Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2004-09-20 Cont ID  
Sent By shill Date 2004-09-20 Time 15:49 Rev Time 1.00
Received By shill Date 2004-09-20 Time 14:41 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2004-07-30 Cont ID  
Sent By shill Date 2004-07-30 Time 07:11 Rev Time 2.00
Received By shill Date 2004-07-30 Time 07:11 Sent To  
Notes
2004-07-30 00:00:00****CORRECTIONS****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 [email protected]
  
 1.)A NOTICE OF COMMENCEMENT MUST BE
 FILED WITH THE CLERK OF COURTS BEFORE A
 PERMIT CAN BE ISSUED.
  
 2.)SEPARATE PERMITS REQUIRED.
  
 3.)A CERTIFICATE OF AUTHORIZATION IS
 REQUIRED FOR ANDREW MORGAN SERVICES PER
 CARRIE FLYNN OF FPBE.MR. MORGAN HAS
 BEED ADVISED OF THIS IN WRITING FROM
 THIS OFFICE TWICE.SEE ATTACHED.
 FAC61G15-23.002, FS471.025.
  
 4.)SPECIFY THE SLOPE FOR THE "NEW
 ACCESSIBLE RAMP", C1, BOTTOM LEFT.
  
 5.)SUBMIT PRODUCT APPROVALS FOR THE
 MODIFIED ROOF FOR REVIEW, OR CAN BE
 SUBMITTED WITH THE ROOF PERMIT
 APPLICATION.
  
 6.)STUCCO IN A VERTICAL APPLICATION
 IS REQUIRED TO BE 7/8" MIN. (7-A2),
 FBC2504.2.2, ASTMC926.CHECK ALL
 DETAILS.
  
 7.)DECLARE A BUILDING TYPE.IS THIS
 BUILDING SPRINKLED? IF IT IS, SPRINKLERS
 ARE REQUIRED (NOTE REQUIREMENT, IF ANY,
 ON PLAN).IF REQUIRED, SUBMIT SPRINKLER
 PLANS FBC104.3.1.1(5).

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2004-10-19 Cont ID  
Sent By dpalmer Date 2004-10-19 Time 09:43 Rev Time 0.50
Received By dpalmer Date 2004-10-19 Time 09:14 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2004-08-30 Cont ID  
Sent By csiegber Date 2004-10-12 Time 11:42 Rev Time 0.25
Received By dpalmer Date 2004-08-30 Time 15:40 Sent To  
Notes
2004-08-30 00:00:00******** UNSAT ***********
  
 1)NOTE: PLEASE SEE NOTE FROM PREVIOUS
 REVIEW.
 PLEASE INCLUDE ALL INFORMATION ON TITLE
 BLOCK PER FAC 61G15-23.002 AS REQUIRED
 UNDER FS 471.023
  
 THIS IS REQUIRED ON ALL SHEETS WHEATHER
 OR NOT COMMENT IS MADE BY OTHER REVIEW-
 -ERS.
 PLEASE ALSO SEE F-1 SHEET.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2004-07-27 Cont ID  
Sent By dpalmer Date 2004-07-27 Time 08:54 Rev Time 0.25
Received By dpalmer Date 2004-07-27 Time 08:53 Sent To  
Notes
2004-07-27 00:00:00************ UNSAT ****************
  
 1)NOTE: PLEASE INCLUDE ALL LICENSE #'S
 AS REQUIRED PER FAC 61G15-23.002
 FS 471.023.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2004-09-21 Cont ID  
Sent By mamini Date 2004-09-21 Time 11:17 Rev Time 0.50
Received By mamini Date 2004-09-21 Time 11:17 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2004-09-21 Cont ID  
Sent By nmccray Date 2004-09-21 Time 15:46 Rev Time 0.00
Received By nmccray Date 2004-09-21 Time 15:46 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2004-07-30 Cont ID  
Sent By mcarsill Date 2004-07-30 Time 09:26 Rev Time 0.00
Received By mcarsill Date 2004-07-30 Time 09:26 Sent To  
Notes
2004-07-30 00:00:001) ALL NEW RAMPS SHALL BE EQUIPPED
 WITH HANDRAILS ON BOTH SIDES.
  
 MIKE CARSILLO, ASSISTANT FIRE MARSHAL
 835-2910

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2004-10-12 Cont ID  
Sent By csiegber Date 2004-10-12 Time 11:42 Rev Time 0.00
Received By csiegber Date 2004-10-12 Time 11:42 Sent To E
Notes
2004-10-12 00:00:00TO DP DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-08-23 Cont ID  
Sent By csiegber Date 2004-08-23 Time 15:00 Rev Time 0.00
Received By csiegber Date 2004-08-23 Time 15:00 Sent To  
Notes
2004-08-23 00:00:00TO COMM BD#55

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-08-04 Cont ID  
Sent By mmclean Date 2004-08-04 Time 12:28 Rev Time 0.00
Received By csiegber Date 2004-07-22 Time 15:44 Sent To  
Notes
2004-07-22 00:00:00TO COMM BD#42

Review Stop Z ZONING
Rev No 2 Status P Date 2004-08-23 Cont ID  
Sent By mmclean Date 2004-08-23 Time 09:42 Rev Time 0.00
Received By mmclean Date 2004-08-23 Time 09:42 Sent To  
Notes
2004-08-23 00:00:00APPROVED BY RANDALL GRANBERRY, PLANNER
 805-1454 MM

Review Stop Z ZONING
Rev No 1 Status F Date 2004-08-04 Cont ID  
Sent By mmclean Date 2004-08-04 Time 12:28 Rev Time 0.00
Received By mmclean Date 2004-07-26 Time 09:34 Sent To I
Notes
2004-08-04 00:00:00DENIED, BY RANDALL GRANBERRY, PLANNER
 822-1454.NEED TO PROVIDE UPDATED
 SITEPLAN.CONTRACTOR CALLED.