Plan Review Details - Permit 05060463
Plan Review Stops For Permit 05060463
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2006-02-07 Cont ID  
Sent By jgomez Date 2006-02-07 Time 08:01 Rev Time 0.40
Received By jgomez Date 2006-02-07 Time 08:01 Sent To PC
Notes
2006-02-07 00:00:00ENERGY CALCULATIONS AND BLDG REVISIONS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2005-12-07 Cont ID  
Sent By jgomez Date 2005-12-07 Time 17:51 Rev Time 0.50
Received By jgomez Date 2005-12-07 Time 17:51 Sent To PC
Notes
2005-12-07 00:00:00BUILDING REVIEW CHECKLIST:
  
 1- ENERGY CALCULATIONS SUBMITTED ARE FBC
 2004 FORMS. NEED TO PROVIDE FBC 2001
 FORMS, SINCE PLANS WERE REVIEWED UNDER
 FBC 2001.
  
 2- PROVIDE FLORIDA OR LOCAL PRODUCT
 APPROVAL AS REQUIRED BY RULE 9B-72 FOR
 ATRIUM DOOR. SEE PLANS FOR SIZE AND
 SWING DIRECTION OF DOOR.
  
 3- OWES $70.00 FOR REVISION FEES.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2005-09-22 Cont ID  
Sent By jgomez Date 2005-09-22 Time 14:49 Rev Time 0.50
Received By jgomez Date 2005-09-22 Time 14:49 Sent To PC
Notes
2005-09-22 00:00:00BUILDING SUBMITTAL CHECKLIST:
 1- ACCORDING TO ROBIN FROM KENCO
 COMMUNITIES THE ENERGY CALCS WILL BE
 RE-REVISED AGAIN TO HOUSE SPECIFIC
 ORIENTATION. RE-RESUBMIT ENERGY CALCS.
  
 2- REVISE ROOF FRAMING PLAN BY THE ENTRY
 PORCH AREA. CONCRETE BEAM DOESN'T EXTEND
 BACK TO THE FOYER AREA. ALSO, THERE IS
 NOT CONCRETE BEAM BY KNEEWALL AREA.
 REVISE AND SPECIFY CORRESPONDING TRUSS
 CONECTORS. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
  
 3- TRUSS ANCHOR SCHEDULE: REVISE # OF
 NAILS FOR HUS26. SEE 2005 CATALOGUE.
  
 4- WINDOW MULLION SPECIFIED FOR FIXED
 WINDOWS DOESN'T RESIST THE DESIGN
 PRESSURES. RE-REVISED AS REQUIRED AND
 SPECIFY CORRESPONDING CONNECTORS.
  
 5- PROVIDE PRODUCT APPROVAL FOR:
 A) 1HR FIRE RATED INSWING DOOR AS SHOWN
 ON PLANS.
  
 B) RE-REVISED WINDOW MULLION SIZE
 SPECIFIED FOR GREAT ROOM.
  
 ***NOTE: REVISION FEES WILL APPLY.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2005-07-01 Cont ID  
Sent By jgomez Date 2005-07-01 Time 13:37 Rev Time 2.00
Received By jgomez Date 2005-07-01 Time 13:36 Sent To PC
Notes
2005-07-01 00:00:00BUILDING REVIEW PROVISO:
 1- PROVIDE THE REVISED ENERGY
 CALCULATIONS FOR WORST CASE SCENARIO.
 2- SHUTTERS UNDER A SEPARATE PERMIT.
 3- ROOF FRAMING PLAN: REVISE CONNECTOR
 SPECIFIED AT FRONT PORCH MASONRY BEAMS.
 NEED MASONRY CONNECTOR. SEE DETAILS 4/D1
 AND 5/D1 AND REVISE AS REQUIRED.
 4- TRUSS ANCHOR SCHEDULE: REVISE NAIL
 SIZE FOR HUS26. SEE CATALOGUE.
 5- PROVIDE PRODUCT APPROVAL FOR:
 A) 1 HR FIRE RATED DOOR & EGRESS
 ASSEMBLY.
 B) FIXED WINDOWS NEED FLORIDA PRODUCT
 APPROVAL COVER PAGE.
 C) SINGLE HUNG WINDOWS NEED FLORIDA
 PRODUCT APPROVAL COVER PAGE.
 D) ROOF TILE NEEDS MATCHING FLORIDA
 PRODUCT APPROVAL.
 E) WINDOW MULLIONS FOR FIXED WINDOWS:
 CLEARLY SPECIFY SIZE OF MULLION AND
 ANCHOR TO BE USED AT GREAT ROOM FIXED
 WINDOW TO MEET THE DESIGN PRESSURES
 CALCULATED ON PLANS. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
 6- PROVIDE CLEAR WINDOW & DOOR SCHEDULES
 WITH SIZES MATCHING PLANS. SYMBOLS TO
 MATCH ALSO.

