| Plan Review Stops For Permit 05060749 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2005-07-18 |
|
|
Cont ID |
|
| Sent By |
pschmitz |
Date |
2005-07-18 |
Time |
08:51 |
Rev Time |
0.00 |
| Received By |
pschmitz |
Date |
2005-07-18 |
Time |
08:51 |
Sent To |
PC |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2006-12-05 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2006-12-05 |
Time |
12:26 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2006-12-05 |
Time |
11:52 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2005-06-27 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2005-06-27 |
Time |
12:26 |
Rev Time |
0.75 |
| Received By |
btrobaug |
Date |
2005-06-27 |
Time |
11:58 |
Sent To |
G |
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
3 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
pschmitz |
Date |
2006-12-19 |
Time |
15:12 |
Sent To |
|
|
| Notes |
| 2006-12-19 15:12:54 | REVISON |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2006-12-06 |
|
|
Cont ID |
|
| Sent By |
pschmitz |
Date |
2006-12-06 |
Time |
10:26 |
Rev Time |
0.00 |
| Received By |
pschmitz |
Date |
2006-12-06 |
Time |
10:26 |
Sent To |
PC |
|
| Notes |
| 2006-12-06 10:50:29 | PAUL SCHMITZ | | | [email protected] FBC 2001PLUMBING | | | CODE PLAN REVIEW FBC2001FUEL GAS | | | CODEPLAN REVIEW | | | | | | DENIED | | | | | | REFERENCE: FBC-2001 FUEL GAS | | | | | | THE FOLLOWING INFORMATION IS REQUIRED | | | FOR THE GAS PERMIT REVISION: | | | | | | 1. SUBMIT AN ISOMETRIC DRAWING THAT | | | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE | | | AND CORRESPONDING LENGTHS WITH PIPE SIZES, | | | PER FBC-2004 FUEL GAS CODE. | | | 2. N/A | | | 3.N/A | | | 4. THE FBC-2001FUEL GAS CODE SECS. 401.8 | | | THRU 401.8 THRU TABLES 402.5.2 AND TAB 402(1) THRU | | | 402(34) | | | | | | 5. N/A | | | | | | 6. N/A | | | . | | | 7. N/A | | | 8. N/A | | | | | | 9. SUBMIT MANUFACTURE SHEETS FOR ALL GAS | | | EQUIPMENT TO VERIFY COMPLIANCE WITH | | | STANDARDS NFPA 54, NFPA 58, AND THE | | | FBC-2004 FUEL GAS CODE SEC 402.2. | | | | | | SHOW THE LOCATION OF ALL GAS PSI REGULATORS WITH SOV | | | AND UNION AT EA REGULATOR, | | | AND MFG CUT SHEETS. | | | | | | QUESTIONS 561-805-6692PAUL SCHMITZ |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2005-07-16 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2005-07-12 |
Time |
11:01 |
Rev Time |
0.50 |
| Received By |
pschmitz |
Date |
2005-07-12 |
Time |
11:01 |
Sent To |
M |
|
| Notes |
| 2005-07-12 00:00:00 | DENIED; | | | PIPE SIZING IS NOT TO CODE SEE FBC FUIL | | | GAS TABLE 402(2) ONE PLAN IS RED LINED | | | SEE TABLE 402(3) FOR ALTERNATIVE | | | ENGINEER DESIGN SEE COMENTS UNDER GAS | | | PERMIT # 05060629 | | | GAS PLAN REVIEW BY; | | | JOHN LEECH | | | 805-6695 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
2006-12-19 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2006-12-19 |
Time |
15:34 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2006-12-19 |
Time |
15:34 |
Sent To |
Z |
|
| Notes |
| 2006-12-19 15:34:49 | TO "Z" BOX/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2006-12-19 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2006-12-19 |
Time |
13:39 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2006-12-19 |
Time |
13:39 |
Sent To |
P |
|
| Notes |
| 2006-12-19 13:39:45 | TO "PSCHMITZ" |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2006-11-27 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2006-11-27 |
Time |
14:42 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2006-11-27 |
Time |
14:42 |
Sent To |
E |
|
| Notes |
| 2006-11-27 14:42:53 | TO "BTROBAUG" DESK/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2006-11-17 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2006-11-17 |
Time |
13:45 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2006-11-17 |
Time |
13:45 |
Sent To |
Z |
|
| Notes |
| 2006-11-17 13:46:02 | TO "Z" BOX/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2005-06-20 |
|
|
Cont ID |
|
| Sent By |
mmclean |
Date |
2005-06-20 |
Time |
11:13 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2005-06-20 |
Time |
10:40 |
Sent To |
E |
|
| Notes |
| 2005-06-20 00:00:00 | TO ELEC BOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2005-06-09 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2005-06-09 |
Time |
13:34 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2005-06-09 |
Time |
13:34 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2005-07-14 |
|
|
Cont ID |
|
| Sent By |
pschmitz |
Date |
2005-07-16 |
Time |
11:01 |
Rev Time |
0.50 |
| Received By |
prafter |
Date |
2005-07-14 |
Time |
09:45 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2006-12-26 |
|
|
Cont ID |
|
| Sent By |
mmclean |
Date |
2006-12-26 |
Time |
14:04 |
Rev Time |
0.00 |
| Received By |
mmclean |
Date |
2006-12-26 |
Time |
14:04 |
Sent To |
|
|
| Notes |
| 2006-12-26 14:04:24 | GENERATOR |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2006-11-22 |
|
|
Cont ID |
|
| Sent By |
mmclean |
Date |
2006-11-22 |
Time |
08:36 |
Rev Time |
0.00 |
| Received By |
mmclean |
Date |
2006-11-22 |
Time |
08:36 |
Sent To |
I |
|
| Notes |
| 2006-11-22 09:14:59 | DENIED. | | | 1. PLEASE PROVIDE A SITEPLAN THAT SHOWS ALL THE | | | PROPOSED WORK AND SETBACKS OF THE EXISTING STRUCUTURE | | | (FRONT/SIDES/REAR). | | | 2. PLEASE PROVIDE THE DIMESION OF THE PROPOSED DRIVEWAY | | | AND WALKWAY (WIDTH & LENGTH). | | | 3. PLEASE SPECIFY IF THE STONE WALWAY WILL BE SEALED OR | | | JUST SAND BASE. MUST MAINTAIN 1000SQ FT OR 75% OF | | | LANDSCAPE, WHICHEVER IS LESS WITHIN THE FIRST 25FT | | | FRONT SETBACK. | | | 4. PLEASE PROVIDE WALL DETAIL FOR THE PROPOSED | | | WALL/BLOCK/COLUMNS AND DRAWNING FOR THE GATE WITH | | | HEIGHT. | | | 5. PLEASE PROVIDE ELEVATION PLANS FOR THE PROPOSED WOOD | | | TRELLIS WITH THE SETBACK FROM THE FRONT PROPERTY LINE | | | AND HOW IT WILL BE ATTACHED TO THE EXISTING STRUCTURE. | | | 6. PLEASE PROVIDE EASEMENT APPROVAL FROM THE CITY OF | | | WEST PALM BEACH UTILITY DEPT. | | | 7. PLEASE PROVIDE AN ELEVATION PLAN FOR THE STONE | | | WALL. | | | 8. PLEASE CLAIFY WHAT IS A BLACK BAMBOO? | | | 9. PLEASE PROVIDE THE DISTANCE OF THE PROPOSED ELECTRIC | | | GATE FROM STREET. NEED TO MAKE SURE THAT THE GATE WILL | | | NOT CAUSE TRAFFIC TO BE BACKED UP. | | | 10. ANY GATE/FENCE/WALL/COLUMNS CAN ONLY BE A HEIGHT OF | | | 4FT HIGH WITHIN THE FIRST 25FT FRONT SETBACK. | | | | | | | | | MICHELLE MCLEAN | | | ZONING TECHNICIAN | | | 805-6720 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2005-06-20 |
|
|
Cont ID |
|
| Sent By |
mmclean |
Date |
2005-06-17 |
Time |
17:03 |
Rev Time |
0.00 |
| Received By |
mmclean |
Date |
2005-06-17 |
Time |
17:03 |
Sent To |
I |
|
| Notes |
| 2005-06-17 00:00:00 | GENERATOR ONLY. |
|
|