Plan Review Details - Permit 05020746
Plan Review Stops For Permit 05020746
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2005-05-02 Cont ID  
Sent By rmcdouga Date 2005-05-02 Time 08:23 Rev Time 0.00
Received By rmcdouga Date 2005-05-02 Time 07:35 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-04-01 Cont ID  
Sent By rmcdouga Date 2005-04-01 Time 09:45 Rev Time 0.00
Received By rmcdouga Date 2005-04-01 Time 06:36 Sent To  
Notes
2005-04-01 00:00:00DENIED
  
 1) THE ENERGY CALC. FORMS ARE INCORRECT.
 THEY DO NOT LIST THE 2X6 WOOD FRAME
 EXTERIOR WALLS AND LIST R19 IN THE
 CEILINGS, NOT R30 AS SPECIFIED ON THE
 PLANS.
  
 2) THE CONNECTOR SCHEDULE SCHEDULE LISTS
 A SIMPSON HDSA ANCHOR TYPE. IS THIS
 SUPPOSE TO BE A HD5A? INDICATE HOW THE
 UPLIFT VALUE WAS DETERMINED.
  
 3) ROOF TRUSS MG1 HAS AN UPLIFT THAT
 EXCEEDS THE CAPACITY OF THE SIMPSON H10
 THAT IS SPECIFIED FOR IT.
  
 4) ROOF GIRDER TRUSS GR3 IS INDICATED AS
 A 2 MEMBER TRUSS ON THE TRUSS LAYOUT AND
 THE PLANS SPECIFY A 4 MEMBER TRUSS AT
 THIS LOCATION.
  
 5) SPECIFY THE MECHINICAL CONNECTIONS
 FOR ROOF TRUSSES GR2 AND GR3 AT THE
 INTERIOR MASONRY WALLS.
  
 6) SUBMIT THE INSTALLATION INSTRUCTIONS
 FOR THE ROOF SHINGLES.
  
 7) SUBMIT THE NOA FOR THE GLASS BLOCK,
 WHICH CONTAINS THE INSTALLATION
 INSTRUCTIONS.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2005-02-24 Cont ID  
Sent By dpalmer Date 2005-02-24 Time 17:52 Rev Time 0.30
Received By dpalmer Date 2005-02-24 Time 17:52 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2005-02-14 Cont ID  
Sent By mamini Date 2005-02-14 Time 11:33 Rev Time 0.50
Received By mamini Date 2005-02-14 Time 11:33 Sent To  
Notes
2005-02-14 00:00:00PASSED:
  
 1. SEE PERMIT # 03101412 FOR UNDERGROUND
 UTILITIES AND SITE WORK.
 IF ANY QUESTION PLEASE CONTACT 805-6723
 MOHAMMAD R. AMINI

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2005-04-01 Cont ID  
Sent By rmcdouga Date 2005-04-01 Time 07:47 Rev Time 0.00
Received By rmcdouga Date 2005-03-25 Time 13:13 Sent To  
Notes
2005-04-01 00:00:00OK PER NATE MCCRAY 3/25/05

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-04-27 Cont ID  
Sent By adarroug Date 2005-04-27 Time 11:19 Rev Time 0.00
Received By adarroug Date 2005-04-27 Time 11:19 Sent To B
Notes
2005-04-27 00:00:00TO "RMCDOUGAL" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-04-06 Cont ID  
Sent By adarroug Date 2005-04-06 Time 14:30 Rev Time 0.00
Received By adarroug Date 2005-04-06 Time 14:30 Sent To B
Notes
2005-04-06 00:00:00TO "RMCDOUGAL" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-02-14 Cont ID  
Sent By adarroug Date 2005-02-14 Time 10:53 Rev Time 0.00
Received By adarroug Date 2005-02-14 Time 10:53 Sent To  
Notes
2005-02-14 00:00:00TO "COMM" BD #62

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2005-04-01 Cont ID  
Sent By hmoser Date 2005-04-01 Time   Rev Time 0.00
Received By hmoser Date 2005-04-01 Time 14:41 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2005-03-11 Cont ID  
Sent By kstevens Date 2005-03-11 Time 14:30 Rev Time 0.50
Received By kstevens Date 2005-03-11 Time 14:30 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2005-02-14 Cont ID  
Sent By eschneid Date 2005-02-14 Time 15:00 Rev Time 0.20
Received By eschneid Date 2005-02-14 Time 14:48 Sent To  
Notes
***NONE***