| Plan Review Stops For Permit 05011505 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
6 |
Status |
P |
Date |
2006-01-25 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2006-01-25 |
Time |
17:42 |
Rev Time |
0.33 |
| Received By |
jgomez |
Date |
2006-01-25 |
Time |
17:42 |
Sent To |
PC |
|
| Notes |
| 2006-01-25 00:00:00 | INTERIOR BEARING WALL REVISION. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
P |
Date |
2005-12-30 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2005-12-30 |
Time |
16:13 |
Rev Time |
75.00 |
| Received By |
jgomez |
Date |
2005-12-30 |
Time |
16:13 |
Sent To |
PC |
|
| Notes |
| 2005-12-30 00:00:00 | BUILDING REVISION SIGNED AND SEALED ON | | | 12-14-05. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2005-08-17 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2005-08-17 |
Time |
17:53 |
Rev Time |
0.50 |
| Received By |
jgomez |
Date |
2005-08-17 |
Time |
17:53 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2005-07-22 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2005-07-20 |
Time |
10:27 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2005-07-22 |
Time |
12:14 |
Sent To |
|
|
| Notes |
| 2005-07-01 00:00:00 | DENIED | | | | | | 1) PROVIDE FLORIDA OR LOCAL PRODUCT | | | APPROVAL FOR SIMPSON HETAL 20 AND LUS | | | 210 CONNECTORS. | | | | | | 2) THE TWO HETAL-20 CONNECTORS HAVE A | | | UPLIFT CAPACITY OF 2500#. THE UPLIFT | | | LISTED IN THE SCHEDULE ON A7, FOR GRF IS | | | 4596# AND GRA IS 2782# WHICH EXCEED THE | | | CAPACITY OF THE CONNECTORS. PLEASE | | | CORRECT. | | | | | | 3) GIRDER TRUSSES GRE AND GRC SPECIFIED | | | ON THE SECOND FLOOR FRAMING PLAN ARE NOT | | | LISTED IN THE SCHEDULE ON A7. | | | | | | 4) FBC 1707.4.4.2 REQUIRES WINDOW AND | | | AND DOOR ASSEMBLIES TO BE FASTENED | | | THROUGH 1X BUCKS INTO THE STRUCTURAL | | | SUBSTRATE. THE NOTES ON THE BUCK DETAILS | | | ON A11 SPECIFY ATTACHMENT TO THE 1X | | | BUCKS. PLEASE CORRECT. | | | | | | 5) PROVIDE DETAILS FOR THE BALCONY AND | | | STAIR GUARDRAILS SHOWING COMPLIANCE WITH | | | FBC 1015 AND 1608.2. | | | | | | 6) THE TYPICAL STAIR DETAIL ON SHEET A10 | | | DOESN'T MATCH STAIRS SHOWN ON PLANS. THE | | | UPPER STAIR IS MISSING ONE STEP. THE | | | NUMBER OF RISERS AND TREADS IS NOT | | | CONSISTENT. PLEASE CORRECT. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2005-06-03 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2005-06-03 |
Time |
10:06 |
Rev Time |
2.50 |
| Received By |
jgomez |
Date |
2005-06-03 |
Time |
10:06 |
Sent To |
PC |
|
| Notes |
| 2005-06-03 00:00:00 | BUILDING REVIEW CHECKLIST: | | | | | | 1- PROVIDE STRUCTURAL BUCK DETAILS FOR | | | SWING DOOR AT GARAGE. SEE PRODUCT | | | APPROVAL FOR SIZE REQUIRED. | | | **NOTE: IT'S THE DESIGNER OF RECORD THE | | | ONE WHO PROVIDES THIS INFORMATION NOT | | | THE PRODUCT APPROVAL. SECTION 104.2.1.2 | | | CITY AMENDMENTS TO FBC 2001 AND SECTION | | | 1707.4.4.2 FBC 2001. | | | | | | 2- SECTION 1/A6 IS INCOMPLETE. IS | | | MISSING 2ND FLOOR FRAMING ON THE OTHER | | | SIDE OF THE WALL. SEC. 104.2.1.2 CITY | | | AMENDMENTS TO FBC 2001. | | | | | | 3- A) PROVIDE UPLIFT CALCULATIONS FOR | | | ROOF TRUSSES TO CLARIFYWHY UPLIFT | | | CALCULATIONS SHOWN ON PLANS ARE THE SAME | | | FOR THE FIRST STORY ROOF AS THE ONES FOR | | | THE SECOND STORY ROOF. SECTION 104.2.1.2 | | | CITY AMENDMENTS TO FBC 2001. | | | | | | B) CLARIFY WHY USING CONNECTORS ON | | | SECOND FLOOR ROOF THAT DON'T PROVIDE | | | RESISTANCE FOR LATERAL LOADS. SECTION | | | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. | | | | | | C) CLARIFY WHY USING STRONGER CONNECTORS | | | FOR ROOF AT FIRST FLOOR THAN AT SECOND | | | FLOOR ROOF. SEC. 104.2.1.2 CITY | | | AMENDMENTS TO FBC 2001. | | | | | | 4- SHEET A6: UNABLE TO FIND SIMPSON | | | LUSC212 AND LUS212 CONNECTORS IN THE | | | SIMPSON CATALOGUE. WHERE WERE THEY TAKEN | | | FROM? PROVIDE COMPLETE CONNECTOR | | | INFORMATION AND PRODUCT APPROVAL. SEC. | | | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. | | | | | | 5- PROVIDE FLORIDA OR LOCAL PRODUCT | | | APPROVAL FOR: A) USP CONNECTORS | | | SPECIFIED ON PLANS. | | | | | | B) GARAGE DOORS. DRAWINGS SUBMITTED ARE | | | NOT LEGIBLE. | | | | | | 6-A) ON FIRST SUBMITTAL PACKAGE THERE | | | WAS A PRODUCT APPROVAL FOR RAILING | | | SYSTEM TO BE USED IN THE HOUSE. IT WAS | | | NOT GOOD BECAUSE IT WAS TO BE ANCHORED | | | TO CONCRETE SLAB. NOW, THERE IS NO | | | SUBMITTAL FOR RAILINGS NOW. | | | PROVIDE COMPLETE SPECS AND DETAILS FOR | | | CONSTRUCTION OF RAILING SYSTEMS. SPECIFY | | | ALL CONNECTORS, ETC. DESIGN TO COMPLY | | | WITH SEC. 1608.2 FBC 2001. | | | | | | B) TYPICAL STAIR DETAIL ON SHEET A10 | | | DOESN'T MATCH STAIRS SHOWN ON PLANS. | | | LOOK AT FIRST AND LAST STEP. ALSO, NEED | | | TO SPECIFY ALL FRAMING CONNECTORS FOR | | | POSTS ETC. | | | AND, REVISE CONNECTOR TO BE ATTACHED TO | | | MASONRY. NEED TO SPECIFY MASONRY | | | CONNECTOR. SEC. 104.2.1.2 CITY | | | AMENDMENTS TO FBC 2001. | | | | | | 7- SECTIONS SHOWN ON SHEET A11 DON'T | | | APPLY TO THIS PROJECT. PROVIDE SECTIONS | | | THAT APPLY. SEC. 104.2.1.2 CITY | | | AMENDMENTS TO FBC 2001. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CALL | | | JULIO GOMEZ AT (561)805-6712. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2005-02-18 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2005-02-18 |
Time |
16:47 |
Rev Time |
3.00 |
| Received By |
jgomez |
Date |
2005-02-18 |
Time |
16:47 |
Sent To |
|
|
| Notes |
| 2005-02-18 00:00:00 | BUILDING REVIEW CHECKLIST: | | | 1- WHEN APPLYING FOR BUILDING PERMIT, | | | PLEASE PAY IMPACT FEES AND BRING BACK | | | STAMPED DRAWINGS AND PAID RECEIPT. | | | ALSO, PROVIDE COPY OF RECORDED NOTICE OF | | | COMMENCEMENT. | | | | | | 2- CLARIFY IF USING IMPACT GLAZING OR | | | STORM SHUTTERS. BOTH PACKAGES WERE | | | SUBMITTED. IF USING STORM SHUTTERS, | | | THEN, PROVIDE COMPLETE INFORMATION. | | | | | | 3- REVISE HANDRAIL HEIGHT SHOWN ON STAIR | | | DETAIL. SHEET A10. HANDRAIL NEED TO BE | | | BETWEEN 34" AND 38" (NOT 42"). SECTION | | | 1007.5.1 FBC 2001 EXCEPTION #3. | | | **NOTE: GUARDRAIL AND HANDRAIL ARE NOT | | | THE SAME. | | | | | | 4-SPECIFY ROOF TILE FASTENING AS REQ'D | | | BY SEC. 104.2.1.1 CITY AMENDMENTS TO FBC | | | | | | 5- GARAGE DOOR SIZE SPECIFIED ON DOOR | | | SCHEDULE IS NOT THE SAME AS SHOWN ON | | | ELEVATIONS. REVISE AS REQUIRED. | | | | | | 6- PROVIDE SURVEY WITH LAYOUT THAT | | | MATCHES PLANS SUBMITTED. | | | | | | 7- OWNER/AGENT NEEDS TO SIGN AND DATE | | | THE ENERGY