| 2005-05-10 00:00:00 | BUILDING PLAN REVIEW: FAILED |
| | |
| | 1.104.6.5 BUILDING PERMIT VALUATION. |
| | IF IN THE OPINION OF THE BUILDING |
| | OFFICIAL THE CLAIMED VALUATION OF |
| | BUILDING, AL- TERATION, STRUCTURE, |
| | ELECTRICAL, GAS, MECHANICAL OR PLUMBING |
| | SYSTEMS APPEARS TO BE UNDERESTIMATED ON |
| | THE APPLICATION, THE PERMIT SHALL BE |
| | DENIED, UNLESS THE APPLICANT CAN SHOW |
| | DETAILED ESTIMATES AND/OR BONA FIDED |
| | SIGNED CONTRACTS (EXCLUDING LAND VALUE) |
| | TO MEET THE APPROVAL OF THE BUILDING |
| | OFFICIAL. FOR PERMITTING PURPOSES, |
| | VALUATION FOR BUILDINGS AND SYSTEMS |
| | SHALL BE FOUND IN MARSHALL AND SWIFT OR |
| | THE SOUTHERN BUILDING CODE CONGRESS |
| | INTERNATIONAL VALUATION TABLES, LATEST |
| | EDITION, AND SHALL BE BASED ON TOTAL |
| | REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHAN- ICAL, |
| | INTERIOR FINISH, NORMAL SITE WORK |
| | (EXCAVATION AND BACKFILL FOR BUILDINGS), |
| | ARCHITECTURAL AND DESIGN FEES, OVERHEAD |
| | AND PROFIT, EXCLUDING ONLY LAND VALUE. |
| | |
| | SUBMIT PROOF OF VALUE INCLUDING |
| | MANUFACTURING BY PLASTIC COMPONENTS, |
| | INC. |
| | |
| | 2. THE ENGINEER OF RECORD MUST PUT A |
| | TITLE BLOCK ON THE PLAN PER 61G15-23.002 |
| | (2). (NATIONAL SIGN SYSTEMS) |
| | |
| | 3. CKE GROUP, INC MUST INCLUDE THEIR |
| | CERTIFICATE OF AUTHORIZATION NUMBER ON |
| | THEIR TITLE BLOCK PER 61-G1-16.003. |
| | |
| | |
| | ANY QUESTIONS PLEASE CALL: |
| | LEA SMITH, BUILDING PLANS EXAMINER |
| | 561-805-6713 |