Plan Review Details - Permit 04121118
Plan Review Stops For Permit 04121118
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2005-05-13 Cont ID  
Sent By alange Date 2005-05-13 Time 10:21 Rev Time 0.25
Received By alange Date 2005-05-13 Time 10:21 Sent To  
Notes
2005-05-13 00:00:00DENIED
  
 INSUFFICIENT INFORMATION SUBMITTED FOR A
 BUILDING PLAN REVIEW.
  
 SUBMIT A CLEAR SCOPE OF WORK FOR THIS
 PROJECT.
  
 ART LANGE
 BUILDING PLANS EXAMINER
 805-6672

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-01-12 Cont ID  
Sent By alange Date 2005-01-12 Time 09:23 Rev Time 0.25
Received By alange Date 2005-01-12 Time 09:23 Sent To  
Notes
2005-01-12 00:00:00DENIED
  
 NOT SUFFICIENT INFORMATION PROVIDED TO
 COMPLETE A BUILDING REVIEW.
  
 ART LANGE
 BUILDING PLANS EXAMINER
 805-6672

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2005-05-11 Cont ID  
Sent By dpalmer Date 2005-05-11 Time 12:54 Rev Time 0.40
Received By dpalmer Date 2005-05-11 Time 12:54 Sent To B
Notes
2005-05-11 00:00:00********** UNSAT 2ND REVIEW*********
  
 1)NOTE: PLEASE SEE PLANS NOW BEING
 SUBMITTED FOR REVIEW WHICH SHOWS NEW
 GUEST/APT UNIT.
 PLEASE SUBMIT A RISER DIAGRAM SHOWING
 NEW PANEL BEING ADDED TO EXISTING
 SERVICE.
 PLEASE SEE 225.31-225.36 FOR PANEL/
 MAINS ETC AT DETACHED BLDG.
 PLEASE SEE 250.32 FOR GROUNDING
 ELECTRODE SYSTEM AT DETACHED BLDGS.
 PLEASE INCLUDE PANEL SCHEDULE SHOWING
 ALL MIN CIRCUITING REQUIRED UNDER 2002
 NEC. 210.11,220.16,210.52,210.52D ETC.
 PLEASE SEE 210.12 2002 NEC FOR ARC FAULT
 PROTECTION REQUIRED.
 PLEASE INCLUDE LOAD CALCULATIONS FOR
 ADDED LOAD TO EXISTING SERVICE AND LOAD
 CALCS FOR NEW 100A PANEL.
 220.31,215.5
 PLEASE CLARIFU IF THESE ARE ADDED LOADS
 OR ARE THESE LOADS MOVING FROM MAIN
 HOUSE?
  
 2)NOTE: PLEASE SEE FBC 104.2.1 WHICH
 REQUIRES THE PRINTED NDAME AND SIGNATURE
 OF THE PERSON RESPONSIBLE FOR PLANS.
 THIS WAS REQUESTED ON PREVIOSU REVIEW.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2004-12-28 Cont ID  
Sent By dpalmer Date 2004-12-28 Time 14:15 Rev Time 0.10
Received By dpalmer Date 2004-12-28 Time 14:15 Sent To B
Notes
2004-12-28 00:00:00********** UNSAT **********
  
 1)NOTE:PLEASE SEE NO ELECTRICAL
 PLANS/DRAWINGS WERE SUBMITTED FOR WORK.
 PLEASE SUBMIT FOR COMPLETE SCOPE OF
 WORK. PLEASE INCLUDE ALL MIN REQUIRED
 UNDER 2002 NEC.
  
 2)NOTE: PLEASE SEE NOTES FROM ZONING
 WHICH MAY OR MAY NOT PERMIT ADDITONAL
 KITCHEN ETC. THIS WOULD HAVE AN AFFECT
 ON ELECTRICAL PLANS.
  
 3)NOTE : PLEASE SEE FBC 104.2.1, ALL
 PLANS/DRAWINGS ETC ARE REQUIRED TO HAVE
 THE PRINTED NAME AND SIGNATURE OF THE
 PERSON RESPONSIBLE FOR SUCH PLANS.
  
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2004-12-21 Cont ID  
Sent By wlehnhar Date 2004-12-21 Time 11:52 Rev Time 0.00
Received By wlehnhar Date   Time   Sent To  
Notes
2004-12-21 00:00:00OK PER S PILAND 10-22-04 NO CHARGE ALL
 EXTERIOR WORK

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-05-10 Cont ID  
Sent By adarroug Date 2005-05-10 Time 16:32 Rev Time 0.00
Received By adarroug Date 2005-05-10 Time 16:32 Sent To E
Notes
2005-05-10 00:00:00TO "DPALMER" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-05-03 Cont ID  
Sent By adarroug Date 2005-05-03 Time 16:29 Rev Time 0.00
Received By adarroug Date 2005-05-03 Time 16:28 Sent To Z
Notes
2005-05-03 00:00:00TO "Z" BOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-12-28 Cont ID  
Sent By mjacobs Date 2004-12-28 Time 07:35 Rev Time 0.00
Received By mjacobs Date 2004-12-28 Time 07:35 Sent To E
Notes
2004-12-28 00:00:00TO "E" BOX.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-12-21 Cont ID  
Sent By mjacobs Date 2004-12-21 Time 13:42 Rev Time 0.00
Received By mjacobs Date 2004-12-21 Time 13:42 Sent To Z
Notes
2004-12-21 00:00:00SENT TO "Z" BOX.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2005-05-10 Cont ID  
Sent By mmclean Date 2005-05-10 Time 11:34 Rev Time 0.00
Received By mmclean Date 2005-05-10 Time 11:00 Sent To I
Notes
2005-05-10 00:00:00DENIED,
 1. MUST SHOW THE LOCATION OF THE WORK ON
 TWO COPIES OF SURVEY WITH SETBACKS.
 2. IF THE FOOT PRINT OF STRUCTURE DOES
 NOT CHANGE, MUST INDICATE THAT ON THE
 TWO COPIES OF SURVEY.
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720

Review Stop Z ZONING
Rev No 1 Status F Date 2004-12-27 Cont ID  
Sent By mmclean Date 2004-12-27 Time 15:36 Rev Time 0.00
Received By mmclean Date 2004-12-27 Time 15:36 Sent To I
Notes
2004-12-27 00:00:00DENIED, MUST PROVIDE TWO COPY OF SURVEY
 SHOWING THE LOCATION OF WORK.CALLED
 OWNER LEFT MSG TO CALL


Account Summary | Usage Policy | Privacy Policy