Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2006-02-27 Cont ID  
Sent By jgomez Date 2006-02-27 Time 14:48 Rev Time 0.50
Received By jgomez Date 2006-02-27 Time 14:48 Sent To M
Notes
2006-02-27 00:00:002X WINDOW MULLIONS AND EXERCISE ROOM
 REVISION. JG.
 FIREPLACE SPECS SENT TO MECHANICAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2005-11-18 Cont ID  
Sent By jgomez Date 2005-11-17 Time 17:51 Rev Time 1.50
Received By jgomez Date 2005-11-17 Time 17:51 Sent To PC
Notes
2005-11-17 00:00:00BUILDING REVIEW APPROVED WITH PROVISO
 (PROVIDE THE FOLLOWING INFORMATION PRIOR
 TO INSTALLATION TO AVOID DELAYS OR
 CONFLICTS):
 1- PROVIDE COMPLETE INFORMATION FOR
 STORM SHUTTERS, NON-IMPACT SLIDING GLASS
 DOORS AND 2X WINDOW MULLIONSUNDER A
 SEPARATE PERMIT AS AGREED WITH THE
 CONTRACTOR.
  
 2- PROVIDE COMPLETE SPECS AND UL LISTING
 FOR TWO SIDED FIREPLACE AS SHOWN ON
 PLANS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2005-09-13 Cont ID  
Sent By jgomez Date 2005-09-13 Time 08:49 Rev Time 1.00
Received By jgomez Date 2005-09-13 Time 08:49 Sent To PC
Notes
2005-09-13 00:00:00BUILDING REVIEW THIRD CHECKLIST:
 1- OPENINGS FROM THE GARAGE DIRECTLY
 INTO A ROOM USED FOR SLEEPING PURPOSES
 IS NOT ALLOWED. SEC. 411.2.8 FBC 2001.
 "THEATER" ROOM NEXT TO THE GARAGE IS SET
 UP AS A BEDRM. THERE IS A CLOSET IN THE
 ROOM AND ELECTRICAL PLAN SHOWS SMOKE
 DETECTORS IN AND OUT OF THE ROOM WHEN
 REQUIRED FOR SLEEPING ROOMS. REVISE AS
 REQUIRED.
  
 2- NEED A COMPLETE BATHROOM WITH DOOR
 THAT ALLOWS 29" MIN. CLEAR OPENING AS
 REQUIRED BY SEC. 11-11 FBC 2001.
  
 3- PRODUCT APPROVALS FOR DOORS/WINDOWS
 SUBMITTED ARE FOR IMPACT GLAZING. THIS
 HOUSE IS SUPPOSED TO HAVE NON-IMPACT
 GLAZING. PROVIDE CORRECT PRODUCT
 APPROVAL FOR:
 A) FRENCH DOORS.
 B) FIXED WINDOWS.
 C) SINGLE HUNG WINDOWS.
 D) SLIDING GLASS DOORS
 E) CASEMENT WINDOWS.
  
 4- NEED TO SPECIFY SAFETY GLASS FOR
 WINDOWS AT HER BATH BY THE WHIRPOOL.
 SEC. 2405.2.1 FBC 2001. INFORMATION
 SUBMITTED WAS FOR IMPACT GLASS. THAT'S
 WHY THIS COMMENT WAS NOT ADDRESSED ON
 PREVIOUS CHECKLIST.
  
 5- NEED RECORDED NOTICE OF COMMENCEMENT.
  
 6- PROVIDE COMPLETE SPECS FOR BBQ HOOD
 FOR EXTERIOR USE AND SPECS FOR SPECIFIC
 GRILL TO BE INSTALLED.
  
 7- PROVIDE COPY OF PAID IMPACT FEES
 RECEIPT THAT CORRESPONDS TO THIS HOUSE.
 RECEIPT SUBMITTED IS FOR ANOTHER HOUSE.
  
 8- A) PROVIDE COMPLETE UL LISTING AND
 SPECS FOR TWO SIDED FIREPLACE AS SHOWN
 ON PLANS. INFORMATION SUBMITTED DOESN'T
 MATCH PLANS.
  
 B) PROVIDE COMBUSTION AIR CALCULATIONS
 FOR VENTLESS FIREPLACE FOR MECHANICAL
 PLANS EXAMINER REVIEW.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT (561)805-6712.
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2005-08-15 Cont ID  
Sent By jgomez Date 2005-08-15 Time 12:37 Rev Time 2.00
Received By jgomez Date 2005-08-15 Time 12:37 Sent To PC
Notes
2005-08-15 00:00:00BUILDING REVIEW CHECKLIST:
 1- NEED RECORDED NOC.
  
 2- A)PROVIDE COMPLETE SPECS AND APPROVED
 LISTING FOR GRILL. INCLUDING MODEL, ETC.
 B) PROVIDE COMPLETE SPECS AND APPROVED
 LISTING FOR HOOD FOR OUTDOOR USE.
  
 3- SLIDING GLASS DOORS: A) LOCAL PRODUCT
 APPROVAL IS IN THE REVIEW PROCESS.
 CONTACT LUIS MARTINEZ AT 805-6712.
 B) PROVIDE COMPLETE PACKAGE. THERE ARE
 SOME DRAWINGS THAT ARE MISSING.
  
 4- A) SPECIFY SIZE OF MULLION FOR FIXED
 WINDOWS AT DINING AREA TO VERIFY FOR
 CALCULATED DESIGN PRESSURES COMPLIANCE.
 B) PROVIDE PRODUCT APPROVAL FOR MULLION
 SPECIFIED ABOVE.
  
 5- SOIL TEST REPORT WAS NOT SUBMITTED.
  
 6- OPENINGS FROM THE GARAGE DIRECTLY
 INTO A ROOM USED FOR SLEEPING PURPOSES
 IS NOT ALLOWED. SEC. 411.2.8 FBC 2001.
 "THEATER" ROOM NEXT TO GARAGE IS SET UP
 AS A BEDROOM ALSO. THERE IS A CLOSET AND
 SMOKER DETECTORS REQUIRED FOR BEDROOMS.
 REVISE AS REQUIRED.
  
 7- OWES $912.89 FOR UPDATED VALUATION.
  
 8- NEED A COMPLETE BATH WITH DOOR THAT
 ALLOWS 29" MIN. CLEAR OPENING AS REQ'D
 BY SEC. 11-11 FBC 2001.
  
 9- PROVIDE COPY OF IMPACT FEES PAID
 RECEIPT THAT MATCHES PR NUMBER STAMPED
 ON PLANS.
  
 10- PROVIDE LISTING AND SPECS FOR 2
 SIDED FIREPLACE AS SHOWN ON PLANS. ONE
 SUBMITTED DOESN'T MATCH PLANS.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT 805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-07-11 Cont ID  
Sent By jgomez Date 2005-07-11 Time 11:26 Rev Time 2.00
Received By jgomez Date 2005-07-11 Time 11:26 Sent To Z
Notes
2005-07-11 00:00:00BUILDING REVIEW CHECKLIST:
 1- NEED NOTICE OF COMMENCEMENT.
  
 2- UPDATE GENERAL NOTES IN SHEET T1. SEE
 CHAPTER 35 FOR PROPER REFERENCE AND
 EDITION.
  
 3- DESIGN PARAMETERS: WHY MINIMUM SOIL
 BEARING PRESSURE IS NA?.
  
 4- PROVIDE SPECIFICATIONS FOR COLUMNS AT
 MASTER BEDROOM BAY WINDOW. SEC.
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
  
 5- PROVIDE COMPLETE SPECS AND LISTING
 FOR BBQ TO BE INSTALLED IN PORCH. SEC.
 104.2.1.2 CITY AMENDMENTS TO FBC 2001
 AND SECTION 2808 FBC 2001.
  
 6- FOOTING DETAIL #5 DOESN'T MATCH
 FOOTING BETWEEN GARAGE AND CLUB ROOM.
  
 7- PLANS SUBMITTED ARE SPECIFYING LOT 3.
 APPLICATION IS FOR LOT 20. REVISE PLANS.
  
