| Plan Review Stops For Permit 05021049 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
N |
Date |
2005-02-17 |
|
|
Cont ID |
|
| Sent By |
ptjomsto |
Date |
2005-02-17 |
Time |
14:25 |
Rev Time |
0.00 |
| Received By |
ptjomsto |
Date |
2005-02-17 |
Time |
14:25 |
Sent To |
|
|
| Notes |
| 2005-02-17 00:00:00 | REQUIRES EXTENSION FOR 1730 MISSION | | | COURT |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2006-06-28 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2006-06-28 |
Time |
15:20 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2006-06-28 |
Time |
15:20 |
Sent To |
|
|
| Notes |
| 2006-06-28 00:00:00 | PAGES S1 AND S2 OF MASTERED PLANS WERE | | | MISTAKENLY SUBMITTED FOR RESTAMP UNDER | | | PERMITS 05060411, 05060414 AND 05060416. | | | THEY WERE RESTAMPED UNDER THE MASTER | | | # 05021049. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2005-05-11 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2005-05-11 |
Time |
12:58 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2005-05-11 |
Time |
12:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2005-03-07 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2005-03-07 |
Time |
14:53 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2005-03-07 |
Time |
14:53 |
Sent To |
Z |
|
| Notes |
| 2005-03-07 00:00:00 | DENIED | | | | | | 1) SUBMIT COMPLETE STATE PRODUCT | | | APPROVAL WITH TEST REPORTS, LIMITATIONS | | | AND INSTALLATION INSTRUCTIONS AND | | | DRAWINGS FOR THE ASPHALT SHINGLES. MEAN | | | ROOF HEIGHT IS LESS THAN 33 FEET, | | | THEREFORE, MIAMI-DADE NOA IS ACCEPTABLE. | | | | | | 2) ASTM C 926 REQUIRES PORTLAND CEMENT | | | PLASTER TO BE 5/8" THICK WHEN APPLIED | | | HORIZONTALLY OVER METAL PLASTER BASE. | | | PLEASE REVISE THE SOFFIT DETAILS ON A-2. | | | | | | 3) THE CITY OF WPB AMENDMENTS TO FBC | | | TABLE 2306.1 REQUIRES THE ROOF SHEATHING | | | TO BE NAILED AT 4" O.C. AT THE EDGES AND | | | 6"O.C. INTERMEDIATE IN ZONE 3, WHICH IS | | | THE OUTSIDE CORNERS ON HIP ROOFS. | | | | | | 4) THE UPLIFTS AND GRAVITY LOADS | | | SPECIFIED ON S1 FOR TRUSSES S2 AND HGS | | | ARE LESS THAN THOSE LISTED ON THE TRUSS | | | DRAWINGS. PLEASE CORRECT. | | | | | | 5) SUBMIT SITE PLANS INDICATING THE | | | LOCATION OF THE STRUCTURE. | | | | | | 6) FBC 11-4.2.6 REQUIRES THE SIDE REACH | | | OF A PERSON IN A WHEEL CHAIR USING A | | | PARALLEL APPROACH TO BE 54" FOR THE | | | MAXIMUM HIGH SIDE REACH AND THE LOW SIDE | | | REACH SHALL BE NO LESS THAN 9" ABOVE THE | | | FLOOR. SHOW COMPLIANCE OF MAIL BOX | | | UNITS. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
N |
Date |
2005-03-07 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2005-03-07 |
Time |
14:50 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2005-03-07 |
Time |
14:49 |
Sent To |
|
|
| Notes |
| 2005-03-07 00:00:00 | NO ELECTRIC ON PLANS |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
N |
Date |
2005-03-07 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2005-03-07 |
Time |
14:52 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2005-03-07 |
Time |
14:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
N |
Date |
2005-03-07 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2005-03-07 |
Time |
14:53 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2005-03-07 |
Time |
14:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2005-04-18 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-04-18 |
Time |
10:21 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-04-18 |
Time |
10:21 |
Sent To |
B |
|
| Notes |
| 2005-04-18 00:00:00 | TO "RMCDOUGAL" DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2005-02-24 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-02-24 |
Time |
11:27 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-02-24 |
Time |
11:27 |
Sent To |
B |
|
| Notes |
| 2005-02-24 00:00:00 | TO "RMCDOUGAL" DESK/ | | | ERIC OUT, ZONING TO REVIEW IT LAST. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2005-02-22 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-02-22 |
Time |
12:44 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-02-22 |
Time |
12:44 |
Sent To |
Z |
|
| Notes |
| 2005-02-22 00:00:00 | TO "Z" BOX |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
N |
Date |
2005-03-07 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2005-03-07 |
Time |
14:51 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2005-03-07 |
Time |
14:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2005-03-07 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2005-03-07 |
Time |
14:51 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2005-03-07 |
Time |
14:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2005-03-11 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2005-03-11 |
Time |
14:50 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2005-03-11 |
Time |
14:35 |
Sent To |
|
|
| Notes |
| 2005-02-23 00:00:00 | ERIC IS OUT.ZONING TO REVIEW LAST. | | | RETURNED TO INCOMING. |
|
|