMIT APPLICATION
 MUST BE SUBMITED WITH GAS PLANS AND
 PERMIT APPLICATION.
 GAS PLAN REVIEW BY;
 JOHN LEECH
 805-6695

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2006-04-10 Cont ID  
Sent By adarroug Date 2006-04-10 Time 10:05 Rev Time 0.00
Received By adarroug Date 2006-04-10 Time 10:05 Sent To G
Notes
2006-04-10 00:00:00TO "G" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-09-27 Cont ID  
Sent By adarroug Date 2005-09-27 Time 10:13 Rev Time 0.00
Received By adarroug Date 2005-09-27 Time 10:13 Sent To G
Notes
2005-09-27 00:00:00TO "G" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-08-19 Cont ID  
Sent By adarroug Date 2005-08-19 Time 16:17 Rev Time 0.00
Received By adarroug Date 2005-08-19 Time 16:17 Sent To G
Notes
2005-08-19 00:00:00TO "G" BOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-07-28 Cont ID  
Sent By adarroug Date 2005-07-28 Time 18:52 Rev Time 0.00
Received By adarroug Date 2005-07-28 Time 18:52 Sent To G
Notes
2005-07-28 00:00:00TO "G" BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-06-20 Cont ID  
Sent By shill Date 2005-06-20 Time 13:46 Rev Time 0.00
Received By shill Date 2005-06-20 Time 13:46 Sent To G
Notes
***NONE***