| 2005-09-19 00:00:00 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL, BUILDING PLANS EXAMINER |
| | 561-805-6724 [email protected] |
| | |
| | FBC FLORIDA BUILDING CODE 2001 |
| | FBC* CITY OF WEST PALM BEACH AMENDMENTS |
| | TO THE FBC2001 |
| | |
| | THE FOLLOWING COMMENTS ARE FROM THE |
| | PREVIOUS REVIEW.NUMBERING WILL REMAIN |
| | THE SAME TO MAINTAIN CONSISTENCY. |
| | |
| | ALL CHANGES TO THE PLAN ARE TO BE |
| | CLOUDED. |
| | |
| | 1.)SEE PROPERTY APPRAISER VALUATION |
| | ATTACHED.THIS IS AN OVER 50% |
| | IMPROVEMENT AND MUST COMPLY WITH |
| | FBC3401.7.2.6.THIS SECTION AFFECTS |
| | OTHER COMMENTS ON THIS LIST. (WAS |
| | ACKNOWLEDGED.) |
| | |
| | 2.)ADDRESSED. |
| | |
| | 3.)THIS APPEARS TO BE TWO UNITS; ONE |
| | UPSTAIRS, ONE DOWNSTAIRS.2ND FLOOR IS |
| | TO BE IMPACT GLASS, CITY OF WEST PALM |
| | BEACH IMPLEMENTATION STANDARD FOR |
| | HURRICANE MISSILE IMPACT PROTECTION, |
| | ITEM #13, SEE ATTACHED.SUBMIT A |
| | HURRICANE INSTALLATION PLAN INCLUDING |
| | WHERE THE SHUTTERS WILL BE STORED FOR |
| | SHUTTERS USED ON THE FIRST FLOOR. |
| | |
| | SECOND REVIEW COMMENT - THIS WAS |
| | ADDRESSED BY CHANGING THE |
| | SECOND FLOOR TO IMPACT AND A NOTE |
| | STATING THAT THE FIRST FLOOR SHUTTERS |
| | WOULD BE STORED IN THE UTILITY ROOM |
| | BELOW THE STAIRS.ONLY THE BUILDING |
| | OFFICIAL CAN APPROVE THE USE OF SHUTTERS |
| | ON A COMMERCIAL BUILDING.PLEASE SUBMIT |
| | A HURRICANE SHUTTER INSTALLATION PLAN |
| | FOR REVIEW.THIS IS TO INCLUDE ALL |
| | PERTINENT INFORMATION SUCH AS STORAGE |
| | LOCATION, SIZE OF STORAGE AREA, WHERE |
| | THEY ARE STORED IN THAT AREA, HOW THEY |
| | ARE SECURED IN THAT LOCATION; WHO IS TO |
| | INSTALL THEM; TIME ESTIMATE FOR |
| | INSTALLATION; WHEN THE SHUTTERS WILL BE |
| | INSTALLED, ETC.THIS MAY BE SUBMITTED |
| | SEPARATELY FROM PLAN REVIEW (NO FEE). |
| | |
| | PLAN WAS NOT CHANGED, STILL SHOWS |
| | SHUTTERS ON THE FIRST FLOOR, AND AN |
| | INSTALLATION WAS NOT SUBMITTED FOR |
| | REVIEW. |
| | |
| | 4.)THE BALCONY (MEANS OF EGRESS FOR |
| | 2ND FLOOR UNIT) IS TO COMPLY WITH |
| | FBC1014.1.SHOW FIRE RESISTANCE (UL |
| | ASSEMBLY OR CALCULATED FBC CHAPTER 7), |
| | PROVIDE DOOR FIRE RATING INFORMATION. |
| | |
| | SECOND REVIEW COMMENT - THE FIRE RATING |
| | FOR THE DOOR WAS |
| | PROVIDED.I BELIEVE THAT THIS WAS |
| | ADDRESSED BY SHOWING TWO LAYERS OF |
| | DRYWALL ON THE CEILING OF THE FIRST |
| | FLOOR UNIT.PROVIDE CALCULATED FIRE |
| | RESISTANCE FOR THE FLOOR/CEILING |
| | ASSEMBLY FBC709 (EACH COMPONENT AND |
| | TIME, SHOW TOTAL). |
| | |
| | UL L504 WAS SHOWN ON THE PLAN.PLEASE |
| | INCORPORATE A DETAIL INTO THE PLAN. |
| | |
| | 5.)THE EXTERIOR STAIR IS TO COMPLY |
| | WITH FBC1006.2.4.SHOW FIRE RESISTANCE |
| | OF THE WALL.OPENINGS WITHIN 10' ARE |
| | TO BE 3/4 HR.INDICATE ON THE PLAN. |
| | |
| | SECOND REVIEW COMMENT - FIRE RESISTANCE |
| | OF THE WALL REQUIRED BY |
| | FBC1006.2.4 WAS NOT SHOWN.THERE IS A |
| | NOTE ON THE PLAN REGARDING OPENINGS.IT |
| | IS THE RESPONSIBILITY OF THE DESIGNER TO |
| | DETERMINE WHICH OPENINGS ARE TO BE |
| | PROTECTED.INDICATE ON THE ELEVATIONS, |
| | FLOOR PLAN OR A SCHEDULE. ALSO INCLUDE |
| | THE REAR BUILDING.SHOW RATED WALL |
| | REQUIREMENT ON THE FLOOR PLAN AS WELL AS |
| | A DETAIL SHOWING HOW IT COMPLIES. |
| | |
| | UL DESIGN U301 WAS SPECIFIED FOR THE NEW |
| | WALL.INCORPORATE THE DESIGN FOR FIRE |
| | RESISTANT WALLS INTO YOUR PLAN.YOUR |
| | WALL SECTION IS IN CONFLICT WITH THIS |
| | DETAIL.ALSO U301 HAS DRYWALL ON BOTH |
| | SIDES; APPEARS TO BE AN INTERIOR BEARING |
| | WALL, YOUR PLAN REQUIRES AN EXTERIOR |
| | APPLICATION WHICH MUST ALSO HAVE |
| | STRAPPING TO COMPLY WITH WIND |
| | REQUIREMENTS.PLEASE CLARIFY. |
| | |
| | HOW DOES THE EXISTING WALL COMPLY WITH |
| | THIS REQUIREMENT?ACCORDING TO THE |
| | ENERGY CALCS, THIS IS A FRAME WALL. |
| | PROVIDE A DETAIL AND SHOW COMPLIANCE. |
| | |
| | NOTE THAT FIRE RESISTANT WINDOWS REQUIRE |
| | IMPACT PROTECTION.THIS OPENING SHOULD |
| | BE INCLUDED IN THE PROPOSAL TO THE |
| | BUILDING OFFICIAL, INCLUDING HOW THE |
| | SECOND FLOOR WILL BE ACCESSED FOR |
| | INSTALLATION. |
| | |
| | 6.)ADDRESSED. |
| | |
| | 7.)ADDRESSED. |
| | |
| | 8.)ADDRESSED. |
| | |
| | 9.)FOR THE MODIFIED ROOF, INDICATE |
| | WHICH METHOD OF INSTALLATION YOU ARE |
| | USING. |
| | |
| | SECOND REVIEW - THIS SHOULD BE DONE BY |
| | CHOOSING ONE OF |
| | THE APPROVED ASSEMBLIES ON THE PRODUCT |
| | APPROVAL. |
| | |
| | NOT ADDRESSED.IF THIS IS NOT ADDRESSED |
| | CORRECTLY PRIOR TO PERMIT ISSUANCE, THE |
| | ROOF PERMIT NUMBER WILL BE VOIDED AND A |
| | SEPARATE PERMIT WITH SEPARATE FEES AND |
| | REVIEW WILL BE REQUIRED. |
| | |
| | 10.)ADDRESSED. |
| | |
| | 11.)BATHROOM DOOR ON THE FIRST FLOOR |
| | IS TO COMPLY WITH FBC11-11(1), CLEAR |
| | OPENING OF AT LEAST 29IN. |
| | |
| | NEW COMMENT - THIS IS REQUIRED ON SECOND |
| | FLOOR BATHROOMS AS WELL.PLEASE REVISE. |
| | |
| | 12.)THE ELEVATIONS AND WALL SECTION DO |
| | NOT MATCH.IS THERE A PARAPET WALL?IF |
| | THERE IS, SHOW DRAINAGE FBC1503.4. |
| | |
| | NOT ADDRESSED.A NOTE WAS SENT THAT |
| | THIS IS EXISTING.PLEASE SEE COMMENT |
| | #1.SHOW ALL REQUIRED DRAINAGE WITH |
| | CALCULATIONS. |
| | |
| | 13.)SUBMIT PRODUCT APPROVALS AND FIRE |
| | RESISTANCE INFORMATION IF APPLICABLE FOR |
| | THE FOLLOWING: |
| | |
| | EXTERIOR DOOR, FIRE RATED |
| | SINGLE HUNG WINDOW, FIRE RATED |
| | IMPACT SINGLE HUNG WINDOWS |
| | |
| | 14.)THE ENERGY CALCS FOR THE FRONT |
| | BUILDING, 1ST FLOOR GIVES A SQUARE FOOT |
| | AREA OF1203, THE LETTER FROM THE |
| | ENGINEER GIVES AN AREA OF 1483.SECOND |
| | FLOOR ENERGY CALCS GIVES AN AREA OF 965, |
| | LETTER FROM ENGINEER STATES 685 AFTER |
| | THE ADDITION.PROVIDE AREA CALCS FOR |
| | THE REAR BUILDING, 1ST AND 2ND FLOORS. |
| | PLEASE COMPARE WITH ENERGY CALCS PRIOR |
| | TO RESUBMITTAL. |
| | |
| | 15.)THE LETTERHEAD FOR THE ENGINEER IS |
| | REQUIRED TO HAVE THE CERTIFICATE OF |
| | AUTHORIZATION, FAC61G15. |
| | |
| | 16.)SEE ATTACHED FS553.80(2)(B).A 4X |
| | PLAN REVIEW FEE WILL BE CHARGED IF |
| | COMMENTS ARE NOT ADDRESSED. |