 8- REVISE/UPDATE ALL TRUSS ANCHORS
 SPECIFYING SAME SIZE AND NUMBER OF NAILS
 AS SHOWN ON CATALOGUE THAT WAS REVISED
 TO COMPLY WITH SEC. 1609.4.3 FBC 2001.
 OTHERWISE, PROVIDE TESTING & ENGINEERING
 FOR NAIL SIZE AND NUMBER THAT DIFFER
 FROM THOSE ALREADY TESTED AND PUBLISHED
 BY THE MANUFACTURER. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
  
 9- CONNECTOR THD210 IS A WOOD TO WOOD
 CONNECTOR. SEE CATALOGUE FOR PROPER
 MASONRY CONNECTOR.
  
 10- DETAIL E/A3: CLARIFY WHY SPECIFYING
 EXP. BOLTS INTO CONCRETE. THERE IS NOT
 ATTACMENT TO CONCRETE.
  
 11- CLEARLY SPECIFY MULLION SIZE AND
 ANCHORS FOR BIG WINDOWS AT LIVING ROOM.
 SEE PRODUCT APPROVAL TO VERIFY THAT
 ANCHOR SIZE WILL MEET THE CALCULATED
 DESIGN PRESSURES. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
  
 12- PROVIDE FLORIDA OR LOCAL PRODUCT
 APPROVAL FOR:
 A) SLIDING GLASS DOORS. FLORIDA APPROVAL
 SUBMITTED DOESN'T MATCH DADE COUNTY NOA
 SUBMITTED.
  
 B) FIXED WINDOWS. 2 DIFFERENT DADE
 COUNTY NOA'S WERE SUBMITTED. SELECT ONLY
 ONE.
  
 C) CASEMENT WINDOWS. NEED FLORIDA
 PRODUCT APPROVAL.
  
 D) WINDOW MULLION FOR LIVING ROOM FIXED
 WINDOWS. SPECIFY SIZE AND FASTENERS.
  
 13- SOIL TEST REPORT SUBMITTED IS FOR
 LOT 3. NEED ONE FOR LOT 20.
  
 14- SURVEY DOESN'T MATCH PLANS. REVISE
 AS REQUIRED.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT(561)805-6712.

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2006-10-24 Cont ID  
Sent By btrobaug Date 2006-10-24 Time 08:25 Rev Time 0.50
Received By btrobaug Date 2006-10-24 Time 07:57 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2006-08-11 Cont ID  
Sent By btrobaug Date 2006-08-11 Time 12:22 Rev Time 0.50
Received By btrobaug Date 2006-08-11 Time 12:05 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2006-07-14 Cont ID  
Sent By btrobaug Date 2006-07-14 Time 17:25 Rev Time 0.33
Received By btrobaug Date 2006-07-14 Time 17:25 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2005-06-11 Cont ID  
Sent By btrobaug Date 2005-06-11 Time 13:26 Rev Time 0.50
Received By btrobaug Date 2005-06-11 Time 13:22 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 10 Status N Date 2007-01-09 Cont ID  
Sent By adarroug Date 2007-01-09 Time 16:20 Rev Time 0.00
Received By adarroug Date 2007-01-09 Time 16:19 Sent To P
Notes
2007-01-09 16:20:46TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 9 Status N Date 2006-10-18 Cont ID  
Sent By adarroug Date 2006-10-18 Time 15:30 Rev Time 0.00
Received By adarroug Date 2006-10-18 Time 15:30 Sent To E
Notes
2006-10-18 15:30:34TO "BTROBAUG" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2006-08-02 Cont ID  
Sent By adarroug Date 2006-08-02 Time 14:39 Rev Time 0.00
Received By adarroug Date 2006-08-02 Time 14:39 Sent To E
Notes
2006-08-02 00:00:00TO "BTROBAUG" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2006-02-15 Cont ID  
Sent By adarroug Date 2006-02-15 Time 18:05 Rev Time 0.00
Received By adarroug Date 2006-02-15 Time 18:05 Sent To B
Notes
2006-02-15 00:00:00TO "JGOMEZ" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2005-11-16 Cont ID  
Sent By adarroug Date 2005-11-16 Time 13:25 Rev Time 0.00
Received By adarroug Date 2005-11-16 Time 13:25 Sent To B
Notes
2005-11-16 00:00:00TO "JGOMEZ" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2005-09-01 Cont ID  
Sent By adarroug Date 2005-09-01 Time 14:41 Rev Time 0.00
Received By adarroug Date 2005-09-01 Time 14:41 Sent To B
Notes
2005-09-01 00:00:00TO "JGOMEZ" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-08-02 Cont ID  
Sent By adarroug Date 2005-08-02 Time 08:28 Rev Time 0.00
Received By adarroug Date 2005-08-02 Time 08:28 Sent To M
Notes
2005-08-02 00:00:00TO "M" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-07-28 Cont ID  
Sent By adarroug Date 2005-07-28 Time 11:28 Rev Time 0.00
Received By adarroug Date 2005-07-28 Time 11:28 Sent To Z
Notes
2005-07-28 00:00:00TO "Z" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-07-28 Cont ID  
Sent By mmclean Date 2005-07-12 Time 07:11 Rev Time 0.00
Received By adarroug Date 2005-06-09 Time 17:36 Sent To  
Notes
2005-06-09 00:00:00TO RES RACK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-07-28 Cont ID  
Sent By mmclean Date 2005-07-12 Time 07:11 Rev Time 0.00
Received By adarroug Date 2005-06-01 Time 09:40 Sent To  
Notes
2005-06-01 00:00:00TO "Z" BOX

