| Plan Review Stops For Permit 05050204 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2006-01-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2006-01-13 |
Time |
08:10 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2006-01-13 |
Time |
07:26 |
Sent To |
|
|
| Notes |
| 2006-01-13 00:00:00 | REVISED SITE PLAN/ CHANGED LOCATION OF | | | STRUCTURE. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2005-11-14 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2005-11-14 |
Time |
08:07 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2005-11-14 |
Time |
07:15 |
Sent To |
|
|
| Notes |
| 2005-11-14 00:00:00 | BUILDING PROVISO | | | | | | INSUFFICENT INFORMATION SUBMITTED FOR | | | STORM PANEL REVIEW & KEY PLAN DOES NOT | | | MATCH THE ARCHITECTURAL FLOOR PLANS FOR | | | NUMBER OF OPENINGS ON LEFT SIDE. | | | | | | A SEPARATE PERMIT AND FEES WILL BE | | | REQUIRED FOR THE STORM PANELS. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2005-08-10 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2005-08-10 |
Time |
10:36 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2005-08-10 |
Time |
10:36 |
Sent To |
|
|
| Notes |
| 2005-08-10 00:00:00 | DENIED | | | | | | 1) THE LOCATION OF THE STEEL HEADER | | | SHOWN IN THE DETAIL ON THE 8-1/2 X 11 | | | SHEET IS NOT SPECIFIED ON THE PLANS. | | | | | | 2) THE STEEL HEADER DETAIL ON THE 8-1/2 | | | X 11 SHEET DOES NOT HAVE THE REQUIRED | | | MINIMUM INFORMATION. THE PROJECT IS NOT | | | ADEQUATELY IDENTIFIED. THE FIRM LICENSE | | | NUMBER IS REQUIRED. THE FIRM ADDRESS IS | | | REQUIRED. THE PRINTED NAME OF THE PERSON | | | SEALING THE DOCUMENT IS REQUIRED. SEE | | | FAC 61G-16.004. | | | | | | 3) A SEPARATE PERMIT WILL BE REQUIRED | | | FOR THE STORM PANELS UNLESS COMPLETE | | | PRODUCT APPROVALS, INSTALLATION SCHEDULE | | | AND KEY PLAN IS SUBMIITED AT TIME OF | | | PERMIT. | | | | | | 4)FBC 1005.4.5 (GLITCH AMENDMENTS | | | JULY 1, 2003) REQUIRES AT LEAST ONE | | | MEANS OF ESCAPE FROM A DWELLING WHEN | | | SHUTTERED FOR IMPACT PROTECTION. THE | | | MEANS OF ESCAPE SHALL BE WITHIN THE | | | FIRST FLOOR OF THE DWELLING AND CAN NOT | | | BE LOCATED IN A GARAGE. OCCUPANTS IN ANY | | | PART OF THE DWELLING SHALL HAVE ACCESS | | | TO IT WITHOUT HAVING TO PASS THROUGH A | | | LOCKABLE DOOR NOT UNDER THEIR CONTROL. | | | INDICATE HOW COMPLIANCE WILL BE | | | ACHIEVED. | | | | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2005-06-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2005-06-02 |
Time |
11:00 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2005-06-02 |
Time |
06:59 |
Sent To |
|
|
| Notes |
| 2005-06-02 00:00:00 | DENIED | | | | | | 1) THE 2650 CASEMENT WINDOW IN BEDROOM | | | #2 IS REQUIRED TO COMPLY WITH EMERGENCY | | | EGRESS CLEAR OPENING SIZE. SEE FBC | | | 1005.4 | | | | | | 2) THE ANCHOR SCHEDULE ON A6 SPECIFIES | | | USP THD210 HANGERS USING TAPCON | | | FASTENERS. THESE CONNECTORS ARE NOT | | | DESIGNED OR TESTED WITH THESE FASTENERS. | | | PLEASE SPECIFY AN APPROPRIATE MASONRY | | | HANGER. | | | | | | 3) THE CONDITIONED FLOOR AREA LISTED ON | | | THE ENERGY CALC. FORMS DOES NOT MATCH | | | THE A/C AREA SPECIFIED ON THE PLANS. | | | PLEASE CORRECT. | | | | | | 4) THE GLASS BLOCK IN THE MASTER BATH | | | ARE IN HAZARDOUS LOCATIONS AND AND ARE | | | REQUIRED TO HAVE A MINIMUM UNIFORM FACE | | | THICKNESS OF .25 INCH PER FBC 2405.2.2. | | | | | | 5) THE 9' HIGH FIXED GLASS WINDOWS IN | | | THE LIVING ROOM EXCEED THE MAXIMUM | | | HEIGHT SPECIFIED ON THE PRODUCT | | | APPROVAL. | | | | | | 6) THE 12' WIDE TRANSOM WINDOW EXCEEDS | | | THE MAXIMUM ALLOWED BY THE PRODUCT | | | APPROVAL. | | | | | | 7) THE MULLION BETWEEN THE 12' SLIDING | | | GLASS DOOR AND THE TRANSOM WINDOW | | | EXCEEDS THE MAXIMUM DESIGN PRESSURE | | | SPECIFIED IN THE PRODUCT APPROVAL. | | | | | | 8) SUBMIT STATE PRODUCT APPROVAL FOR THE | | | 12' SLIDING GLASS DOOR. | | | | | | 9) SUBMIT THE EVALUATION REPORT FOR THE | | | ROBICO SHUTTERS. | | | | | | 10) SUBMIT (2) COPIES OF A KEY PLAN AND | | | INSTALLATION SCHEDULE FOR THE STORM | | | PANELS. SPECIFY THE MOUNT TYPE AND | | | FASTENER TYPE AND SPACING. | | | | | | 11) ADDITIONAL FEES ARE DUE FOR RADON | | | AND INCREASED CALCULATED VALUE. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
5 |
Status |
P |
Date |
2006-06-16 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2006-06-16 |
Time |
20:34 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2006-06-16 |
Time |
20:20 |
Sent To |
PC |
|
| Notes |
| 2006-06-16 00:00:00 | REDLINED, OCP FOR AHU'S TO BE VIF. | | | | | | 45A OCP SEEMS HIGH FOR 5KW HEAT. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2006-06-05 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2006-06-05 |
Time |
17:47 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2006-06-05 |
Time |
17:47 |
Sent To |
PC |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2005-10-09 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2005-10-09 |
Time |
17:53 |
Rev Time |
0.25 |
| Received By |
dpalmer |
Date |
2005-10-09 |
Time |
17:46 |
Sent To |
P |
|
| Notes |
| 2005-10-09 00:00:00 | REDLINED POSSIBLE CONFLICT PER 410.8 FOR | | | CLOSET LTS. | | | FIELD VERIFY. | | | STAMPED PLANS FOR CODE COMPLIANCE | | | REVIEW. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2005-08-09 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2005-08-09 |
Time |
07:32 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2005-08-09 |
Time |
07:14 |
Sent To |
B |
|
| Notes |
| 2005-08-09 00:00:00 | | | | PLEASE MAKE THE FOLLOWING CORRECTIONS | | | FOR CODE COMPLIANCE AND RESUBMIT FOR | | | REVIEW. SAME COMMENTS AS PRIOR REVIEW | | | | | | | | | 1} INDICATE THE LOCATION OF PANEL "B". | | | | | | 2} INDICATE LOCATION OF OVERCURRENT | | | PROTECTION FOR PANELS "A" & "B". | | | | | | 3} THE OCP FOR CIRCUITS 12,13 PANEL "A", | | | 12,13,14,15 PANEL "B" IS TOO LARGE FOR | | | THE CONDUCTORS PER 210.16. | | | | | | IF THERE ARE ANY QUESTIONS PLEASE CALL. | | | | | | BILL TROBAUGH | | | ELECTRICAL PLAN REVIEW | | | 561/805-6718 | | | [email protected] | | | FAX/:561/659-8026 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2005-05-17 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2005-05-17 |
Time |
07:43 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2005-05-17 |
Time |
07:40 |
Sent To |
M |
|
| Notes |
| 2005-05-17 00:00:00 | | | | PLEASE MAKE THE FOLLOWING CORRECTIONS | | | FOR CODE COMPLIANCE AND RESUBMIT FOR | | | REVIEW. | | | | | | 1} INDICATE THE LOCATION OF PANEL "B". | | | | | | 2} INDICATE LOCATION OF OVERCURRENT | | | PROTECTION FOR PANELS "A" & "B". | | | | | | 3} THE OCP FOR CIRCUITS 12,13 PANEL "A", | | | 12,13,14,15 PANEL "B" IS TOO LARGE FOR | | | THE CONDUCTORS PER 210.16. | | | | | | IF THERE ARE ANY QUESTIONS PLEASE CALL. | | | | | | BILL TROBAUGH | | | ELECTRICAL PLAN REVIEW | | | 561/805-6718 | | | [email protected] | | | FAX/:561/659-8026 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
8 |
Status |
N |
Date |
2006-05-26 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2006-05-26 |
Time |
16:12 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2006-05-26 |
Time |
16:12 |
Sent To |
E |
|
| Notes |
| 2006-05-26 00:00:00 | TO "BTROBAUG" DESK/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
7 |
Status |
N |
Date |
2006-05-23 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2006-05-23 |
Time |
09:58 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2006-05-23 |
Time |
09:58 |
Sent To |
P |
|
| Notes |
| 2006-05-23 00:00:00 | TO "P" BOX/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
2006-01-12 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2006-01-12 |
Time |
12:00 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2006-01-12 |
Time |
12:00 |
Sent To |
B |
|
| Notes |
| 2006-01-12 00:00:00 | TO "RMCDOUGAL" DESK/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2005-12-16 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-12-16 |
Time |
16:45 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-12-16 |
Time |
16:45 |
Sent To |
Z |
|
| Notes |
| 2005-12-16 00:00:00 | TO "Z" BOX/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2005-10-07 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-10-07 |
Time |
17:01 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-10-07 |
Time |
17:01 |
Sent To |
E |
|
| Notes |
| 2005-10-07 00:00:00 | TO "BTROBAUG" DESK/RESUB |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2005-08-05 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-08-05 |
Time |
14:36 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-08-05 |
Time |
14:36 |
Sent To |
E |
|
| Notes |
| 2005-08-05 00:00:00 | TO "BTROBAUGH" DESK/RESUB |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2005-05-16 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-05-16 |
Time |
08:24 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-05-16 |
Time |
08:24 |
Sent To |
E |
|
| Notes |
| 2005-05-16 00:00:00 | TO "SFR" "E" |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2005-06-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2005-06-02 |
Time |
11:00 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2005-05-06 |
Time |
14:11 |
Sent To |
|
|
| Notes |
| 2005-05-06 00:00:00 | TO "Z" BOX |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
N |
Date |
2005-05-18 |
|
|
Cont ID |
|
| Sent By |
prafter |
Date |
2005-05-18 |
Time |
08:13 |
Rev Time |
0.50 |
| Received By |
prafter |
Date |
2005-05-18 |
Time |
08:13 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2005-10-12 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2005-10-12 |
Time |
15:36 |
Rev Time |
0.00 |
| Received By |
jleech |
Date |
2005-10-12 |
Time |
15:36 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2005-08-10 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2005-08-10 |
Time |
12:31 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2005-08-10 |
Time |
12:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2005-05-26 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2005-05-26 |
Time |
07:42 |
Rev Time |
0.50 |
| Received By |
kstevens |
Date |
2005-05-26 |
Time |
07:42 |
Sent To |
B |
|
| Notes |
| 2005-05-26 00:00:00 | PASSED/PROVISO | | | | | | | | | WASH MACHINE SHALL NOT CONNECT TO A | | | DOUBLE SANT. TEE. SECTION 706.3 | | | CLEANOUT SHALL BE 4' ABOVE THE FLOOR | | | SECTION 708.10 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2006-01-10 |
|
|
Cont ID |
|
| Sent By |
mmclean |
Date |
2006-01-10 |
Time |
14:51 |
Rev Time |
0.00 |
| Received By |
mmclean |
Date |
2006-01-10 |
Time |
14:51 |
Sent To |
I |
|
| Notes |
| 2006-01-10 00:00:00 | PER MELISSA AT PARAMANT CORP., THE | | | REVISION IS CHANGE IN THE PLACEMENT OF | | | STRUCTURE ON PROPERTY AND EXTENTED | | | MASTER BEDROOM. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2006-01-07 |
|
|
Cont ID |
|
| Sent By |
mmclean |
Date |
2006-01-07 |
Time |
08:20 |
Rev Time |
0.00 |
| Received By |
mmclean |
Date |
2006-01-07 |
Time |
08:20 |
Sent To |
|
|
| Notes |
| 2006-01-07 00:00:00 | DENIED, | | | 1. NEED TO INDICATE THE CHANGES TO | | | PLANS, REVISION INDICATE CLOUDS AND | | | CLOUDS DOES NOT SHOW. | | | | | | | | | MICHELLE MCLEAN | | | ZONING TECHNICIAN | | | 805-6720 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2005-05-13 |
|
|
Cont ID |
|
| Sent By |
mmclean |
Date |
2005-05-13 |
Time |
15:36 |
Rev Time |
0.00 |
| Received By |
mmclean |
Date |
2005-05-13 |
Time |
15:36 |
Sent To |
I |
|