Plan Review Details - Permit 04071424
Plan Review Stops For Permit 04071424
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2005-05-06 Cont ID  
Sent By lsmith Date 2005-05-06 Time 13:42 Rev Time 0.25
Received By lsmith Date 2005-05-06 Time 13:42 Sent To  
Notes
2005-05-06 00:00:00BUILDIG REVISION: REQUESTED BY INSPECTOR
 TOM MOORE:
  
 FOOTER DETAIL FOR FUTURE SCREEN
 ENCLOSURE WITH PAVER DECK. SHOWS 12" X
 12" FOOTER WITH 1 #5 REBAR. THIN-SET
 (1/2" MAX")A 12" PAVER BRICK OVER
 FOOTER.
  
 SEE POOL PERMIT#05020713.
  
 LS

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2004-09-17 Cont ID  
Sent By lsmith Date 2004-09-17 Time 08:29 Rev Time 0.50
Received By lsmith Date 2004-09-17 Time 08:29 Sent To  
Notes
2004-09-17 00:00:00BUTT GLASS PRODUCT APPROVAL & ENGINEER
 LETTER. LS

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2004-08-12 Cont ID  
Sent By csiegber Date 2004-08-30 Time 10:22 Rev Time 1.00
Received By lsmith Date 2004-08-12 Time 14:00 Sent To  
Notes
2004-08-12 00:00:00BUIDING PLAN REVIEW: PROVISO
  
 1. SUBMIT SITE SPECIFIC OR LOCAL PRODUCT
 APPROVAL FOR BUTT GLASS ASSEMBLY.
  
 2. ENGINEER TO INSPECT BUTT GLASS
 ASSEMBLY WHEN INSTALLED.A LETTER
 SIGNED & SEALED STATING IT WAS
 INSTALLED PER HIS CAALCULATIONS SHALL
 BE SUBMITTED BEFORE A C/O CAN BE ISSUED.
  
  
 ANY QUESTIONS PLEASE CALL:
 LEA SMITH, BUILDING PLANS EXAMINER
 805-6713

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2004-08-12 Cont ID  
Sent By lsmith Date 2004-08-06 Time 16:21 Rev Time 0.00
Received By lsmith Date 2004-08-06 Time 16:21 Sent To  
Notes
2004-08-06 00:00:00BUILDING PLAN REVIEW
  
 1. IMPACT FEES MUST BE PAID TO PALM
 BEACH COUNTY, PLANS STAMPED BY THEM AND
 COPY OF RECEIPT SUBMITTED TO CITY OF
 WEST PALM BEACH BUILDING DEPARTMENT,
 BEFORE A BUILDING PERMIT CAN BE ISSUED.
  
 2. PRODUCT APPROVALS SUBMITTED WITH
 PERMIT APPLICATION AFTER OCTOBER 1,
 2003ARE REQUIRED TO COMPLY WITH THE
 FLORIDA PRODUCT APPROVAL SYSTEM. FOR
 INFORMATIONPLEASE SEE THE STATE WEBSITE
 AT
 WWW.FLORIDABUILDING.ORG. PRODUCTS WITH
 STATEWIDE APPROVAL ARE REQUIRED TO BE
 SUBMITTED WITH A COVER SHEET THAT LISTS
 THE PRODUCT IDENTITY NUMBER FROM THE
 STATE. IF THE PRODUCT DOES NOT HAVE
 STATEWIDE APPROVAL, SUBMIT AN APPLICA-
 TION FOR LOCAL PRODUCT APPROVAL OR SITE
 SPECIFIC FORM PER RULE 9B-72. SEE
 ATTACHMENT. WWW.FLORIDABUILDING.ORG
 A. STRUCTURAL COMPONENTS (HURRICANE
 CLIPS, TRUSS STRAPS, ETC.)
 B. HANSON ROOF TILES
 C. ARCH ALUMINUM SERIES 4500 STOREFRONT
  
 3. SUBMIT A LETTER FROM THE ENGINEER
 REFERENCING THE BUTT GLASS ASSEMBLY IN
 THE CAFE (H). INCLUDE THE CALCULATIONS
 FOR THE BUTT GLASS. AN ON SITE
 INSPECTION BY THE ENGINEER WILL BE
 REQUIRED WHEN THE WINDOW ASSEMBLY IS
 INSTALLED AND A SIGNED & SEALED LETTER
 TO THE BUILDING DEPARTMENT STATING IT
 HAS BEEN INSTALLED PER HIS CALCULATIONS.
  
 ANY QUESTIONS PLEASE CALL:
 LEA SMITH, BUILDING PLANS EXAMINER
 805-6713

Review Stop E ELECTRICAL
Rev No 5 Status P Date 2005-05-17 Cont ID  
Sent By dpalmer Date 2005-05-17 Time 07:38 Rev Time 0.30
Received By dpalmer Date 2005-05-17 Time 07:38 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 4 Status F Date 2005-05-03 Cont ID  
Sent By dpalmer Date 2005-05-03 Time 19:37 Rev Time 0.25
Received By dpalmer Date 2005-05-03 Time 19:29 Sent To  
Notes
2005-05-03 00:00:00**** UNSAT *****
  
 PLEASE SEE PLANS APPEAR TO BE FOR
 FINALS.
 PLEASE MAKE THE CORRECTIONS LISTED
 BELOW.
  
  
 1)NOTE: PLEASE SEE PLANS INDUCATE TWO
 MAIN DISCONNECTS OUTSIDE NEXT TO METER,
 HOWEVER RISER DOES NOT SHOW ANY MAINS.
 PLEASE CORRELATE.
 215.5
  
 2)NOTE: PLEASE SEE DRYER IS SHOWN WITH
 5KW LOAD ON A 1-P20A CIRCUIT. PLANS
 INDICATE DRYER AS GAS?
  
 3)NOTE: PLEASE VERIFY #OF #6 CONDUCTORS
 SHOWN FOR OVEN. PLEASE SEE COOKTOP IS
 SHOWN WITH 7.6KW ON A 20A 1POLE CIRCUIT.
 IF SHOWN WITH 4-#6'S THEN THESE WOULD BE
 REQUIRED.
  
 PLEASE VERIFY.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2005-03-25 Cont ID  
Sent By btrobaug Date 2005-03-25 Time 10:22 Rev Time 0.50
Received By btrobaug Date 2005-03-25 Time 10:20 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2004-09-20 Cont ID  
Sent By dpalmer Date 2004-09-20 Time 07:23 Rev Time 0.25
Received By dpalmer Date 2004-09-20 Time 07:22 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2004-08-04 Cont ID  
Sent By csiegber Date 2004-08-30 Time 10:23 Rev Time 0.50
Received By btrobaug Date 2004-08-04 Time 11:19 Sent To M
Notes
2004-08-04 00:00:00 
 PROVISO
 ~~~~~~~
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 THE GEC MUST BE #2 PER 250.66. SEE RISER
  
 A #6 GROUND MUST BE INSTALLED IN THE
 CONDUIT FROM THE DISCONNECT TO THE
 PANELS. 250.122.
  
 THESE REDLINED PROVISO ITEMS MUST BE
 CORRECTED ON THE PLANS OR REVISIONS NEXT
 SUBMITTED. IF NOT CORRECTED THE
 REVISION WILL BE FAILED. PLEASE SEE
 THAT THE ARCHITECT READS THIS PROVISO.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718
 [email protected]
 FAX/:561/659-8026

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2005-05-11 Cont ID  
Sent By adarroug Date 2005-05-11 Time 15:28 Rev Time 0.00
Received By adarroug Date 2005-05-11 Time 15:28 Sent To E
Notes
2005-05-11 00:00:00TO "DPALMER" DESK/REVISION

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2005-04-29 Cont ID  
Sent By adarroug Date 2005-04-29 Time 13:58 Rev Time 0.00
Received By adarroug Date 2005-04-29 Time 13:58 Sent To E
Notes
2005-04-29 00:00:00TO "DPALMER" DESK/REVISION

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-04-27 Cont ID  
Sent By adarroug Date 2005-04-27 Time 13:47 Rev Time 0.00
Received By adarroug Date 2005-04-27 Time 13:47 Sent To B
Notes
2005-04-27 00:00:00TO "LSMITH" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2004-08-30 Cont ID  
Sent By csiegber Date 2004-08-30 Time 10:23 Rev Time 0.00
Received By csiegber Date 2004-08-30 Time 10:23 Sent To E
Notes
2004-08-30 00:00:00TO BT DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-08-30 Cont ID  
Sent By csiegber Date 2004-08-30 Time 10:22 Rev Time 0.00
Received By csiegber Date 2004-08-30 Time 10:22 Sent To B
Notes
2004-08-30 00:00:00TO LS DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-08-10 Cont ID  
Sent By mmclean Date 2004-08-03 Time 12:00 Rev Time 0.00
Received By lsmith Date 2004-07-30 Time 16:33 Sent To  
Notes
2004-08-04 00:00:00TO SFD RACK/E
2004-07-30 00:00:00TO Z

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2004-08-11 Cont ID  
Sent By jleech Date 2004-08-10 Time 17:43 Rev Time 0.35
Received By pkrauss Date 2004-08-11 Time 06:20 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2004-08-10 Cont ID  
Sent By jleech Date 2004-08-10 Time 17:43 Rev Time 0.33
Received By jleech Date 2004-08-10 Time 17:43 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2004-08-03 Cont ID  
Sent By mmclean Date 2004-08-03 Time 12:00 Rev Time 0.00
Received By mmclean Date 2004-08-03 Time 12:00 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved