| Plan Review Stops For Permit 05051828 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
N |
Date |
2005-07-26 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2005-07-26 |
Time |
14:54 |
Rev Time |
0.00 |
| Received By |
btrobaug |
Date |
2005-07-26 |
Time |
14:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2005-06-16 |
|
|
Cont ID |
|
| Sent By |
lsmith |
Date |
2005-06-16 |
Time |
15:17 |
Rev Time |
0.50 |
| Received By |
lsmith |
Date |
2005-06-16 |
Time |
15:16 |
Sent To |
|
|
| Notes |
| 2005-06-16 00:00:00 | BUILDING PLAN REVIEW; FAILED | | | | | | 1. SUBMIT MFGR. SPECIFICATION SHOWING | | | REQUIREMENTS FOR CONCRETE PAD AND TYPE | | | OF ANCHORING REQUIRED. | | | | | | 2. WHAT IS THE SIZE OF THE GENERATOR? | | | | | | 3. THE PERSON RESPONSIBLE FOR THE | | | DRAWING MUST PRINT THEIR NAME & SIGN THE | | | PLANS PER 104.2.1 | | | | | | 4. VERIFY VALUATION FOR PERMIT FEES. | | | | | | | | | ANY QUESTIONS PLEASE CALL: | | | LEA SMITH, BUILDING PLANS EXAMINER | | | 805-6713 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2005-07-26 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2005-07-26 |
Time |
14:53 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2005-07-26 |
Time |
13:48 |
Sent To |
PC |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2005-06-11 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2005-06-11 |
Time |
10:16 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2005-06-11 |
Time |
10:08 |
Sent To |
M |
|
| Notes |
| 2005-06-11 00:00:00 | PLEASE MAKE THE FOLLOWING CORRECTIONS | | | FOR CODE COMPLIANCE AND RESUBMIT FOR | | | REVIEW. | | | | | | 1} PLEASE PROVIDE MANUFACTURER | | | SPECIFICATIONS FOR THE GENERATOR. | | | | | | 2} INDICATE THE PRIME MOVER FOR THE | | | GENERATOR AND HOW STORED , IF | | | APPLICABLE.(OTHER THAN NATURAL GAS). | | | | | | 3)INDICATE GROUNDING METHOD. | | | | | | 4} INDICATE RATING, TYPE AND LOCATION OF | | | DISCONNECT PER 225.31-36 AND 230.70 | | | CWPB. | | | | | | 5} PROVIDE A LOAD CALCULATIION FOR THE | | | CIRCUITS INTENDED TO BE SERVED BY THE | | | GENERATOR AND A PANEL SCHEDULE OF SAME. | | | | | | 6} PROVIDE INFORMATION REGARDING HOW | | | LOADS ARE TO BE TRANSFERRED. ALSO SPECS | | | ON TRANSFER SWITCH. | | | | | | 7} GIVE THE SIZE OF ALL CONDUCTORS AND | | | CONDUITS BEING INSTALLED. | | | | | | 8} THE VALUATION ON THE APPLICATION MUST | | | INCLUDE ALL COST FOR THIS PROJECT, | | | INCLUDING THE COST OF THE GENERATOR, | | | LABOR AND MATERIAL. PLEASE CHANGE | | | VALUATION ON THE APPLICATION TO REFLECT | | | SAME PER 104.6.5.FBC.AND CWPB. | | | | | | 9} THE DESIGNER OF RECORD MUST PRINT AND | | | SIGN NAME ON PLANS PER 104.2.1 FBC. | | | | | | IF THERE ARE ANY QUESTIONS PLEASE CALL. | | | | | | | | | | | | BILL TROBAUGH | | | ELECTRICAL PLAN REVIEW | | | 561/805-6718 | | | [email protected] | | | FAX/:561/659-8026 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2005-07-25 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-07-25 |
Time |
16:08 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-07-25 |
Time |
16:08 |
Sent To |
E |
|
| Notes |
| 2005-07-25 00:00:00 | TO "BTROBAUG" DESK/RESUB |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2005-06-06 |
|
|
Cont ID |
|
| Sent By |
mjacobs |
Date |
2005-06-06 |
Time |
16:18 |
Rev Time |
0.00 |
| Received By |
mjacobs |
Date |
2005-06-06 |
Time |
16:18 |
Sent To |
E |
|
| Notes |
| 2005-06-06 00:00:00 | TO 'E' BOX. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2005-06-16 |
|
|
Cont ID |
|
| Sent By |
lsmith |
Date |
2005-06-16 |
Time |
15:14 |
Rev Time |
0.00 |
| Received By |
lsmith |
Date |
2005-05-31 |
Time |
15:29 |
Sent To |
|
|
| Notes |
| 2005-05-31 00:00:00 | TO "Z" BOX |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
N |
Date |
2005-06-14 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2005-06-14 |
Time |
08:23 |
Rev Time |
0.35 |
| Received By |
pkrauss |
Date |
2005-06-14 |
Time |
08:07 |
Sent To |
P |
|
| Notes |
| 2005-06-14 00:00:00 | PROVISO: | | | ADDITIONAL PERMIT REQUIRED FOR LP GAS. | | | | | | TANK LOCATION SHALL COMPLY WITH NFPA 58, | | | SEE ATTACHED; FIGURE I.1(A) INICATES | | | CLEARENCES FOR CYLINDERS, FIGURE I.1(B) | | | ILLUSTRATES CLEARENCES FOR ABOVEGROUND | | | TANKS & FIGURE I.1(C) FOR THE | | | UNDERGROUND TANKS. | | | | | | GENERATOR EXHAUST SHALL COMPLY WITH 2001 | | | FBC(M) 804.3.4 & 804.3.5. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT (561)805-6719. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2005-06-14 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2005-06-14 |
Time |
13:08 |
Rev Time |
0.25 |
| Received By |
kstevens |
Date |
2005-06-14 |
Time |
13:08 |
Sent To |
B |
|
| Notes |
| 2005-06-14 00:00:00 | SEPARATE GAS PERMIT/PLANS REQUIRED. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2005-06-03 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
2005-06-03 |
Time |
|
Sent To |
HIST |
|
| Notes |
|
|