| 2005-06-28 00:00:00 | DENIED; |
| | PLEASE ADJUST YOUR NOTES, DETAILS OR |
| | SUBMITTALS TO REFLECT THE FOLLOWING |
| | INFORMATION REQUIRED FOR PLAN REVIEW. |
| | 1.COMPLY WITH FBC-2001 SEC 424.2 PRIVATE |
| | SWIMING POOLS. (NOTES) |
| | 2.FBC-2001 SEC. 424.2.6.1 ENGINEER |
| | DESIGN, CONSTRUCTION AND WORKMANSHIP. |
| | ANSI/NSPI-4 92 AND NSPI-5 (NOTES) |
| | 3.FBC-2001 424.2.8.1 VALVES SHALL BE |
| | MADE OF MATERIALS THAT ARE APPROVED IN |
| | THE FLA. BLDG. CODE, PLUMBING. THEY WILL |
| | BE READILY ACCESSIBLE FOR MAINT. AND |
| | REMOVAL. SEC. 424.2.8.2 (NOTES) |
| | FILL WAY VALVES SHALL BE INSTALLED TO |
| | INSURE PROPER FUNCTION OF THE FILTRATION |
| | SYSTEM SEC. 424.2.8.3 WHERE CHECK VALVES |
| | ARE INSTALLED THEY SHALL BE OF THE SWING |
| | OR VERTICAL CHECK PATTERNS SEC.424.2.8.4 |
| | 4.FBC-2001 424.2.9 WATER SUPPLY LOCAL |
| | ORD.#2853-95 BACKFLOW REQUIRED ON WATER |
| | SEVICE. (NOTES) |
| | 5.FBC-2001 424.2.12.1 PRESSURE TEST. |
| | PERR MANUFACTURE RECOMMENDATIONS NO AIR |
| | TEST SHALL BE SHALL BE APPROVED FOR PVC |
| | PIPE AND FITTINGS. (NOTES) |
| | 6.FBC-2001 SEC.424.2.13.2 JOINTS AND |
| | FITTINGS FBC PLBG SEC 605.21, PURPLE |
| | PRIMER REQUIRED ON PVC PIPE-ING (NOTES) |
| | 7.424.2.14.1 SWIMING POOL HEATERS SHALL |
| | BEAR THE LABLE OF A RECOGNIZEDTESTING |
| | AGENCY. 424.2.14.2 POSITIVE MEANS OF |
| | RETAINING WATER IN THE HEATER WHEN BPUMP |
| | IS SHUT OFF. 424.2.14.4 ALL WATER HEATER |
| | SHALL BE INSTALLED WITH FLANGES OR |
| | UNIONS CONNECTIONS ADJACENT TO |
| | HEATERS.(NOTES) |
| | 8.FBC.2001 424.2.15 GAS PIPING SHALL |
| | COMPY WITH FBC FUEL GAS. SEPARATE PLANS |
| | AND PERMIT REQUIRED. (NOTES) |
| | PLUMBING PLAN REVIEW BY; |
| | JOHN LEECH |
| | 805-6695 |
| | |
| | |