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2006-03-13 Cont ID  
Sent By dpalmer Date 2006-03-13 Time 20:16 Rev Time 0.00
Received By dpalmer Date 2006-03-13 Time 20:11 Sent To PC
Notes
2006-03-13 00:00:00*** REDLINED : VIF THE OCP FOR CU #1

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2006-01-17 Cont ID  
Sent By dpalmer Date 2006-01-17 Time 12:29 Rev Time 0.00
Received By dpalmer Date 2006-01-17 Time 12:29 Sent To PC
Notes
2006-01-17 00:00:00REDLINED.
  
 PLANS INDICATE THE POWDER RM AS CIRCUIT
 #38, HOWEVER #38 ON PANEL SCHEDULE IS
 MASTER BEDRM.
 PLEASE SEE 210.1C3 WHICH REQUIRES A MIN
 OF 20A #12 FOR BATH RECEPT(S).
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2005-06-15 Cont ID  
Sent By dpalmer Date 2005-06-15 Time 16:16 Rev Time 0.30
Received By dpalmer Date 2005-06-15 Time 16:16 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2006-03-10 Cont ID  
Sent By adarroug Date 2006-03-10 Time 10:28 Rev Time 0.00
Received By adarroug Date 2006-03-10 Time 10:28 Sent To E
Notes
2006-03-10 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2006-02-03 Cont ID  
Sent By adarroug Date 2006-02-03 Time 15:53 Rev Time 0.00
Received By adarroug Date 2006-02-03 Time 15:53 Sent To B
Notes
2006-02-03 00:00:00TO "JGOMEZ" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2006-01-06 Cont ID  
Sent By adarroug Date 2006-01-06 Time 09:52 Rev Time 0.00
Received By adarroug Date 2006-01-06 Time 09:52 Sent To E
Notes
2006-01-06 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-10-19 Cont ID  
Sent By adarroug Date 2005-10-19 Time 08:58 Rev Time 0.00
Received By adarroug Date 2005-10-19 Time 08:58 Sent To B
Notes
2005-10-19 00:00:00TO "JGOMEZ" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-08-24 Cont ID  
Sent By adarroug Date 2005-08-24 Time 18:28 Rev Time 0.00
Received By adarroug Date 2005-08-24 Time 18:28 Sent To B
Notes
2005-08-24 00:00:00TO "JGOMEZ" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-06-15 Cont ID  
Sent By shill Date 2005-06-15 Time 14:12 Rev Time 0.00
Received By shill Date 2005-06-15 Time 14:12 Sent To E
Notes
2005-06-15 00:00:00TO RES RACK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-06-07 Cont ID  
Sent By shill Date 2005-06-07 Time 13:11 Rev Time 0.00
Received By shill Date 2005-06-07 Time 13:11 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2005-06-17 Cont ID  
Sent By hmoser Date 2005-06-17 Time 18:19 Rev Time 0.00
Received By hmoser Date 2005-06-17 Time 18:10 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2005-06-18 Cont ID  
Sent By jleech Date 2005-06-18 Time 08:48 Rev Time 0.25
Received By jleech Date 2005-06-18 Time 08:48 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2005-06-14 Cont ID  
Sent By mmclean Date 2005-06-14 Time 17:56 Rev Time 0.00
Received By mmclean Date 2005-06-14 Time 17:56 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved