Plan Review Details - Permit 05060101
Plan Review Stops For Permit 05060101
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2005-07-20 Cont ID  
Sent By lsmith Date 2005-07-20 Time 15:37 Rev Time 0.25
Received By lsmith Date 2005-07-20 Time 15:37 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-07-19 Cont ID  
Sent By lsmith Date 2005-07-19 Time 16:51 Rev Time 0.75
Received By lsmith Date 2005-07-19 Time 16:51 Sent To  
Notes
2005-07-19 00:00:00BUILDING PLAN REVIEW:
  
  
 1.NO ELECTRICAL CONTRACTOR SIGNED ONTO
 PERMIT.THE SIGN CALLS FOR ILLUMINATED
 CHANNEL LETTERS.
  
 2. VALUE OF PERMIT IS TOO LOW ACCORDING
 TO MARSHALL/SWIFT COST GUIDELINES.
 SUBMIT PO SHOWING TOTAL VALUE INCLUDING
 MFGR., LABOR, MATERIALS & PROFIT.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-06-21 Cont ID  
Sent By adarroug Date 2005-06-21 Time 10:46 Rev Time 0.00
Received By adarroug Date 2005-06-21 Time 10:46 Sent To B
Notes
2005-06-21 00:00:00TO "MISC" BOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-06-10 Cont ID  
Sent By shill Date 2005-06-10 Time 16:22 Rev Time 0.00
Received By shill Date 2005-06-10 Time 16:22 Sent To Z
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-06-02 Cont ID  
Sent By adarroug Date 2005-06-02 Time 16:54 Rev Time 0.00
Received By adarroug Date 2005-06-02 Time 16:54 Sent To Z
Notes
2005-06-02 00:00:00TO "Z" BOX

Review Stop Z ZONING
Rev No 2 Status P Date 2005-06-20 Cont ID  
Sent By mmclean Date 2005-06-20 Time 13:55 Rev Time 0.00
Received By mmclean Date 2005-06-20 Time 13:55 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2005-06-08 Cont ID  
Sent By mmclean Date 2005-06-08 Time 13:57 Rev Time 0.00
Received By mmclean Date 2005-06-08 Time 13:57 Sent To  
Notes
2005-06-08 00:00:00DENIED
 1. NEED TO PROVIDE THE COMPLETE WIDTH OF
 THE BUILDING THAT IS BEING OCCUPIED BY
 DOLLAR STORE.
 2. NEED TO PROVIDE THE COMPLETE HIGHT OF
 THE BUILDING.
 3. MUST PROVIDE TWO COPY OF THE SIGN
 PACKAGE WITH COMPLETE INFORMATION.
 4. GRAND OPENING BANNER CAN ONLY BE USED
 AT THE TIME OF OPENING AND BE UP FOR
 30DAYS..
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved