Plan Review Details - Permit 05021306
Plan Review Stops For Permit 05021306
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2005-04-21 Cont ID  
Sent By shill Date 2005-04-21 Time 11:15 Rev Time 2.00
Received By shill Date 2005-04-21 Time 11:15 Sent To PC
Notes
2005-04-21 00:00:00PROVISO - SHUTTERS, IMPACT FRENCH DOOR
 SEPARATE PERMIT

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2005-04-21 Cont ID  
Sent By shill Date 2005-04-21 Time 09:42 Rev Time 1.00
Received By shill Date 2005-04-21 Time 09:42 Sent To PC
Notes
2005-04-21 00:00:00****CORRECTIONS****
 TRUSS ENGINEERING
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 [email protected]
  
 1.)SEE ATTACHED FAC61G15-31.003.EACH
 SHEET IS TO INCLUDE A TITLE BLOCK.SOME
 SHEETS ARE LACKING A TITLE BLOCK; OTHERS
 HAVE A DIFFERENT ENGINEER'S NAME.
  
 2.)FAC61G15-31.003(5)(E), IF YOU ARE
 USING A SEALED COVER/INDEX SHEET THE
 INDEX IS TO BE A PART OF THAT
 COVER/INDEX SHEET.THE INDEX IS NOT
 SIGNED/SEALED AND IS NOT INCORPORATED
 INTO THE FIRST PAGE WHICH IS
 SIGNED/SEALED.
  
 3.)THE TRUSS PLACEMENT DRAWING IS NOW
 SIGNED BY THE ENGINEER, SW WARTER, BUT
 AN INK SEAL IS NOT ACCEPTABLE.THE SEAL
 IS TO BE A METAL-TYPE IMPRESSION SEAL,
 FAC61G15-23.001.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-03-18 Cont ID  
Sent By shill Date 2005-03-18 Time 13:04 Rev Time 4.00
Received By shill Date 2005-03-18 Time 13:04 Sent To PC
Notes
2005-03-18 00:00:00****CORRECTIONS****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 [email protected]
  
 1.)THE SURVEY AND SITE PLAN DO NOT
 MATCH.
  
 2.)SEE FBC1005.4.5 IN REGARDS TO A
 MEANS OF ESCAPE IN THE EVENT OF A STORM.
 ALL DOORS ON THE PLAN ARE NON-IMPACT
 GLASS.PROVIDE AT LEAST ONE MEANS OF
 ESCAPE, INDICATE ON THE PLAN, AND
 PROVIDE COMPLIANT PRODUCT APPROVAL.
  
 3.)SEPARATE PERMIT REQUIRED FOR
 SHUTTERS AS NO SHUTTER INFORMATION HAS
 BEEN SUBMITTED AND IMPACT PROTECTION
 REQUIRED FBC1606.1.4.
  
 4.)PROVIDE FIRE RATING INFORMATION FOR
 THE GLASS BLOCK IF INSTALLED 0'-3' FROM
 THE PROPERTY LINE.
  
 5.)THE FLORIDA STATE PRODUCT APPROVAL
 SUBMITTED FOR THE "A & P CUSTOM WINDOW"
 (FIXED) IS PENDING.PROVIDE A CURRENT,
 APPROVED STATE OR LOCAL PRODUCT
 APPROVAL.
  
 6.)THE FASTENING FOR SOME OF THE
 CONNECTORS ON A5.1 CONFLICTS WITH THE
 PRODUCT APPROVAL.FASTENING MUST BE
 CONSISTENT WITH THE PAPERWORK ON THE
 STATE WEBSITE (WWW.FLORIDABUILDING.ORG)
 OR APPLY FOR A LOCAL PRODUCT APPROVAL.
 PLEASE FEEL FREE TO CONTACT ME IF YOU
 HAVE ANY QUESTIONS OR NEED ASSISTANCE.
  
 REGARDING TRUSS ENGINEERING PACKAGE
 (SPACE COAST TRUSS, INC.), SIGNED BY
 STEPHEN WARTER, PE:
  
 7.)NONCONCURRENT 10# LL FOR BOTTOM
 CHORD OF TRUSSES CANNOT BE USED (MUST BE
 CONCURRENT). NOTE 2 REFERS TO UBC94;
 GOVERNING CODE IS FBC2001.
  
 8.)THE TRUSS ENGINEERING (MITEK
 SOFTWARE) INCLUDES A 1.25 INCREASE FOR
 PLATES.THIS INCLUDES A STRESS INCREASE
 FOR STEEL WHICH IS NOT CODE COMPLIANT
 FBC1609.4.3(2).
  
 9.)PLEASE REVIEW OTHER TRUSS PACKAGES
 WHICH YOU MAY HAVE SUBMITTED ON OTHER
 PROJECTS IN THE CITY AND ARE
 NONCOMPLIANT, AND SUBMIT NEW ENGINEERING
 WHICH IS CODE COMPLIANT.
  
 10.)EITHER ALL SHEETS MUST BE SIGNED
 AND SEALED FOR THE TRUSS ENGINEERING OR
 AN INDEX SHEET IN COMPLIANCE WITH
 FAC61G15-31.003(5)(A) THROUGH (E).
  
 11.)THE SIGNATURE IS TO BE AN
 ORIGINAL,
 NOT A PHOTOCOPY, REQUIRES A DATE.TITLE
 BLOCK ALSO REQUIRED, FAC61G15-23.002.
  
 12.)TRUSS PLACEMENT IS TO BE SEALED BY
 THE TRUSS SYSTEM ENGINEER,
 FAC61G15-31.003(4).
  
  

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2006-01-25 Cont ID  
Sent By btrobaug Date 2006-01-25 Time 17:42 Rev Time 0.50
Received By btrobaug Date 2006-01-25 Time 17:01 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2006-01-21 Cont ID  
Sent By jleahy Date 2006-01-21 Time 08:22 Rev Time 0.30
Received By jleahy Date 2006-01-21 Time 08:22 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2005-12-19 Cont ID  
Sent By btrobaug Date 2005-12-19 Time 12:17 Rev Time 0.50
Received By btrobaug Date 2005-12-19 Time 12:16 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2005-03-04 Cont ID  
Sent By btrobaug Date 2005-03-04 Time 11:48 Rev Time 0.50
Received By btrobaug Date 2005-03-04 Time 08:19 Sent To M
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2005-03-18 Cont ID  
Sent By gsalfeld Date 2005-03-18 Time 10:17 Rev Time 1.00
Received By gsalfeld Date 2005-03-18 Time 10:17 Sent To  
Notes
2005-03-18 00:00:00REVIEW UNDER 05030368

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2006-01-13 Cont ID  
Sent By adarroug Date 2006-01-13 Time 10:48 Rev Time 0.00
Received By adarroug Date 2006-01-13 Time 10:48 Sent To E
Notes
2006-01-13 00:00:00TO "BTROBAUG" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2005-12-14 Cont ID  
Sent By adarroug Date 2005-12-14 Time 16:32 Rev Time 0.00
Received By adarroug Date 2005-12-14 Time 16:32 Sent To E
Notes
2005-12-14 00:00:00TO "BTROBAUG" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-04-18 Cont ID  
Sent By adarroug Date 2005-04-18 Time 16:07 Rev Time 0.00
Received By adarroug Date 2005-04-18 Time 16:07 Sent To B
Notes
2005-04-18 00:00:00TO "SHILL" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-04-12 Cont ID  
Sent By adarroug Date 2005-04-12 Time 16:46 Rev Time 0.00
Received By adarroug Date 2005-04-12 Time 16:45 Sent To Z
Notes
2005-04-12 00:00:00TO "Z" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-03-02 Cont ID  
Sent By adarroug Date 2005-03-18 Time 14:35 Rev Time 0.00
Received By shill Date 2005-03-02 Time 11:01 Sent To PC
Notes
2005-03-02 00:00:00TO "E" BOX/SFR

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-02-24 Cont ID  
Sent By mjacobs Date 2005-03-18 Time 09:41 Rev Time 0.00
Received By shill Date 2005-02-24 Time 09:41 Sent To  
Notes
2005-02-24 00:00:00TO "Z" BOX.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2005-03-14 Cont ID  
Sent By pkrauss Date 2005-03-14 Time 15:15 Rev Time 0.20
Received By pkrauss Date 2005-03-14 Time 15:15 Sent To B
Notes
2005-03-14 00:00:00COPY OF A/C DWG FAXED AND APPROVED
 3-6-05.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2005-03-07 Cont ID  
Sent By pkrauss Date 2005-03-07 Time 19:54 Rev Time 0.35
Received By pkrauss Date 2005-03-07 Time 19:53 Sent To P
Notes
2005-03-07 00:00:00DENIED:
 ONLY ONE MECHANICAL PLAN SUBMITTED FOR
 REVIEW.CALL CONTRACTOR FOR ADDITIONAL
 COPY.
  
 PLAN IS CODE COMPLIANT.
  
 IF YOU HVAE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561)805-6719.

Review Stop P PLUMBING
Rev No 2 Status N Date 2005-03-18 Cont ID  
Sent By gsalfeld Date 2005-03-18 Time 14:45 Rev Time 0.00
Received By gsalfeld Date   Time   Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2005-03-12 Cont ID  
Sent By kstevens Date 2005-03-12 Time 15:02 Rev Time 0.50
Received By kstevens Date 2005-03-12 Time 15:02 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2005-04-18 Cont ID  
Sent By mmclean Date 2005-04-18 Time 14:53 Rev Time 0.00
Received By mmclean Date 2005-04-18 Time 14:53 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2005-03-01 Cont ID  
Sent By mmclean Date 2005-03-01 Time 16:49 Rev Time 0.00
Received By mmclean Date 2005-03-01 Time 16:49 Sent To I
Notes
2005-03-01 00:00:00DENIED,
 1. SURVEY & SITEPLAN DOES NOT MATCH
 (SETBACKS).MUST PROVIDE THE CORRECT
 LAYOUT OF HOUSE ON PROPERTY WITH
 SETBACKS.CALLED CONTRACTOR
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved