Plan Review Details - Permit 05011129
Plan Review Stops For Permit 05011129
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2005-03-16 Cont ID  
Sent By btrobaug Date 2005-01-31 Time 16:37 Rev Time 1.00
Received By btrobaug Date 2005-01-31 Time 16:37 Sent To ENG
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2006-03-17 Cont ID  
Sent By mamini Date 2006-03-17 Time 08:55 Rev Time 0.50
Received By mamini Date 2006-03-17 Time 08:55 Sent To  
Notes
2006-03-17 00:00:00PASSED:
 1. SEE LETTER FROM ENGINEERING SERVICES,
 BY MANNY GONZALEZ.
  
 IF ANY QUESTION PLEASE CONTACT 805-6723
 MOHAMMAD R. AMINI

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2006-03-03 Cont ID  
Sent By mamini Date 2006-03-03 Time 13:16 Rev Time 0.50
Received By mamini Date 2006-03-03 Time 13:16 Sent To  
Notes
2006-03-03 00:00:00FAILED:
  
 1. PLEASE SUBMIT THE PERMIT APPLIACTION
 AND PALNS TO ENGINEERING SERVICE DEPT.
 ATT; MANNY GONZALEZ 494-1085.
 HE WILL HELP YOU WITH THE REVVOCABLE
 PERMIT PROCESS.
  
 IF ANY QUESTION PLEASE CONTACT 805-6723
 MOHAMMAD R. AMINI

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2005-03-16 Cont ID  
Sent By mamini Date 2005-03-16 Time 10:01 Rev Time 1.00
Received By mamini Date 2005-03-16 Time 10:01 Sent To  
Notes
2005-03-16 00:00:00FAILED:
  
 1. PLEASE NOTE THAT A REVOCABLE PERMIT
 FROM THE CITY'S LAW DEPARTMENT FOR THIS
 INSTALLATION IS REQUIRED.
 2. PLEASE SUBMIT TWO SETS OF DRAWING TO
 THE PUBLIC UTILITIES ATT;MANNY GONZALEZ.
 DRAWING MUST SHOW THE LOCATION AND
 PROFILE WITH MINIMUM OF 3'COVER FROM THE
 TOP OF THE PAVEMENT.
 3. SUBSEQUENT TO OBTAINING THE PERMIT,
 SUMIT TO CONSTRUCTION SERVICES.
 3. PLEASE NOTE THAT, IT SHALL BE THE
 CONTRACTOR/APPLICANT' RESPONSIBILITY, AT
 HIS OWN EXPENSE TO REPAIR ANY DAMAGES TO
 THE PUBLIC R.O.W CAUSED BY THE PROPOSED
 INSTALLATION AND DURING THE OPERATION TO
 THE ORIGINAL OR BETTER CONDITION.
  
 IF ANY QUESTION PLEASE CONTACT 805-6723
 MOHAMMAD R. AMINI

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2006-03-14 Cont ID  
Sent By adarroug Date 2006-03-14 Time 14:56 Rev Time 0.00
Received By adarroug Date 2006-03-14 Time 14:56 Sent To ENG
Notes
2006-03-14 00:00:00TO "ENG" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2006-03-02 Cont ID  
Sent By adarroug Date 2006-03-02 Time 16:43 Rev Time 0.00
Received By adarroug Date 2006-03-02 Time 16:43 Sent To ENG
Notes
2006-03-02 00:00:00TO "ENG" BOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-03-02 Cont ID  
Sent By adarroug Date 2006-03-02 Time 14:47 Rev Time 0.00
Received By adarroug Date 2006-03-02 Time 14:47 Sent To E
Notes
2006-03-02 00:00:00TO "DPALMER" DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-01-24 Cont ID  
Sent By mjacobs Date 2005-01-24 Time 14:11 Rev Time 0.00
Received By mjacobs Date 2005-01-24 Time 14:11 Sent To E
Notes
2005-01-24 00:00:00TO "E" BOX.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved