Plan Review Details - Permit 05051989
Plan Review Stops For Permit 05051989
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2005-08-20 Cont ID  
Sent By shill Date 2005-08-20 Time 13:59 Rev Time 0.00
Received By shill Date 2005-08-20 Time 13:59 Sent To PC
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2005-06-18 Cont ID  
Sent By shill Date 2005-06-18 Time 13:15 Rev Time 0.00
Received By shill Date 2005-06-18 Time 13:15 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2005-09-10 Cont ID  
Sent By dpalmer Date 2005-09-10 Time 14:18 Rev Time 0.40
Received By dpalmer Date 2005-09-10 Time 14:10 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2005-09-02 Cont ID  
Sent By dpalmer Date 2005-09-02 Time 18:21 Rev Time 0.33
Received By dpalmer Date 2005-09-02 Time 18:20 Sent To  
Notes
2005-09-02 00:00:00********* UNSAT 3RD REVIEW **********
  
 1)NOTE: PLEASE SEE SAME NOTES FROM
 PREVIOUS TWO REVIEWS STILL HAVE NOT BEEN
 ADDRESSED.
 NO CHANGES HAVE BEEN MADE TO ELECTRICAL
 PLANS.
  
 2)NOTE: PLEASE SEE NEW LOAD CALCUALTIONS
 SUBMITTED NOW INDICATE A NEW POOL SUB
 PANEL IS GOING TO BE INSTALLED.
 PLEASE CORRELATE ELECTRICAL PLANS AND
 INFORMATION SUBMITTED.
  
 3)NOTE: PLEASE SEE LOAD CALCULATIONS
 SHALL CONTAIN THE PRINTED NAME AND
 SIGNATURE OF THE EPRSON RESPONSIBLE FOR
 PLANS.
  
 4)NOTE: PLEASE SEE COPY OF FS
 553.80(2)(B).
 IF PLANS COME BACK IN WITH OUT ANY OF
 THE CODE COMPLIANCE COMMENTSADDRESSED,
 A 4X FEE SHALL BE ACCESSED.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW AND IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE IN CONTACTING
 THIS OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2005-08-16 Cont ID  
Sent By dpalmer Date 2005-08-16 Time 17:55 Rev Time 0.30
Received By dpalmer Date 2005-08-16 Time 17:54 Sent To B
Notes
2005-08-16 00:00:00*** UNSAT ***
  
 1)NOTE: PLEASE SEE NOTE # 1 FROM
 PREVIOUS REVIEW.
 NO CHNAGES WERE MADE TO PLANS??
 PLEASE SEE NO CONDUITS, CONDUCTORS,
 DISCONNECT ETC SHOWN FOR NEW HEAT PUMP.
  
 2)NOTE: PLEASE SEE FS 472.025 WHICH
 REQUIRES THE SURVEY TO CONTAIN THE
 ORIGINAL SIGNATURE AND SEAL FROM THE
 LICENSED SURVEYOR.
 FAC 61G17-7.002
 PLEASE WAS NOT PART OF ANY OF THE
 ORIGINAL COMMENTS, HOWEVER PLANS ARE
 GOING BACK AT THIS TIME, PLEASE SEE BLDG
 REVIEW COMMENTS FOR THIS.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2005-06-08 Cont ID  
Sent By dpalmer Date 2005-06-08 Time 09:10 Rev Time 0.30
Received By dpalmer Date 2005-06-08 Time 09:10 Sent To P
Notes
2005-06-08 00:00:00*********** UNSAT ************
  
 1)NOTE: PLEASE SEE PLANS MENTIONS A NEW
 HEAT PUMP, HOWEVER NO FEEDERS, CONDUITS
 OCP ETC IS SHOWN.
 215.5
  
 2)NOTE: PLEASE SUBMIT LOAD CALCAULTIONS
 SHOWING ALL NEW ELECTRICAL EQUIPMENT
 INCLUDING HEAT PUMP. PLEASE SEE ALL
 CONTINUOUS LOADS ARE TO BE SHOWN @ 125%.
 215.3,230.42, ETC.
  
 3)NOTE: PLEASE CORRELATE PERMIT
 APPLICATION WITH PLANS FOR PERMIT
 DISCRIPTION TO INCLUDE HEAT PUMP ETC.
  
  
 PLEASE SUBMIT THE ABOVE INFORAMTION FOR
 REVIEW.IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop HIST HISTORICAL
Rev No 1 Status P Date   Cont ID  
Sent By   Date 2005-05-31 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2005-05-31 00:00:00OK PER F MITNER 5-31-05

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2005-09-09 Cont ID  
Sent By adarroug Date 2005-09-09 Time 11:46 Rev Time 0.00
Received By adarroug Date 2005-09-09 Time 11:46 Sent To E
Notes
2005-09-09 00:00:00TO "DPALMER" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-08-31 Cont ID  
Sent By adarroug Date 2005-08-31 Time 16:20 Rev Time 0.00
Received By adarroug Date 2005-08-31 Time 16:20 Sent To E
Notes
2005-08-31 00:00:00TO "DPALMER" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-08-16 Cont ID  
Sent By adarroug Date 2005-08-16 Time 08:36 Rev Time 0.00
Received By adarroug Date 2005-08-16 Time 08:36 Sent To E
Notes
2005-08-16 00:00:00TO "DPALMER" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-06-06 Cont ID  
Sent By mjacobs Date 2005-06-06 Time 15:14 Rev Time 0.00
Received By mjacobs Date 2005-06-06 Time 15:14 Sent To E
Notes
2005-06-06 00:00:00TO 'E' BOX.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-06-01 Cont ID  
Sent By adarroug Date 2005-06-01 Time 08:51 Rev Time 0.00
Received By adarroug Date 2005-06-01 Time 08:51 Sent To Z
Notes
2005-06-01 00:00:00TO "Z" BOX

Review Stop P PLUMBING
Rev No 1 Status P Date 2005-06-18 Cont ID  
Sent By jleech Date 2005-06-18 Time 12:05 Rev Time 0.50
Received By jleech Date 2005-06-18 Time 12:05 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2005-06-03 Cont ID  
Sent By ebowers Date 2005-06-03 Time 11:40 Rev Time 0.00
Received By ebowers Date 2005-06-03 Time 11:40 Sent To I
Notes
***NONE***