Plan Review Details - Permit 04110959
Plan Review Stops For Permit 04110959
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2005-03-08 Cont ID  
Sent By rmcdouga Date 2005-03-08 Time 13:22 Rev Time 0.00
Received By rmcdouga Date 2005-03-08 Time 13:22 Sent To  
Notes
2005-03-08 00:00:00DENIED
  
 SOIL DENSITY LETTER INCORRECTLY STATES
 THAT BOTTOM OF FOOTINGS TOBE 8" BELOW
 GRADE. PLANS AND 2001 FBC REQUIRE A
 MINIMUM OF 12" BELOW GRADE. REVISE.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2005-01-27 Cont ID  
Sent By rmcdouga Date 2005-01-27 Time 11:27 Rev Time 0.00
Received By rmcdouga Date 2005-01-27 Time 11:27 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2005-03-24 Cont ID  
Sent By dpalmer Date 2005-03-24 Time 09:33 Rev Time 0.30
Received By dpalmer Date 2005-03-24 Time 09:33 Sent To  
Notes
2005-03-24 00:00:00FEEDERS REVISED TO SHOW SE CABLE,
 HOWEVER PLANS/RISER STILLS SHOWS BEING
 INSTALLED IN CONDUIT. CALLED ELECTRICAL
 ENGINEER,CONDUIT IS NOT BEING USED. THIS
 IS A MISPRINT ON PLANS.
 CONDUIT CROSSED OUT ON PLANS PER
 ENGINEER'S REQUEST.
  
  
 WASHER VA REDLINED, SHOULD BE 1500VA
 220.16
  
 IF PLANS ARE REVISED FOR ANY FUTURE
 ITEMS, PLEASE ADJUST THE ABOVE AT THAT
 TIME.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2005-01-27 Cont ID  
Sent By rmcdouga Date 2005-01-27 Time 11:29 Rev Time 0.00
Received By rmcdouga Date 2005-01-27 Time 11:29 Sent To  
Notes
2005-01-27 00:00:00PASSED UNDER MASTER PERMIT #04010005

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2005-01-27 Cont ID  
Sent By rmcdouga Date 2005-01-27 Time 11:27 Rev Time 0.00
Received By rmcdouga Date 2005-01-27 Time 11:27 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2005-01-27 Cont ID  
Sent By rmcdouga Date 2005-01-27 Time 11:28 Rev Time 0.00
Received By rmcdouga Date 2005-01-27 Time 11:28 Sent To  
Notes
2005-01-27 00:00:00PASSED UNDER MASTER # 04010005

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2005-05-27 Cont ID  
Sent By adarroug Date 2005-05-27 Time 11:28 Rev Time 0.00
Received By adarroug Date 2005-05-27 Time 11:28 Sent To P
Notes
2005-05-27 00:00:00TO "KSTEVENS" BOX/REVISION

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2005-04-13 Cont ID  
Sent By adarroug Date 2005-04-13 Time 10:47 Rev Time 0.00
Received By adarroug Date 2005-04-13 Time 10:47 Sent To B
Notes
2005-04-13 00:00:00TO "RMCDOUGAL" DESK/REVISION

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-03-11 Cont ID  
Sent By adarroug Date 2005-03-11 Time 13:39 Rev Time 0.00
Received By adarroug Date 2005-03-11 Time 13:39 Sent To  
Notes
2005-03-11 00:00:00TO "COMM" BD#24/PLANS ON SFR

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-01-06 Cont ID  
Sent By mjacobs Date 2005-01-06 Time 15:57 Rev Time 0.00
Received By mjacobs Date 2005-01-06 Time 15:44 Sent To B
Notes
2005-01-06 00:00:00TO "ROB MCD" DESK.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-01-27 Cont ID  
Sent By rmcdouga Date 2005-01-27 Time 11:24 Rev Time 0.00
Received By rmcdouga Date 2004-11-30 Time 15:52 Sent To  
Notes
2004-11-30 00:00:00TO ROB MCDOUGAL'S DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-11-30 Cont ID  
Sent By rmcdouga Date 2004-11-30 Time 15:53 Rev Time 0.00
Received By rmcdouga Date 2004-11-19 Time 08:39 Sent To  
Notes
2004-11-19 00:00:00TO Z

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date   Cont ID  
Sent By   Date 2005-03-26 Time   Rev Time 0.00
Received By hmoser Date 2005-03-26 Time 12:27 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2005-01-27 Cont ID  
Sent By rmcdouga Date 2005-01-27 Time 11:24 Rev Time 0.00
Received By rmcdouga Date 2005-01-27 Time 11:24 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2005-06-13 Cont ID  
Sent By jleech Date 2005-06-13 Time 15:05 Rev Time 0.33
Received By jleech Date 2005-06-13 Time 15:05 Sent To  
Notes
2005-06-13 00:00:00WATER METERS ADDED TO EACH UNIT

Review Stop P PLUMBING
Rev No 2 Status P Date 2005-03-26 Cont ID  
Sent By jleech Date 2005-03-26 Time 13:33 Rev Time 0.33
Received By jleech Date 2005-03-26 Time 13:33 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2005-01-27 Cont ID  
Sent By rmcdouga Date 2005-01-27 Time 11:24 Rev Time 0.00
Received By rmcdouga Date 2005-01-27 Time 11:24 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2004-11-24 Cont ID  
Sent By eschneid Date 2004-11-24 Time 09:57 Rev Time 0.75
Received By eschneid Date 2004-11-24 Time 09:16 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved