Plan Review Details - Permit 05031931
Plan Review Stops For Permit 05031931
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2005-05-14 Cont ID  
Sent By jleech Date 2005-05-14 Time 07:46 Rev Time 0.50
Received By jleech Date 2005-05-14 Time 07:46 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2005-04-18 Cont ID  
Sent By kstevens Date 2005-04-18 Time 17:09 Rev Time 0.75
Received By kstevens Date 2005-04-18 Time 17:09 Sent To  
Notes
2005-04-18 00:00:00DENIED
 REFERENCE: FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 1
  
 1) AS REQUIRED BY 104.3.1.1 OF THE CODE,
 TWO OR MORE COPIES OF DRAWINGS WITH
 SUFFICIENT CLAIRTY AND DETAIL TO
 INDICATE THE NATURE AND CHARACTER OF THE
 WORK, SHALL ACCOMPANY THE APPLICATION
 FOR A PERMIT. - ONLY ONE ISOMETRIC HAS
 BEEN SUBMITTED. SECTION 104.2.1. -
 REDRAW THE ISOMETRIC WITH CORRECTIONS
 NOTED IN RED AND RESUBMIT.
 2) 1-1/4" PE PIPE IS REQUIRED FOR
 399,000 BTU'S AT 125'
 3) A RED TAG HAS BEEN ISSUED REQUIRING 4
 TIMES THE FEE. A BALANCE OF $151.00 IS
 REQUIRED FOR THE PERMIT.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-04-28 Cont ID  
Sent By adarroug Date 2005-04-28 Time 10:42 Rev Time 0.00
Received By adarroug Date 2005-04-28 Time 10:42 Sent To G
Notes
2005-04-28 00:00:00TO "KSTEVENS" BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-04-15 Cont ID  
Sent By adarroug Date 2005-04-15 Time 09:36 Rev Time 0.00
Received By adarroug Date 2005-04-15 Time 09:36 Sent To G
Notes
2005-04-15 00:00:00TO "G" BOX


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved