Plan Review Details - Permit 05031319
Plan Review Stops For Permit 05031319
Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status F Date 2005-12-30 Cont ID  
Sent By jgomez Date 2005-12-30 Time 10:38 Rev Time 0.50
Received By jgomez Date 2005-12-30 Time 10:38 Sent To PC
Notes
2005-12-30 00:00:00BUILDING SUBMITTAL CHECKLIST:
 1- PROVIDE COMPLETE INFORMATION FOR
 STORM SHUTTERS:
 A) PROVIDE COMPLETE INSTALLATION
 SCHEDULE. SEE ATTACHED SAMPLE OF
 INSTALLATION SCHEDULE THAT INCLUDES ALL
 REQUIRED INFORMATION FOR PLAN REVIEW.
 PROVIDE ALL INFORMATION TO EXPEDITE PLAN
 REVIEW. IT WILL ALSO FACILITATE
 INSPECTION.
  
 B) ACCORDING TO THE SPAN TABLE ON
 DRAWING 4 OF 7 OF SHUTTERS DRAWINGS,
 OPENING #9 EXCEEDS THE MAXIMUM SPAN
 BASED ON THE CALCULATED DESIGN
 PRESSURES. REVISE AS REQUIRED.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2005-09-23 Cont ID  
Sent By jgomez Date 2005-09-23 Time 09:07 Rev Time 0.75
Received By jgomez Date 2005-09-23 Time 09:07 Sent To PC
Notes
2005-09-23 00:00:00BUILDING SUBMITTAL CHECKLIST:
 1- NEED TO PROVIDE PRODUCT APPROVAL FOR
 8'-0" GARAGE DOORS THAT MEET THE DESIGN
 PRESSURES CALCULATED BY THE ARCHITECT.
  
 2- NEED TO PROVIDE THE STORM SHUTTERS
 INFORMATION. SEE ATTACHED REVIEW
 COMMENTS.
  
 ***NOTE: ALL OTHER ITEMS FROM PROVISO
 DATED 7-29-05 ARE OK.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2005-09-20 Cont ID  
Sent By jgomez Date 2005-09-20 Time 16:19 Rev Time 0.33
Received By jgomez Date 2005-09-20 Time 16:19 Sent To PC
Notes
2005-09-20 00:00:00SUBMITTAL BUILDING REVIEW CHECKLIST:
 1- SHUTTERS INFORMATION SUBMITTED IS
 DIFFERENT FROM INFORMATION SUBMITTED AT
 TIME OF PERMIT. THIS IS A REVISION AND
 REVISION FEES APPLY. NEED TO PROVIDE
 COMPLETE INFORMATION FOR STORM SHUTTERS
 INCLUDING INSTALLATION SCHEDULE (SEE
 ATTACHED SAMPLE FOR MIN. REQ'D INFO.)
 AND KEY PLAN. ALSO, INDICATE ON DRAWINGS
 SPECIFIC MOUNTING CONDITIONS AND ANCHOR
 TYPE AND SPACING TO BE USED ACCORDING TO
 THE DESIGN PRESSURES, EDGE DISTANCE,
 PANEL SPAN, CONNECTION TYPE AND
 STRUCTURE TO BE ATTACHED TO (CONCRETE OR
 CONCRETE BLOCK).
  
 2- PROVIDE INFORMATION REQUESTED ON
 PROVISO DATED 7-29-05. SEE ATTACHED.
  