CALCULATIONS FORM. | | | | | | 8- PROVIDE SOIL TEST REPORT. | | | | | | 9- PROVIDE STRUCTURAL BUCK DETAILS FOR | | | SWING AND SLIDING GLASS DOORS. (SEE | | | PRODUCT APPROVAL FOR SIZE OF BUCK REQ'D) | | | SECTION 104.2.1.2 SECTION 104.2.1.2 OF | | | CITY AMENDMENTS TO FBC 2001 AND SECTION | | | 1707.4.4.2 FBC 2001. | | | | | | 10- SPECIFY DRAFSTOPPING MATERIALS AND | | | LOCATION ON 2ND FLOOR FRAMING PLAN AS | | | REQUIRED BY SEC. 2305.2.2(1) FBC 2001. | | | | | | 11- PLEASE, PROVIDE ONLY THE DETAILS | | | THAT APPLY TO THIS PROJECT TO EXPEDITE | | | AND CLARIFY REVIEW PROCESS. | | | | | | 12- PROVIDE COMPLETE WALL SECTION/DETAIL | | | AT EAST WALL SHOWING HOW ARE ROOF | | | TRUSSES STRUCTURALLY SUPPORTED ON | | | LEDGER. SPECIFY ALL FASTENERS. SECTION | | | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. | | | | | | 13- PROVIDE UPLIFT CALCULATIONS FOR ROOF | | | TRUSSES(INCLUDING LATERAL FORCES) AND | | | EXPLAIN WHY USING CONNECTORS ON 2ND | | | FLOOR ROOF TRUSSESTHAT DON'T | | | PROVIDE RESISTANCE TO LATERAL FORCES. | | | (*NOTE: IT'S THE DESIGNER OF RECORD | | | RESPONSIBILITY TO CALCULATE THE LOADS | | | NOT THE TRUSS ENGINEER*. REVISE NOTES ON | | | SHEETS A6 AND A7). | | | | | | 14- PROVIDE SMOKE DETECTOR IN FIRST FL. | | | CLOSE TO THE STAIRS AS REQ'D BY SECTION | | | 905.2.2 FBC 2001. | | | | | | 15- PROVIDE FLORIDA OR LOCAL PRODUCT | | | APPROVAL FOR: A) DOUBLE ENTRY DOORS AS | | | SHOWN ON PLANS. | | | B) 8'-0" HIGH SWING DOORS AS SHOWN ON | | | PLANS (NOT 7'-0"HIGH AS SUBMITTED) | | | C) RAILING SYSTEM TO BE INSTALLED IN | | | FRAMED FLOORS, NOT CONCRETE SLAB. | | | PROVIDE COMPLETE DETAILS FOR WOOD FRAMED | | | | | | FLOORS AS SHOWN ON PLANS. | | | D) GARAGE DOOR INCLUDING DRAWINGS OF | | | MODEL TO BE INSTALLED. | | | E) FIXED WINDOWS. | | | | | | 16- SHEET A1: A) REVISE DETAIL F1. NEED | | | FOOTING TO BE 12 MIN. BELOW GRADE (NOT | | | 8"). SEC. 1804.1.3 FBC 2001. | | | B) SPECIFY REQUIRED DEPTH BELOW GRADE | | | ON DETAIL F3. SEC. 104.2.1.2 CITY | | | AMENDMENTS TO FBC 2001. | | | | | | 17- SHEET A6: BUCKETS SPECIFIED FOR | | | BALCONY CONSTRUCTION ARE WOOD TO WOOD | | | JOIST HANGERS. NEED BUCKET WITH | | | SPECIFICATIONS TO BE INSTALLED ON | | | CONCRETE BLOCK WALL. (ALSO, WHERE ARE | | | LUSC 212-3 CONNECTORS ON SIMPSON | | | CATALOGUE?) | | | SEC. 104.2.1.2 CITY AMENDMENTS TO FBC. | | | | | | 18- SHEET A7: SPECIFY CONNECTORS FOR | | | HAND FRAMED HIPS AND VALLEY RAFTERS. | | | SECTION 104.2.1.2 CITY AMENDMENTS TO FBC | | | | | | 19- DETAILS/SECTIONS ON SHEET A11 DON'T | | | APPLY TO THIS PROJECT. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CALL | | | JULIO GOMEZ AT (561)805-6712. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
6 |
Status |
P |
Date |
2006-05-08 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2006-05-08 |
Time |
07:44 |
Rev Time |
0.75 |
| Received By |
btrobaug |
Date |
2006-05-08 |
Time |
06:41 |
Sent To |
PC |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
5 |
Status |
P |
Date |
2005-12-19 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2005-12-19 |
Time |
11:06 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2005-12-19 |
Time |
07:34 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2005-08-03 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2005-08-03 |