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2006-02-27 Cont ID  
Sent By tgordon Date 2006-02-27 Time 15:53 Rev Time 0.30
Received By tgordon Date 2006-02-27 Time 15:53 Sent To  
Notes
2006-02-27 00:00:00SUBMITTAL FOR FIRE PLACE.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2005-08-02 Cont ID  
Sent By prafter Date 2005-08-02 Time 10:27 Rev Time 1.00
Received By prafter Date 2005-08-02 Time 10:29 Sent To B
Notes
2005-08-02 00:00:00MECH. PLAN REVIEW:
  
 PROVISO:R/A REQUIRED OUT OF OPT.
 GUEST SUITE.
  
 MECH. INSPECTOR TO CHECK AT TIME OF
 ROUGH INSP.
  
 PAT RAFTER 561/805/6728 OR 805/6719
 PATTY KRAUSS.
  
 PLEASE CALL IF THEAR ANY QUESTIONS.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2005-06-16 Cont ID  
Sent By hmoser Date 2005-06-16 Time 17:37 Rev Time 0.00
Received By hmoser Date 2005-06-16 Time 17:30 Sent To P
Notes
2005-06-16 00:00:00PLAN DENIED
 MECHANICAL PLAN AND FLOOR PLAN DO NOT
 MATCH
 PLAN REVIEW BY HAROLD MOSER 561-805-6732

Review Stop P PLUMBING
Rev No 2 Status P Date 2007-02-01 Cont ID  
Sent By jleech Date 2007-02-01 Time 10:12 Rev Time 0.00
Received By jleech Date 2007-02-01 Time 10:12 Sent To  
Notes
2007-02-01 10:12:42REVISED SANITARY RISER DIAGRAM OK

Review Stop P PLUMBING
Rev No 1 Status P Date 2005-06-18 Cont ID  
Sent By prafter Date 2005-08-02 Time 10:29 Rev Time 0.33
Received By jleech Date 2005-06-18 Time 07:10 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2005-08-01 Cont ID  
Sent By mmclean Date 2005-08-01 Time 11:49 Rev Time 0.00
Received By mmclean Date 2005-08-01 Time 11:49 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2005-07-12 Cont ID  
Sent By mmclean Date 2005-07-12 Time 07:09 Rev Time 0.00
Received By mmclean Date 2005-06-09 Time 16:03 Sent To  
Notes
2005-07-12 00:00:00DENIED,
 1. PLANS AND SURVEY DOES NOT MATCH,
 SURVEY SHOWS A LOT 30 AND PLANS FOR A
 LOT AND APPLICATION SHOWS LOT 20.
 2. PLANS/SURVEY/APPLICATION/COMPUTER
 SYSTEMS MUST SHOW THE SAME LOT.
 3. ZERO LOT MUST BE LOT APPROVED IN THE
 MINOR AMENDMENT.
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720
2005-06-09 00:00:00ZONING TO REVIEW LAST. NEED GRACE
 OPINION ON PERMIT