Plan Review Details - Permit 05060902
Plan Review Stops For Permit 05060902
Review Stop G GAS REVIEW
Rev No 1 Status N Date 2005-06-28 Cont ID  
Sent By jleech Date 2005-06-28 Time 15:10 Rev Time  
Received By jleech Date   Time   Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-06-14 Cont ID  
Sent By mjacobs Date 2005-06-14 Time 07:01 Rev Time 0.00
Received By mjacobs Date 2005-06-14 Time 07:01 Sent To G
Notes
2005-06-14 00:00:00TO 'GAS' BOX.

Review Stop MEDGAS MEDICAL GAS
Rev No 1 Status F Date 2005-06-28 Cont ID  
Sent By jleech Date 2005-06-28 Time 15:10 Rev Time 2.50
Received By jleech Date 2005-06-28 Time 15:10 Sent To  
Notes
2005-06-28 00:00:00DENIED;
 1.PLEASE SUBMIT EQUIPMENT SPECIFICATIONS
 FROM MANUFACTOR. NFPA SEC 5.3.10.10.13.1
 2.SHOW RISER DIAGRAM FOR VACUUM, WATER
 AND AIR. SIZE ALL PIPE.
 3.PLEASE ADD NOTE VACUUM PIPING MUST
 HAVE A 1/4" PITCH PER 10' OF PIPE, WITH
 CLEANOUTS AS REQUIRED BY SEC.
 5.3.10.10.10.3.
 4.VACUUM LINE CANNOT RUNIN CEILING TO
 SEERIZATION CENTER. (SEE NOT 3).
 5.PROVIDE SPEC. SHEETS FOR STERILZER AND
 SHOW PLUMBING REQUIRED. NO PLUMBING
 REVIEW WAS DONE UNDER MASTER PERMIT #
 05020807.PLESE SUBMIT PLUMBING PLANS FOR
 REVIEW.
 6.VACUUM SOURCE SHALL BE DIRECTLY
 CONNECTED TO THE SANITARY DRAINAGE
 SYSTEM THRU A 2" TRAP 4" DEEP WITH A
 VENT. 5.3.3.6.3.1.
 7. ADD NOTE SOLVENT-CEMENT JOINTS IN
 PLASTIC LEVEL 3 VACUUM PIPING SHALL BE
 ACCORDANCE WITH ASTM D 2855 PRESSURE
 FITTINGS ARE REQUIRED TO BE USED.
 5.3.10.3.4.
 8.THE QUALIFIER OF THE PLUMBING COMPANY
 MUST ALSO HOLD THE MEDICAL GAS
 QUALIFICATIONS.
 MED-GAS PLAN REVIEW BY;
 JOHN LEECH
 805-6695
 9.ADDITIONAL FEES ARE PERMIT FEES ARE
 DUE FOR ADDITIONAL WORK TO BE DONE IE.
 WALLS ADDED, SINKAND DENTAL CHAIRS WERE
 NOT ON ARRIGNAL PLAN AND APPLICATION SUB
 MITED IN FEB. 2005.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved