Plan Review Details - Permit 05061207
Plan Review Stops For Permit 05061207
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2005-07-25 Cont ID  
Sent By alange Date 2005-07-25 Time 11:00 Rev Time 0.33
Received By alange Date 2005-07-25 Time 11:00 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2005-08-24 Cont ID  
Sent By btrobaug Date 2005-08-24 Time 07:35 Rev Time 0.50
Received By btrobaug Date 2005-08-24 Time 07:26 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2005-08-08 Cont ID  
Sent By btrobaug Date 2005-08-08 Time 16:40 Rev Time 0.50
Received By btrobaug Date 2005-08-08 Time 16:00 Sent To PC
Notes
2005-08-08 00:00:00 
  
 THE PE CANNOT SEAL THE SURVEYORS
 DRAWING. SEE 471 FS AND 472 FS.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718
 [email protected]
 FAX/:561/659-8026
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2005-06-27 Cont ID  
Sent By jleahy Date 2005-06-27 Time 14:51 Rev Time 0.30
Received By jleahy Date 2005-06-25 Time 14:51 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-08-18 Cont ID  
Sent By adarroug Date 2005-08-18 Time 15:52 Rev Time 0.00
Received By adarroug Date 2005-08-18 Time 15:52 Sent To E
Notes
2005-08-18 00:00:00TO "BTROBAUG" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-07-26 Cont ID  
Sent By adarroug Date 2005-07-26 Time 14:14 Rev Time 0.00
Received By adarroug Date 2005-07-26 Time 14:14 Sent To P
Notes
2005-07-26 00:00:00TO "P" BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-06-24 Cont ID  
Sent By adarroug Date 2005-06-24 Time 10:01 Rev Time 0.00
Received By adarroug Date 2005-06-24 Time 10:01 Sent To E
Notes
2005-06-24 00:00:00TO "E" BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-06-17 Cont ID  
Sent By shill Date 2005-07-25 Time 11:12 Rev Time 0.00
Received By alange Date 2005-06-17 Time 10:54 Sent To Z
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2005-08-08 Cont ID  
Sent By jleech Date 2005-08-08 Time 13:09 Rev Time 0.50
Received By jleech Date 2005-08-08 Time 13:09 Sent To E
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2005-07-09 Cont ID  
Sent By jleech Date 2005-07-09 Time 12:11 Rev Time 1.00
Received By jleech Date 2005-07-09 Time 12:11 Sent To B
Notes
2005-07-09 00:00:00DENIED;
 1.COMPLY WITH FBC-2001 SEC. 424.2
 FBC-2001 SEC. 424.2.6.1 ENGINERRING
 2.DESIGN AND CONSTRUCTION AND WORKMAN
 SHIP. ANSI?NSPI_5. (ADD TO NOTES)+
 3.FBC-2001 424.2.8.1 VALVES SHALL BE
 MADE OF MATERIALS THAT ARE APPROVED IN
 THE FBC PLUMBING. THEY WILL BE READILY
 ACCESSABLE FOR MAINT. AND REMOVAL.
 SEC.424.2.8.2 AND 424.2.8.3. PLEASE ADD
 TO NOTES.
 4.FBC 424.2.14.1 POOL HEATERS SHALL
 BEAR THE LABLE OIF A RECOGNIZED TESTING
 AGENCY. MANUFACTURES CUT SHT REQUIRED.
 MUST SHOW A POSITIVE MEANS TO RETAIN
 WATER IN HEATER.
 5.FBC SEC 424.2.14.4 CONNECTIONS, ALL
 WATER HEATER EQUIPMENT SHALL BE
 INSTALLED WITH FLANGES OR UNION
 CONNECTIONS ADJACENT TO HEATER. ADD TO
 NOTESGAS PIPING SHALL COMPLY WITH FBC
 FUIL GAS CODE SEPARATE PLANS AND PERMIT
 REQUIRED. ADD TO NOTES.
 PLUMBING PLAN REVIEW BY;
 JOHN LEECH
 805-6695

Review Stop Z ZONING
Rev No 1 Status P Date 2005-06-23 Cont ID  
Sent By mmclean Date 2005-06-23 Time 16:33 Rev Time 0.00
Received By mmclean Date 2005-06-23 Time 16:33 Sent To I
Notes
***NONE***