Plan Review Details - Permit 05020222
Plan Review Stops For Permit 05020222
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2005-05-06 Cont ID  
Sent By rmcdouga Date 2005-05-06 Time 07:05 Rev Time 0.00
Received By rmcdouga Date 2005-05-06 Time 07:05 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-04-06 Cont ID  
Sent By rmcdouga Date 2005-04-06 Time 10:55 Rev Time 0.00
Received By rmcdouga Date 2005-04-04 Time 07:18 Sent To  
Notes
2005-04-06 00:00:00DENIED
  
 1) OWNER/AGENT IS REQUIRED TO SIGN THE
 ENERGY CALC FORMS.
  
 2) THE ENERGY CALCS. DO NOT LIST THE 2X6
 WOOD FRAME EXTERIOR WALLS. THE R-VALUE
 FOR THE CEILING INSULATION LISTED ON THE
 ENERGY CALC. FORMS DOES NOT MATCH THE
 PLANS.
  
 3) THE HEADING FOR THE AREA TABULATION
 ON SHEET T-1 INCORRECTLY STATES 8 UNIT
 BUILDING.
  
 4) SPECIFY THE MECHANICAL CONNECTORS FOR
 THE FL 36 FLOOR TRUSSES AND THE GF1 &
 GF2 ROOF TRUSSES.
  
 5) THE ANCHOR SCHEDULE LISTS A SIMPSON
 HDSA CONNECTOR. IS THIS A TYPO FOR A
 HD5A CONNECTOR? HOW WAS THE MAXIMUM
 UPLIFT OF 8310# DETERMINED FOR THIS
 CONNECTOR.
  
 6) THE UPLIFT IN THE TRUSS DRAWINGS
 EXCEEDS THE CAPACITY OF THE SPECIFIED
 CONNECTORS FOR THE MG1 TRUSSES.
  
 7) SPECIFY THE CONNECTORS FOR EACH END
 OF THE GR2 TRUSSES AND THE CONNECTOR FOR
 THE GR3 AT THE INTERIOR WALL.
  
 8) THE GR3 TRUSS IS INDICATED AS A TWO
 PLY TRUSS ON THE TRUSS DRAWINGS AND A
 FOUR PLY TRUSS ON S4 OF THE PLANS.
  
 9) SUBMIT THE NOA (INSTALLATION
 INSTRUCTIONS) FOR THE ONE HOUR FIRE
 RATED GLASS BLOCK.
  
 10) SUBMIT THE INSTALLATION INSTRUCTIONS
 FOR THE ASPHALT SHINGLES.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2005-02-09 Cont ID  
Sent By dpalmer Date 2005-02-09 Time 19:16 Rev Time 0.33
Received By dpalmer Date 2005-02-09 Time 19:04 Sent To  
Notes
2005-02-09 00:00:00ELECTRICAL PLANS OK, STAMPED ALL THREE
 SETS.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2005-02-07 Cont ID  
Sent By mamini Date 2005-02-07 Time 09:33 Rev Time 0.50
Received By mamini Date 2005-02-07 Time 09:33 Sent To  
Notes
2005-02-07 00:00:00PASSED:
  
 1. SEE PERMIT # 03101412 FOR
 UNDERGROUND UTILITIES AND SITE WORK.
  
 IF ANY QUESTION PLEASE CONTACT 805-6723
 MOHAMMAD R. AMINI

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2005-03-25 Cont ID  
Sent By nmccray Date 2005-03-25 Time 13:04 Rev Time 0.00
Received By nmccray Date 2005-03-25 Time 11:27 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-04-20 Cont ID  
Sent By adarroug Date 2005-04-20 Time 10:55 Rev Time 0.00
Received By adarroug Date 2005-04-20 Time 10:55 Sent To B
Notes
2005-04-20 00:00:00TO "RMCDOUGAL" DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-02-04 Cont ID  
Sent By adarroug Date 2005-02-04 Time 15:24 Rev Time 0.00
Received By adarroug Date 2005-02-04 Time 15:24 Sent To  
Notes
2005-02-04 00:00:00TO "COMM" BD#39/COMM SHELF

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2005-03-11 Cont ID  
Sent By pkrauss Date 2005-03-11 Time 06:59 Rev Time 0.55
Received By pkrauss Date 2005-03-11 Time 06:59 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2005-03-03 Cont ID  
Sent By kstevens Date 2005-03-03 Time 18:53 Rev Time 0.52
Received By kstevens Date 2005-03-03 Time 18:53 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2005-02-14 Cont ID  
Sent By eschneid Date 2005-02-14 Time 14:12 Rev Time 0.20
Received By eschneid Date 2005-02-14 Time 14:00 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved