Plan Review Details - Permit 05010185
Plan Review Stops For Permit 05010185
Review Stop I INCOMING/PROCESSING
Rev No 9 Status N Date 2006-01-26 Cont ID  
Sent By adarroug Date 2006-01-26 Time 16:35 Rev Time 0.00
Received By adarroug Date 2006-01-26 Time 16:34 Sent To M
Notes
2006-01-26 00:00:00TO "HMOSER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2005-12-19 Cont ID  
Sent By adarroug Date 2005-12-19 Time 09:57 Rev Time 0.00
Received By adarroug Date 2005-12-19 Time 09:57 Sent To M
Notes
2005-12-19 00:00:00TO "HMOSER" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2005-11-18 Cont ID  
Sent By adarroug Date 2005-11-18 Time 16:00 Rev Time 0.00
Received By adarroug Date 2005-11-18 Time 16:00 Sent To M
Notes
2005-11-18 00:00:00TO "M" BOX

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2005-10-11 Cont ID  
Sent By adarroug Date 2005-10-11 Time 17:32 Rev Time 0.00
Received By adarroug Date 2005-10-11 Time 17:32 Sent To M
Notes
2005-10-11 00:00:00TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2005-06-23 Cont ID  
Sent By adarroug Date 2005-06-23 Time 13:53 Rev Time 0.00
Received By adarroug Date 2005-06-23 Time 13:53 Sent To M
Notes
2005-06-23 00:00:00TO "PKRAUSS" BOX/REVISION

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-04-25 Cont ID  
Sent By adarroug Date 2005-04-25 Time 09:29 Rev Time 0.00
Received By adarroug Date 2005-04-25 Time 09:29 Sent To M
Notes
2005-04-25 00:00:00TO "M" BOX/REVISION

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-03-21 Cont ID  
Sent By adarroug Date 2005-03-21 Time 16:23 Rev Time 0.00
Received By hmoser Date 2005-03-23 Time 15:48 Sent To M
Notes
2005-03-21 00:00:00TO "PKRAUSS" BOX/REVISION

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-02-24 Cont ID  
Sent By adarroug Date 2005-02-24 Time 09:29 Rev Time 0.00
Received By adarroug Date 2005-02-24 Time 09:28 Sent To M
Notes
2005-02-24 00:00:00TO "PK" BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-01-05 Cont ID  
Sent By mjacobs Date 2005-01-05 Time 16:54 Rev Time 0.00
Received By mjacobs Date 2005-01-05 Time 16:54 Sent To M
Notes
2005-01-05 00:00:00TO "M/AC" BOX.

Review Stop M MECHANICAL (A/C)
Rev No 9 Status P Date 2006-01-30 Cont ID  
Sent By hmoser Date 2006-01-30 Time 14:34 Rev Time 0.00
Received By hmoser Date 2006-01-30 Time 14:34 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 8 Status P Date 2005-12-22 Cont ID  
Sent By hmoser Date 2005-12-22 Time 10:22 Rev Time 0.00
Received By hmoser Date 2005-12-22 Time 10:22 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 7 Status P Date 2005-11-07 Cont ID  
Sent By hmoser Date 2005-11-07 Time 18:04 Rev Time 0.00
Received By hmoser Date 2005-11-07 Time 18:04 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 6 Status P Date 2005-10-18 Cont ID  
Sent By hmoser Date 2005-10-18 Time 11:49 Rev Time 0.00
Received By hmoser Date 2005-10-18 Time 11:49 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 5 Status P Date 2005-07-06 Cont ID  
Sent By prafter Date 2005-07-06 Time 08:59 Rev Time 1.00
Received By prafter Date 2005-07-06 Time 08:59 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 4 Status P Date 2005-04-06 Cont ID  
Sent By hmoser Date 2005-04-06 Time   Rev Time 0.00
Received By hmoser Date 2005-04-06 Time 14:44 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2005-02-18 Cont ID  
Sent By lmartine Date 2005-02-18 Time 15:35 Rev Time 0.00
Received By lmartine Date 2005-02-18 Time 15:34 Sent To  
Notes
2005-02-18 00:00:00ENGINEER'S LETTER ACCEPTHED UNDER
 ALTERNATE MATERIALS AND METHODS.
  
 HAROLD PISKURA

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2005-02-11 Cont ID  
Sent By pkrauss Date 2005-02-11 Time 15:56 Rev Time 1.50
Received By pkrauss Date 2005-02-11 Time 10:20 Sent To  
Notes
2005-02-11 00:00:00DENIED:
 PLEASE NOTE, ON THE PREVIOUS REVIEW
 COMMENT #1 REQUESTED ENGINEERED
 DRAWINGS.THE PLANS SUBMITTED ARE FOR
 RISERS ONLY.PLEASE CLARIFY IF THE
 INTENT IS TO SUBMIT ENGINEERED PLANS AT
 A LATER DATE FOR THE LAYOUT OF THE DUCT
 SYSTEM AND THE PIPING?THE FOLLOWING
 INFORMATION IS ALSO REQUIRED.
  
 1.PLANS ONLY SIZE RISER.PLEASE
 INDICATE SIZE OF BRANCH LINES TO THE
 INDIVIDUAL FAN COILS.
  
 2.INDICATE WHAT MATERIAL BRANCH LINES
 WILL BE.
  
 3.PROVIDE TYPICAL DETAIL FOR FAN COIL
 INSTALLATION.PLEASE INDICATE ANY
 ISOLATION/SHUT OF VALVES, UNIONS, ETC.
 THAT MAY BE INSTALLED.
  
 4.PROVIDE INFORMATION ON THE AHU'S TO
 THE COMMON AREAS.INDICATE DUCT SMOKE
 DETECTORS.
  
 5.PERMIT APPLICATION INDICATES
 "DUCTWORK AS NEEDED".IT IS MY
 UNDERSTANDING THAT ALL DUCTWORK HAS BEEN
 REMOVED.PROVIDE DUCT LAYOUT, INDICATE
 DUCT SIZE AND MATERIAL.PLEASE NOTE,
 THIS DOES NOT HAVE TO BE SUBMITTED PRIOR
 TO PERMIT BEING ISSUED.PLANS WILL BE
 REQUIRED SO AS TO HAVE "LEGAL RECORD" AS
 TO THE WORK DONE.PLEASE INDICATE ALL
 FIRE DAMPERS AS REQUIRED PER 2001
 FBC(M)607.6.
  
 6.PROVIDE OUTSIDE AIR CALCULATIONS IN
 ACCORDANCE WITH 2001 FBC(M) TABLE 403.3.
  
 7.PLEASE NOTE, THE LETTER FROM SPEARS
 MANUFACTURING COMPANY IS ADDRESSED TO
 REY AND SON PLUMBING.CHILLED WATER
 SYSTEMS FOR HVAC IS NOT IN THE SCOPE OF
 WORK UNDER A PLUMBING CONTRACTORS
 LICENSE.
  
 8.THE LETTER FROM J-M MANUFACTURING IS
 SIGNED BY THE "PRODUCT ASSURANCE
 ENGINEER".PER THE FS 471.025 & THE FAC
 61G15-23.002 (1), A PROFESSIONAL
 ENGINEER SHALL AFFIX HIS SEAL TO ALL
 PLANS SPECIFICATIONS, REPORTS AND OTHER
 DOCUMENTS PREPARED OR ISSUED THAT ARE
 BEING FILED FOR PUBLIC RECORD.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561)805-6719.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2005-01-06 Cont ID  
Sent By pkrauss Date 2005-01-07 Time 14:56 Rev Time 3.00
Received By pkrauss Date 2005-01-06 Time 10:12 Sent To  
Notes
2005-01-06 00:00:00DENIED:
 1.REFERENCE FS 471, HVAC WORK THAT IS
 GREATER THAN $50,000, GREATER THAN 15
 TON SYSTEM WHICH IS DESIGNED TO
 ACCOMMODATE FOR THAN 100 PEOPLE, THIS
 WILL REQUIRE PLANS PREPARED BY A
 REGISTERED ENGINEER.
  
 2.PER FBC(M)1202.3, MATERIALS SHALL BE
 RATED FOR THE OPERATING TEMPERATURE &
 PRESSURE OF THE HYDRONIC SYSTEM.
 MATERIALS SHALL BE SUITABLE FOR THE TYPE
 OF FLUID IN THE HYDRONIC SYSTEM.
  
 3.PROVIDE MANUFACTURER'S SUBMITTAL
 DATA AND INSTALLATION INSTRUCTIONS
 APPLICABLE TO "LOW TEMPERATURE"
 INSTALLATIONS.
  
 4.PER 2001 AMENDMENTS TO THE FBC
 104.2.1.2, THE BUILDING OFFICIAL MAY
 REQUIRE DETAILS & COMPUTATIONS AND OTHER
 DATA NECESSARY TO ACCOUNT FOR THE
 INSTALLATION AND THE BASIS OF
 CALCULATIONS.ALL SPECIFICATIONS SHALL
 BE PREPARED BY AN ENGINEER OR
 ARCHITECT.
  
 5.PROVIDE SPECIFIC INFORMATION AS TO
 THE SCOPE OF WORK AND DESIGNATE NEW FROM
 EXISTING.
  
 6.PLEASE PROVIDE EQUIPMENT SCHEDULE.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561)805-6719.
  
  