Plan Review Details - Permit 04080570
| Plan Review Stops For Permit 04080570 |
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2004-08-30 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2004-08-30 |
Time |
10:24 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2004-08-30 |
Time |
10:24 |
Sent To |
P |
|
| Notes |
| 2004-08-30 00:00:00 | TO KS BOX/RESUB |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2004-08-12 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2004-08-12 |
Time |
15:07 |
Rev Time |
0.00 |
| Received By |
csiegber |
Date |
2004-08-12 |
Time |
15:07 |
Sent To |
P |
|
| Notes |
| 2004-08-12 00:00:00 | TO GAS |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2004-09-23 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2004-09-23 |
Time |
12:17 |
Rev Time |
1.00 |
| Received By |
kstevens |
Date |
2004-09-23 |
Time |
12:17 |
Sent To |
|
|
| Notes |
| 2004-09-23 00:00:00 | | | | | | | | | | | | | | | | | | | | | | | | | PER N. MELICK MANUFACTURE INFO | | | NOT REQUIRED FOR 1 & 2 FAMILY HOMES. | | | JULY 17, 2002 OFFICAL INTERPRETATION. | | | THE FIELD INSPECTOR SHALL VERIFY THE | | | INSTALLED EQUIPMENT INPUT DOES NOT EX- | | | CEED THE PIPE SIZING. | | | | | | IF DRYER ROOM IS A CONFINED SPACE, | | | OPENINGS REQUIRED PER SECTION 304.3.1 0R | | | SECTION 304.3.2 SHALL BE INSTALLED. | | | MINIMUM 1,750 CUBIC FEET REQUIRED. | | | | | | IF WATER HEATER ROOM IS A CONFINED SPACE | | | OPENINGS REQUIRED PER SECTION 304.3.1 OR | | | SECTION 304.3.2 SHALL BE INSTALLED. | | | MINIMUM 3750 CUBIC FEET REQUIRED. | | | | | | | | | | | | | | | | | | | | | | | | , |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2004-08-21 |
|
|
Cont ID |
|
| Sent By |
csiegber |
Date |
2004-08-30 |
Time |
10:24 |
Rev Time |
0.60 |
| Received By |
kstevens |
Date |
2004-08-21 |
Time |
12:19 |
Sent To |
|
|
| Notes |
| 2004-08-21 00:00:00 | DENIED | | | REFERENCE: FBC-2001 FUEL GAS | | | FBC-2001 CHAPTER 1 | | | | | | 1. SUBMIT AN ISOMETRIC DRAWING THAT | | | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE | | | AND CORRESPONDING LENGTHS PER FBC-2001 | | | FUEL GAS CODE. NOT ALL CUT SECTIONS SHOW | | | THE LENGTH. | | | 2. TYPE OF GAS, (LP OR NATURAL) | | | 3. BTU LOAD OF EACH APPLIANCE AND THE | | | TOTAL BTU LOAD ON THE SYSTEM. REFER TO | | | THE FBC-2001 FUEL GAS CODE SECS. 401.8 | | | THRU 402.5.2 AND TABLES 402(1) THRU | | | 402(34).TOTAL BTU LOAD OF EACH SYSTEM | | | IS NOT SHOWN. | | | 4. SUBMIT CALCULATIONS FOR COMBUSTION | | | AIR (IF APPLICABLE) PER FBC-2001 FUEL | | | GAS CODE SECTION 304. | | | 5. INDICATE HOW THE FUTURE GAS PIPING | | | WILL BE VALVED AND CAPPED OFF UNTILL THE | | | PIPING IS FINISHED. SECTION 104.2.1 | | | 6) ALL DRAWINGS SHALL BEAR THE NAME AND | | | SIGNATURE OF THE PERSON RESPONSIBLE FOR | | | THE DESIGN. SECTION 104.2.1 | | | | | | REVIEW BY KEN STEVENS | | | (561) 805-6721 | | | FAX (561) 653-2692 | | | E-MAIL [email protected] |
|
|
|