Time |
17:57 |
Rev Time |
0.33 |
| Received By |
btrobaug |
Date |
2005-08-03 |
Time |
17:24 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2005-07-22 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2005-07-22 |
Time |
12:21 |
Rev Time |
0.33 |
| Received By |
btrobaug |
Date |
2005-07-22 |
Time |
12:16 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2005-05-11 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2005-05-11 |
Time |
13:19 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2005-05-11 |
Time |
13:13 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2005-02-08 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2005-02-08 |
Time |
15:00 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2005-02-07 |
Time |
15:28 |
Sent To |
M |
|
| Notes |
| 2005-02-08 00:00:00 | | | | | | | PLEASE MAKE THE FOLLOWING CORRECTIONS | | | FOR CODE COMPLIANCE AND RESUBMIT FOR | | | REVIEW. | | | | | | 1} PANEL "B" IS SHOWN AS MLO IN THE | | | NOTES, HAS NO OCP IN METER MAIN, AND NO | | | APPEARANT DISCONNECTING MEANS PER | | | 225.32. | | | | | | 2} THERE ARE 75 RECESSED LIGHTS IN THE | | | LOAD CALCS, BUT ONLY 24 ON PLANS. PLEASE | | | CORRELATE. | | | | | | 3} ELECTRIC WATER HEATER IS SHOWN ON THE | | | PLAN, DOES NOT APPEAR ON THE PANEL | | | SCHEDULE. ALSO CALCULATE PER 442.13. | | | | | | 4} A SMOKE DETECTOR IS REQUIRED PER | | | 8-1.4.1.6.2 NFPA-72, OUTSIDE SLEEPING | | | AREA, "IMMEDIATE VICINITY". | | | | | | 5} ISLAND RECEPTACLES REQUIRED TO BE GFI | | | PER 210.8(A)(6). | | | | | | IF THERE ARE ANY QUESTIONS PLEASE CALL. | | | | | | BILL TROBAUGH | | | ELECTRICAL PLAN REVIEW | | | 561/805-6718 | | | [email protected] | | | FAX/:561/659-8026 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
10 |
Status |
N |
Date |
2006-05-06 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2006-05-06 |
Time |
15:09 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2006-05-06 |
Time |
15:09 |
Sent To |
E |
|
| Notes |
| 2006-05-06 00:00:00 | TO "BTROBAUG" DESK/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
9 |
Status |
N |
Date |
2006-01-22 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2006-01-22 |
Time |
11:18 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2006-01-22 |
Time |
11:18 |
Sent To |
B |
|
| Notes |
| 2006-01-22 00:00:00 | TO "JGOMEZ" DESK/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
8 |
Status |
N |
Date |
2005-12-16 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-12-16 |
Time |
16:23 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-12-16 |
Time |
16:23 |
Sent To |
E |
|
| Notes |
| 2005-12-16 00:00:00 | TO "BTROBAUG" DESK/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
7 |
Status |
N |
Date |
2005-12-13 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-12-13 |
Time |
10:43 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-12-13 |
Time |
10:43 |
Sent To |
M |
|
| Notes |
| 2005-12-13 00:00:00 | TO "M" BOX/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
2005-08-03 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-08-03 |
Time |
12:57 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-08-03 |
Time |
12:57 |
Sent To |
E |
|
| Notes |
| 2005-08-03 00:00:00 | TO "BTROBAUG" DESK/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2005-07-08 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-07-08 |
Time |
16:17 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-07-08 |
Time |
16:17 |
Sent To |
M |
|
| Notes |
| 2005-07-08 00:00:00 | TO "M" BOX/RESUB |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2005-06-24 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-06-24 |
Time |
13:30 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-06-24 |
Time |
13:30 |
Sent To |
M |
|
| Notes |
| 2005-06-24 00:00:00 | TO "M" BOX/RESUB |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2005-05-10 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-05-10 |
Time |
10:01 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-05-10 |
Time |
10:01 |
Sent To |
E |
|
| Notes |
| 2005-05-10 00:00:00 | TO "BTROBAUG" DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2005-02-04 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-02-04 |
Time |
15:56 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-02-04 |
Time |
15:56 |
Sent To |
E |
|
| Notes |
| 2005-02-04 00:00:00 | TO "E"/ SF RACK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2005-01-31 |
|
|
Cont ID |
|
| Sent By |
mjacobs |
Date |
2005-01-31 |
Time |
09:12 |
Rev Time |
0.00 |
| Received By |
mjacobs |
Date |
2005-01-31 |
Time |
13:06 |
Sent To |
Z |
|
| Notes |
| 2005-01-31 00:00:00 | TO "Z" BOX |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
8 |
Status |
N |
Date |
2005-12-20 |
|
|
Cont ID |
|
| Sent By |
tgordon |
Date |
2005-12-20 |
Time |
08:42 |
Rev Time |
0.20 |
| Received By |
tgordon |
Date |
2005-12-20 |
Time |
08:42 |
Sent To |
B |
|
| Notes |
| 2005-12-20 00:00:00 | MECH. CONTRACTOR SUBMITTED APPROVED | | | MECH. PLANS. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
7 |
Status |
P |
Date |
2005-12-14 |
|
|
Cont ID |
|
| Sent By |
tgordon |
Date |
2005-12-14 |
Time |
11:32 |
Rev Time |
0.30 |
| Received By |
tgordon |
Date |
2005-12-14 |
Time |
11:32 |
Sent To |
|
|
| Notes |
| 2005-12-14 00:00:00 | MECH. PLANS SUBMITTED BY MECH. | | | CONTRACTOR 12-14-05. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
6 |
Status |
F |
Date |
2005-12-13 |
|
|
Cont ID |
|
| Sent By |
tgordon |
Date |
2005-12-13 |
Time |
15:55 |
Rev Time |
0.30 |
| Received By |
tgordon |
Date |
2005-12-13 |
Time |
15:55 |
Sent To |
|
|
| Notes |
| 2005-12-13 00:00:00 | *** DEINED *** | | | 1) FROM REVIEW ON 7-20-05 MECHANICAL | | | CONTRACTOR NEEDS TO APPLY FOR MECHANICAL | | | PERMIT, OR HAVE YOUR ENGINEER (LUIS A. | | | LOPEZ) MAKE REVISIONS AND SEAL PLANS. | | | SEE ATTACH REVIEW FROM 7-20-05. | | | 2) NEED TO SUBMIT 2 SETS OF PLANS. | | | 3) NEED JOB LOCATION ON PLANS. | | | 4) PLEASE SHOW DRAIN LINES ON PLANS. | | | IF YOU HAVE ANY QUESTIONS PLEASE CALL | | | TOM GORDON 805-6729. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
5 |
Status |
N |
Date |
2005-07-20 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2005-07-20 |
Time |
10:24 |
Rev Time |
0.30 |
| Received By |
pkrauss |
Date |
2005-07-20 |
Time |
10:24 |
Sent To |
B |
|
| Notes |
| 2005-07-20 00:00:00 | PER CONVERSATION WITH GENERAL | | | CONTRACTOR.MECHANICAL CONTRACTOR TO | | | SUBMIT PLANS WITH MECHANICAL PERMIT | | | APPLICATION. | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
4 |
Status |
F |
Date |
2005-07-19 |
|
|
Cont ID |
|
| Sent By |
rregueir |
Date |
2005-07-19 |
Time |
16:50 |
Rev Time |
0.00 |
| Received By |
rregueir |
Date |
2005-07-19 |
Time |
16:50 |
Sent To |
B |
|
| Notes |
| 2005-07-19 00:00:00 | DENIED:4TH REQUEST | | | ---------------------------------------- | | | 1) SPARE BEDROOMS ON 1ST AND 2ND | | | FLOORS (PAGES M1 & M2) SHOW 7" ROUND | | | FLEX DUCTS SERVING CLOSETS TO DELIVER 15 | | | CFM EACH.DUCT IS TOO LARGE FOR THIS | | | APPLICATION.THIS DUCT SIZE WILL ALSO | | | CAUSE R/A TRANSFER DUCTS TO BE | | | UNDERSIZED PER FBC,M 601.4. | | | | | | 2) R/A TRANSFER DUCT IN OFFICE (PAGE M2) | | | TO BE MINIMUM 12" ROUND PER FBC,M 601.4. | | | | | | PLEASE REVISE AND RESUBMIT. | | | | | | RONALD J REGUEIRO | | | 561-805-6734 | | | [email protected] |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
F |
Date |
2005-06-28 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2005-06-28 |
Time |
11:14 |
Rev Time |
0.35 |
| Received By |
pkrauss |
Date |
2005-06-28 |
Time |
09:22 |
Sent To |
|
|
| Notes |
| 2005-06-28 00:00:00 | DENIED: 3RD REQUEST | | | | | | 1.PROVIDE DETAIL FOR THE DUCT | | | CONNECTION TO AHU LOCATED ON THE FIRST | | | FLOOR.PLAN SHEET A2 & M1 INDICATE A | | | 24" X 24" R/A GRILLE.PLEASE CLARIFY | | | DESIGN, CLOSET CANNOT BE USED AS A | | | RETURN AIR PLENUM WITH THE DOOR OPENINGS | | | INTO THE GARAGE (CARBON MONOXIDE).2001 | | | FBC(M) 603.9 & 602. | | | | | | 2.PLEASE NOTE RETURN AIR JUMPERS | | | SHALL BE SIZED IN ACCORDANCE WITH 2001 | | | FBC(M)601.4 EXCEPTION #1 & 3.THE | | | SECOND FLOOR SPARE BEDROOMS SHALL BE A | | | MINIMUM OF 12" AND THE MASTER SUITE | | | SHALL BE A MINIMUM OF 14".PLEASE | | | REVISE. | | | | | | 3.PLAN SHEET M2 INDICATES RETURN AIR | | | BACK TO THE AHU THROUGH A LOUVERED DOOR. | | | THE DOOR SCHEDULE ON PLAN SHEET A3, DOOR | | | #5TO THE AHU-2 CLOSET INDICATES A | | | SOLID CORE DOOR.PLEASE REVISE. | | | | | | 4.PROVIDE AN EQUIPMENT SCHEUDLE AS | | | DICTATED BY THE ENERGY CALCULATIONS. | | | | | | PLEASE NOTE, THE FLOOR PLAN IN THE | | | GARAGE AREA ON PLAN SHEET E1 DOES NOT | | | CORRELATE WITH A2 & M1 WITH RESPECT TO | | | LOCATION OF THE AHU & 80 GAL EWH. | | | PLEASE CLARIFY. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT (561)805-6719. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2005-05-28 |
|
|
Cont ID |
|
| Sent By |
hmoser |
Date |
2005-05-28 |
Time |
08:23 |
Rev Time |
0.00 |
| Received By |
hmoser |
Date |
2005-05-28 |
Time |
08:06 |
Sent To |
B |
|
| Notes |
| 2005-05-28 00:00:00 | PLAN DENIED | | | 1) AIRHANDLER LOCATED IN GARAGE CAN NOT | | | HAVE RETURN AIR IN UTIL.ROOM | | | SECTION 610.1.ABC.3.7 CHAPTER 13 FEC | | | 2) UTIL.ROOM HAS SOLID WOOD DOOR.PLEASE | | | SHOW HOW RETURN AIR GETS BACK TO | | | AIRHANDLER ON PLAN (DOOR SCHEDULE PAGE | | | A2 #4) | | | 3) PLEASE SHOW RETURN AIR DUCT SIZES IN | | | BED ROOMS PER SECTION 604.1 FBC(M) | | | PLAN REVIEW BY HAROLD MOSER 561-805-6732 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2005-02-14 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2005-02-14 |
Time |
08:41 |
Rev Time |
0.40 |
| Received By |
pkrauss |
Date |
2005-02-14 |
Time |
08:30 |
Sent To |
P |
|
| Notes |
| 2005-02-14 00:00:00 | DENIED:PLAN CHECK ONLY | | | | | | PLEASE CLARIFY RETURN AIR INTO THE AHU | | | LOCATEDIN THE GARAGE AREA.PROVIDE | | | DETAIL OF THE DUCT CONNECTION. | | | | | | PLEASE NOTE, WATER HEATER LOCATED IN THE | | | GARAGE SHALL BE PROTECTED FROM DAMAGE | | | PER 2001 FBC(M)303.4. | | | | | | PLEASE INDICATE TERMINATION OF DRYER | | | EXHAUST DUCT.SHOW COMPLIANCE WITH 2001 | | | FBC(M)504. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT (561)805-6719. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
P |
Date |
2005-12-20 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2005-12-20 |
Time |
08:22 |
Rev Time |
0.33 |
| Received By |
jleech |
Date |
2005-12-20 |
Time |
08:22 |
Sent To |
M |
|
| Notes |
| 2005-12-20 00:00:00 | REVISED RISER DIAGRAM |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2005-08-12 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2005-08-12 |
Time |
12:42 |
Rev Time |
0.50 |
| Received By |
jleech |
Date |
2005-08-12 |
Time |
12:42 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2005-05-28 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2005-05-28 |
Time |
07:25 |
Rev Time |
0.50 |
| Received By |
kstevens |
Date |
2005-05-28 |
Time |
07:25 |
Sent To |
M |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2005-02-14 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2005-02-14 |
Time |
18:03 |
Rev Time |
0.51 |
| Received By |
kstevens |
Date |
2005-02-14 |
Time |
18:03 |
Sent To |
B1 |
|
| Notes |
| 2005-02-14 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | FBC-2001 CHAPTER 1 | | | | | | 1) SHT SP1 SANITARY RISER DIAGRAM DOES | | | NOT REFLECT THE FLOOR PLAN, NOR DOES IT | | | MEET CODE REQUIREMENTS. | | | A) FIRST FLOOR BATHROOMS SHOW TUBS ON | | | THE FLOOR PLAN, BUT SHOW SHOWERS ON THE | | | SANT. RISER DIAGRAM. SECTION 104.2.1. | | | B) ALL SHOWERS, TUBS, BIDET, & WASH | | | MACHINE REQUIRE A TRAP. SECTION 901.2.1. | | | C) STANDPIPE FOR THE WASH MACHINE SHALL | | | BE UPSTREAM OF THE TRAP. PLEASE SHOW ON | | | THE RISER DIAGRAM. SECTION 104.2.1. | | | | | | | | | REVIEW BY KEN STEVENS | | | (561) 805-6721 | | | FAX (561) 653-2692 | | | E-MAIL [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2006-06-01 |
|
|
Cont ID |
|
| Sent By |
mmclean |
Date |
2006-06-01 |
Time |
16:47 |
Rev Time |
0.00 |
| Received By |
mmclean |
Date |
2006-06-01 |
Time |
16:47 |
Sent To |
B |
|
| Notes |
| 2006-06-01 00:00:00 | REVISION OF PROPOSED DRIVEWAY. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2005-08-22 |
|
|
Cont ID |
|
| Sent By |
mmclean |
Date |
2005-08-22 |
Time |
16:18 |
Rev Time |
0.00 |
| Received By |
mmclean |
Date |
2005-08-22 |
Time |
16:18 |
Sent To |
|
|
| Notes |
| 2005-08-22 00:00:00 | APPROVING RE-STAMPING OF SURVEY MM |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2005-02-04 |
|
|
Cont ID |
|
| Sent By |
mmclean |
Date |
2005-02-04 |
Time |
15:13 |
Rev Time |
0.00 |
| Received By |
mmclean |
Date |
2005-02-04 |
Time |
15:13 |
Sent To |
I |
|
| Notes |
| 2005-02-04 00:00:00 | NOTE, | | | 1. MUST PULL SEPERATE PERMIT FOR | | | POOL/DECK/SCREEN ENCLOSURE. | | | 2.POOL SETBACK MUST BE A MIN OF 5FT IN | | | REAR & NOTHING CAN BE BUILT IN UTILITY | | | EASEMENT. |
|
|