 JULIO GOMEZ
 PLANS EXAMINER
 (561)805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2005-08-01 Cont ID  
Sent By jgomez Date 2005-07-29 Time 15:27 Rev Time 2.50
Received By jgomez Date 2005-07-29 Time 15:27 Sent To E
Notes
2005-07-29 00:00:00BUILDING REVIEW PROVISO:
 1- SHEET A-7: REVISE ROOF SHEATHING NAIL
 TYPE REQUIRED FOR ROOF WITH 25' MEAN
 ROOF HEIGHT ON ZONE 3 OF ROOF. SEE TABLE
 2306.1 OF CITY AMENDMENTS TO FBC 2001.
 **NOTE:ZONE 3 INCLUDES CORNERS. SEE
 FIGURE 1606.2(C) FBC 2001.
 2-SHEET A-8: A) REVISE ROOF SHEATHING
 NAIL FOR ZONE 3. SEE COMMENT #1 ABOVE.
 B) REVISE CONNECTOR G SPECIFIED FOR
 MASONRY WALL ON LEFT HAND SIDE BY
 BEDROOM #4. NEED MASONRY CONNECTOR.
 C) DETAIL 4/A12 BY BEDROOM #3 DOESN'T
 MATCH. SEE ORIENTATION OF FLOOR TRUSSES
 AND ROOF TRUSSES AT FIRST FLOOR.
 3- STAIR SECTION ON SHEET A13: NOTE
 REGARDING 2X PICKETS AT 6"OC CONTRADICTS
 NOTE 4" SPHERENOT PASS THRU. REVISE.
 4- DESIGNER OF RECORD TO SPECIFY ON
 PLANS ROOF TILE FASTENING AS REQ'D
 BY SEC. 104.2.1.1 CITY AMENDMENTS TO FBC
 5- PROVIDE FLORIDA OR LOCAL PRODUCT
 APPROVAL FOR: A) ALL MULLIONS INCLUDING
 ONE SPECIFIED FOR 12'-0" SLIDING DOORS.
 B) 8'-0" GARAGE DOORS THAT MEET THE
 DESIGN PRESSURES CALCULATED ON PLANS.
 C) TRUSS CONNECTORS SPECIFIED ON PLANS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-04-26 Cont ID  
Sent By jgomez Date 2005-04-26 Time 17:51 Rev Time 2.50
Received By jgomez Date 2005-04-26 Time 17:51 Sent To PC
Notes
2005-04-26 00:00:00BUILDING REVIEW CHECKLIST:
 1- SHEET A-2: A) FOUNDATION NOTE #1.
 NEED 6 MIL, NOT 4 MIL VAPOR BARRIER.
 SEC. 1909.2 FBC 2001.
  
 B) REVISE FOUNDATION NOTE #2. SEE
 CHAPTER 19 FBC 2001 FOR PROPER ACI
 REFERENCE.
  
 C) THERE IS SOME OVERLAPPING INFORMATION
 THAT DOESN'T ALLOW NOTES TO BE LEGIBLE.
 REVISE AS REQUIRED.
  
 2- SHEET A-3: A) DESIGN PARAMETERS:
 WHERE IS THE BASIC VELOCITY PRESSURE
 TAKEN FROM? IT IS NOT SHOWN IN CHAPTER
 16 FBC 2001.
  
 B) REVISE HANDRAIL HEIGHT. SEE SECTION
 1007.5.1 FBC 2001 (EXEMPTION #3).
  
 C) PROVIDE ATTIC ACCESS AT MASTER SUITE
 WING AND AT BEDROOM #2 WING. AS REQUIRED
 BY SEC. 2309.6 FBC 2001.
  
 3- SHEET A-4: A) REVISE HANDRAIL HEIGHT.
 SEE SEC. 1007.5.1 (EXEMPTION #3) FBC.
  
 B) THERE IS SOME INFORMATION THAT IS
 OVERLAPPING. REVISE AS REQUIRED TO MAKE
 IT LEGIBLE.
  
 4- SHEET A-10: PROVIDE SMOKE DETECTOR ON
 FIRST FLOOR IN CLOSE PROXIMITY TO THE
 STAIRWAY LEADING TO THE 2ND FLOOR. SMOKE
 DETECTOR IS SHOWN ABOVE THE STAIRS. THIS
 IS A DOUBLE HEIGHT CEILING AND THERE IS
 ALREADY A SMOKE DETECTOR SHOWN ON SHEET
 A-11. REVISE AS REQUIRED TO COMPLY WITH
 SEC. 905.2.2 FBC 2001
  
 5- SHEET A-5: FRONT ELEVATION CALLS FOR
 FLAT CEMENT TILE. PRODUCT APPROVAL
 SUBMITTED IS FOR "S" TILE. REVISE.
  
 6- SHEET A-7: A) REVISE ROOF SHEATHING
 NAIL TYPE REQUIRED FOR ROOF WITH 25'
 MEAN ROOF HEIGHT ON ZONE 3 OF ROOF. SEE
 TABLE 2306.1 OF CITY AMENDMENTS TO FBC.
  
 B) REVISE/UPDATE TRUSS ANCHOR SCHEDULE.
 SEE LATEST CATALOGUE. PROVIDE COMPLETE
 ENGINEERING CALCULATIONS FOR NAIL TYPE
 AND NUMBER THAT DIFFERS FROM THOSE
 TESTED AND PUBLISHED BY MANUFACTURER.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.
  
 7- SHEET A-8: A) REVISE ROOF SHEATHING
 NAIL TYPE. SEE TABLE 2306.1 CITY
 AMENDMENTS TO FBC 2001 FOR ZONE 3 ON
 ROOF OVER 25'-0" MEAN ROOF HEIGHT.
  
 B) REVISE CONNECTOR G SPECIFIED FOR
 MASONRY WALL ON LEFT HAND SIDE. NEED
 WOOD TO MASONRY CONNECTOR.
  
 C) DETAIL 2/A-13 SHOWN ON RIGHT HAND
 SIDE DOESN'T APPLY. REVISE AS REQUIRED.
  
 8- STAIR SECTION ON SHEET A-13 DOESN'T
 MATCH STAIRS SHOWN ON PLANS. REVISE AS
 REQUIRED. AND PROVIDE COMPLETE
 INFORMATION INCLUDING FIREBLOCKING AS
 REQUIRED BY SEC. 2305.2 FBC 2001.
  
 9- GARAGE DOOR: PROVIDE PRODUCT APPROVAL
 FOR 8'-0" WIDE GARAGE DOOR THAT MEETS
 THE DESIGN PRESSURES SHOWN ON PLANS.
  
 10-SPECIFY ROOF TILE FASTENING. IT'S THE
 DESIGNER OF RECORD RESPONSIBILITY NOT HE
 CONTRACTOR.. SEE SEC. 104.2.1.1 OF CITY
 AMENDMENTS TO FBC 2001.
  
 11- PROVIDE COMPLETE DETAIL/SPECS FOR
 CEILING INSTALLATION AT ENTRY AND REAR
 PORCHES. SEE ASTM C926 AND ASTM C1063.
 SPECIFY ALL FASTENERS AND SPACING.
  
 12- OWES $934.91 FOR UPDATED VALUATION
 AND RADON FEES.
  
 13- SPECIFY MULLION SIZE AND ANCHORS TO
 BE USED BETWEEN 12'-0" WIDE SLIDING
 GLASS DOORS AND TRANSOM ABOVE TO VERIFY
 STRUCTURAL ADEQUACY OF MULLION SELECTED.
  
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.
  
 14- PROVIDE PRODUCT APPROVAL FOR SINGLE
 FRENCH DOORS AS SHOWN ON PLANS.
  
 15- PROVIDE PRODUCT APPROVAL FOR ENTRY
 DOORS WITH IMPACT GLAZING AS SHOWN ON
 PLAN AND ELEVATIONS.
  
 PLEASE DON'T STAPLE PRODUCT APPROVALS TO
 PLANS AND IF YOU HAVE ANY QUESTIONS,
 PLEASE CALL JULIO GOMEZ AT (561)805-6712

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2006-03-10 Cont ID  
Sent By dpalmer Date 2006-03-10 Time 07:04 Rev Time 0.00
Received By dpalmer Date 2006-03-10 Time 06:56 Sent To PC
Notes
2006-03-10 00:00:00RISER SHOWS 2/0'S FOR 150A PANELS, THIS
 IS OK.
  
 VIF THE OCP SHOWN FOR THE 5KW HEAT
 STRIPS, THIS SEEMS HIGH?

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2006-01-20 Cont ID  
Sent By dpalmer Date 2006-01-20 Time 21:20 Rev Time 0.00
Received By dpalmer Date 2006-01-20 Time 21:08 Sent To  
Notes
2006-01-20 00:00:00REDLINED.
  
 RISER SHOWS 2/0'S FOR 150A PANELS, THIS
 IS OK.
  
 VIF THE OCP SHOWN FOR THE 5KW HEAT
 STRIPS, THIS SEEMS HIGH?

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2005-08-02 Cont ID  
Sent By dpalmer Date 2005-08-02 Time 07:56 Rev Time 0.00
Received By dpalmer Date 2005-08-01 Time 20:05 Sent To P
Notes
2005-08-02 00:00:00NEW SHEET A-10 SUBMITTED.
 OLD SHEET A-10 NOT SUBMITTED TO SHOW
 BEING VOIDED.
  
 PLEASE SEE MISSING RECEPTS IN LIVING
 ROOM PER 210.52.
 PLEASE SEE SERVICE IS REVISED TO SHOW A
 NEW 400A SERVICE. PLEASE SEEE 250.66,
 310.15B6 FOR MIN SIZING OF GROUNDING
 ELECTRODE CONDUCTOR. PLEASE SEE A 1/0MIN
 IS REQUIRED.
 PLEASE SEE WHAT APPEAR TO BE A SINGLE
 CAR GARAGE IS SHOWN AS A THREE CAR
 GARAGE?
2005-08-01 00:00:00IN ELEC FOR REVIEW, NEW ELECTRICAL
 SHEETS.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2005-03-30 Cont ID  
Sent By dpalmer Date 2005-03-30 Time 14:33 Rev Time 0.50
Received By dpalmer Date 2005-03-30 Time 13:05 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2006-03-09 Cont ID  
Sent By adarroug Date 2006-03-09 Time 15:45 Rev Time 0.00
Received By adarroug Date 2006-03-09 Time 15:45 Sent To E
Notes
2006-03-09 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2005-08-30 Cont ID  
Sent By adarroug Date 2005-08-30 Time 08:47 Rev Time 0.00
Received By adarroug Date 2005-08-30 Time 08:47 Sent To B
Notes
2005-08-30 00:00:00TO "JGOMEZ" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-08-16 Cont ID  
Sent By adarroug Date 2005-08-16 Time 08:21 Rev Time 0.00
Received By adarroug Date 2005-08-16 Time 08:21 Sent To B
Notes
2005-08-16 00:00:00TO "JGOMEZ" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-07-18 Cont ID  
Sent By adarroug Date 2005-07-18 Time 12:01 Rev Time 0.00
Received By adarroug Date 2005-07-18 Time 12:01 Sent To M
Notes
2005-07-18 00:00:00TO "M" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-03-30 Cont ID  
Sent By adarroug Date 2005-03-30 Time 09:47 Rev Time 0.00
Received By adarroug Date 2005-03-30 Time 09:47 Sent To E
Notes
2005-03-30 00:00:00TO "SFR" "E"

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-03-24 Cont ID  
Sent By adarroug Date 2005-04-26 Time 11:42 Rev Time 0.00
Received By adarroug Date 2005-03-24 Time 11:42 Sent To Z
Notes
2005-03-24 00:00:00TO "Z" BOX

Review Stop M MECHANICAL (A/C)
Rev No 2 Status N Date 2005-07-19 Cont ID  
Sent By rregueir Date 2005-07-19 Time 17:30 Rev Time 0.00
Received By rregueir Date 2005-07-19 Time 17:30 Sent To B
Notes
2005-07-19 00:00:00ENERGY CALCULATIONS AND MANUAL J
 SUBMITTED.NO PLANS.
 APPLICATION AND/OR RESUB FORM MISSING
 FROM BUNDLE.
 RJR

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2005-04-04 Cont ID  
Sent By prafter Date 2005-04-04 Time 09:18 Rev Time 0.45
Received By prafter Date 2005-04-04 Time 09:18 Sent To P
Notes
2005-04-04 00:00:00MECH. PLAN REVIEW.
  
 NO A/C PLANS OR EQUIPMENT INFORMATION.
  
 PAT RAFTER 805/6728OR 805/6719 PATTY
 KRAUSS.
  
 PLEASE CALL IF THEAR ANY QUESTION.
  

Review Stop P PLUMBING
Rev No 2 Status P Date 2005-08-02 Cont ID  
Sent By jleech Date 2005-08-02 Time 08:31 Rev Time 0.25
Received By jleech Date 2005-08-02 Time 08:31 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2005-04-06 Cont ID  
Sent By jleech Date 2005-04-06 Time 18:13 Rev Time 0.33
Received By jleech Date 2005-04-06 Time 18:13 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2005-03-29 Cont ID  
Sent By mmclean Date 2005-03-29 Time 13:46 Rev Time 0.00
Received By mmclean Date 2005-03-29 Time 13:46 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy