| 2005-04-20 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 FUEL GAS |
| | FBC-2001 CHAPTER 1 |
| | 1. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2001 |
| | FUEL GAS CODE. |
| | 2. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2001 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.5.2 AND TABLES 402(1) THRU |
| | 402(34). |
| | 3. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2001 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES (A)(3). |
| | 4) A GENERATOR PERMIT SHALL BE APPLIED |
| | FOR PRIOR TO GAS PERMIT BEING ISSUED. A |
| | SURVEY WILL BE SUBMITTED WITH THE |
| | GENERATOR PERMIT APPLICATION. THERE WILL |
| | BE A REVIEW BY STRUCTURAL, ELECTRICAL, |
| | ZONING, MECHANICAL, AND GAS PLAN REVIEW |
| | PERSONAL. |
| | 5) SEARCH OF RECORDS INDICATE THAT THE |
| | POOL PLUMBING HAS NOT PASSED THE |
| | PERIMETER INSPECTION, NOR HAS IT HAD A |
| | FINAL PLUMBING INSPECTION. - A POOL |
| | PLUMBING PERMIT WILL BE REQUIRED TO DO |
| | THE PLUMBING TO THE POOL HEATER PRIOR TO |
| | GAS PERMIT BEING ISSUED. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | PER N. MELICK MANUFACTURE INFO |
| | NOT REQUIRED FOR 1 & 2 FAMILY HOMES. |
| | JULY 17, 2002 OFFICAL INTERPRETATION. |
| | THE FIELD INSPECTOR SHALL VERIFY THE |
| | INSTALLED EQUIPMENT INPUT DOES NOT EX- |
| | CEED THE PIPE SIZING. |
| | |