Plan Review Details - Permit 05060021
Plan Review Stops For Permit 05060021
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2005-07-13 Cont ID  
Sent By rbrown Date 2005-07-13 Time 18:12 Rev Time 0.00
Received By rbrown Date 2005-07-12 Time 14:38 Sent To  
Notes
2005-07-12 00:00:00BUILDING PLAN REVIEW
 ******PROVISO*******
 ROBERT BROWN(561) 805 6716
 E-MAIL: [email protected]
  
  
 -PROVISO-
 THE SOUTH SETBACK IS SHOWN ON SHEET A1-1
 OF THE PLAN SET SUBMITTED WITH THE
 BUILDING PERMIT APPLICATION AND THE
 NORTH SETBACK IS NOT CLEARLY
 DIMENSIONED.SHEET A1-1 DOES NOT FORM
 PART OF THE FOUNDATION PERMIT
 APPLICATION PLAN SET.SUBMIT REVISED
 COPIES OF SHEET A0-3 WITH DIMENSIONED
 SETBACKS.
  
 NOTE:
 FBC* 104.4.5 SPECIAL FOUNDATION PERMIT.
 THE BUILDING OFFICIAL MAY, AT HIS
 DISCRETION, ISSUE A SPECIAL PERMIT FOR
 THE FOUNDATION ONLY, UPON WRITTEN
 REQUEST BY THE OWNER AND CONTRACTOR. THE
 HOLDER OF SUCH SPECIAL PERMIT IS PROCEED
 ING AT HIS/HER OWN RISK AND WITHOUT
 ASSURANCE THAT A PERMIT FOR THE
 REMAINDER OF THE WORK WILL BE GRANTED
 AND THAT CORRECTIONS WILL NOT BE
 REQUIRED IN ORDER TO MEET THE PROVISIONS
 OF THE TECHNICAL CODES.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-07-12 Cont ID  
Sent By rbrown Date 2005-07-12 Time 14:37 Rev Time 0.00
Received By rbrown Date 2005-06-27 Time 10:32 Sent To  
Notes
2005-06-27 00:00:00BUILDING PLAN REVIEW
 *******DENIED*******
 ROBERT BROWN(561) 805 6716
 E-MAIL: [email protected]
  
 APPLICANT ADVISED BY E-MAIL THAT REVIEW
 IS PENDING RECEIPT OF THREE SIGNED AND
 SEALED COPIES OF THE FOLLOWING DOCUMENTS
 SPECIFICALLY FOR REVIEW/FILING WITH THE
 FOUNDATION PERMIT:
  
 S-1-SURVEY DRAWING
  
 ARCHITECTURAL SHEETS:
 A0-2
 A1-0
 A1-1
  
 WIND TUNNEL STUDY REPORT
  
 GEOTECHNICAL (SOIL) REPORT
  
 PILE DESIGN CALCULATIONS FOR THE
 DISPLACEMENT PILES
  
 PILE LAYOUT PLAN
  
 ADDITIONAL STRUCTURAL SHEETS:
 S-1.04
 S-1.06
 S-1.08
 S-1.10
 S-1.12
 S-1.13A
 S-1.14
 S-1.16
 S-1.18
 S-1.20
 S-1.22

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-07-08 Cont ID  
Sent By adarroug Date 2005-07-08 Time 14:37 Rev Time 0.00
Received By adarroug Date 2005-07-08 Time 14:37 Sent To B
Notes
2005-07-08 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-06-30 Cont ID  
Sent By rbrown Date 2005-06-30 Time 16:38 Rev Time 0.00
Received By rbrown Date 2005-06-30 Time 16:38 Sent To  
Notes
2005-06-30 00:00:00SUBMITTAL OF THE REQUESTED ADDITIONAL
 PLANS ROUTED TO ANA MARIA APONTE WITH
 THE REMAINING PLANS FOR ZONING REVIEW.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-06-08 Cont ID  
Sent By shill Date 2005-06-08 Time 16:38 Rev Time 0.00
Received By shill Date 2005-06-02 Time 15:08 Sent To  
Notes
2005-06-30 00:00:00SENT TO ANA MARIA IN ZONING.TO BE
 RETURNED TO R BROWN AFTER ZONING REVIEW.
  
  
2005-06-21 00:00:00NEEDS REVIEW BY ZONING AND BUILDING
 ONLY.SENT TO RBROWN DESK AWAITING
 COLLECTION BY ZONING FOR REVIEW.CALLED
 ANA MARIA APONTE TO REQUEST ZONING
 REVIEW.
  
  
2005-06-08 00:00:00COMM BOARD 39
2005-06-02 00:00:00IN INCOMING AWAITING SPACE ON "COMM" BD

Review Stop Z ZONING
Rev No 1 Status P Date 2005-07-01 Cont ID  
Sent By aaponte Date 2005-07-01 Time 17:02 Rev Time 0.00
Received By aaponte Date 2005-07-01 Time 17:02 Sent To  
Notes
***NONE***