Plan Review Details - Permit 04060157
Plan Review Stops For Permit 04060157
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2005-09-07 Cont ID  
Sent By rmcdouga Date 2005-09-07 Time 13:38 Rev Time 0.00
Received By rmcdouga Date 2005-09-07 Time 13:38 Sent To  
Notes
2005-09-07 00:00:00REVISION TO CHANGE LOGGIA ROOF TO
 PITCHED ROOF WITH CEMENT TILE IS OK.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2004-08-16 Cont ID  
Sent By rmcdouga Date 2004-08-16 Time 09:54 Rev Time 0.00
Received By rmcdouga Date 2004-08-16 Time 09:54 Sent To  
Notes
2004-08-16 00:00:001) CALLED MICHELLE AT PBC IMPACT FEE
 OFFICE AND WAS TOLD THAT IMPACT FEES HAD
 BEEN PAID IN FULL 8/16/04.RM
  
 2) A SIGNED AND SEALED COPY OF THE SOIL
 REPORT WAS SUBMITTED. RM

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2004-08-13 Cont ID  
Sent By rmcdouga Date 2004-08-13 Time 10:30 Rev Time 4.00
Received By rmcdouga Date 2004-08-13 Time 10:30 Sent To  
Notes
2004-08-13 00:00:00BUILDING PROVISO
  
 1) SUBMIT PAID RECEIPT FOR IMPACT FEES.
  
 2) SUBMIT A SIGNED AND SEALED COPY OF
 THE SOIL REPORT WITH THE BORING LOG AND
 MAP OF BORING LOCATIONS.
  
 3) SUBMIT A STATE PRODUCT APPROVAL FOR
 IMPACT RESISTANT STRUCTURAL MULLIONS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2004-07-01 Cont ID  
Sent By jleech Date 2004-08-10 Time 18:10 Rev Time 6.00
Received By rmcdouga Date 2004-07-01 Time 07:52 Sent To  
Notes
2004-07-01 00:00:00DENIED
  
 1) THE NOTICE OF COMMENCEMENT HAS NO
 DESCRIPTION OF WORK ON IT. SEE FS 713.13
 SUBMIT RECORDED COPY OF NOC WITH ALL
 REQUIRED INFORMATION.
  
 2) FBC* 1804.2.2AREA OF QUESTIONABLE
 SOIL.SUBMIT A GEOTECHNICAL REPORT
 TO VERIFY THE SAFE BEARING CAPACITY OF
 THE SOIL.
  
 3) THE NAME AND SIGNATURE OF THE PERSON
 RESPONSIBLE FOR THE DESIGN OF THE
 STRUCTURE IS REQUIRED ON EACH SHEET OF
 THE DRAWINGS PER FBC 104.2.1.
  
 4) SPECIFY THE BUILDING CATEGORY ON THE
 PLANS AS REQUIRED BY FBC 1606.1.7 (2).
  
 5) SPECIFY THE DESIGN CRITERIA USED TO
 DESIGN THE STRUCTURE TO RESIST THE WIND
 LOADS IN FBC 1606 AND COMBINED LOADS IN
 FBC 1609.
  
 6) THE FIRST FLOOR BATHROOM IS REQUIRED
 TO HAVE A DOOR WITH A 29" CLEAR OPENING.
 SEE FBC 11-4.22.2.
  
 7) THE EGRESS WINDOWS IN THE SCHEDULE
 ARE 24-5 WINDOWS.
  
 8) THE "+" FOR SECOND STORY TIE DOWNS
 ON A2 AND A5 ARE NOT CLEAR AS TO THE
 SPACING. IS THIS INDICATING THE FLOOR
 TRUSS CONNECTORS AT 2'OC OR THE WALL TO
 FLOOR TRUSS CONNECTIONS AT 4'OC? PLEASE
 CLARIFY.
  
 10) CLARIFY THE LOCATIONS OF THE HD5
 HOLDDOWN CONNECTORS. GIVE SPACING
 DIMENSIONS. NO HOLDOWNS ARE SPECIFIED
 AT THE SECOND FLOOR WEST WALL. INDICATE
 THE SECOND FLOOR SHEAR WALLS.
  
 11) FBC 1503.4.4 REQUIRES GUTTERS AND
 DOWN SPOUTS ON ROOFS WITH LESS THAN 6"
 OF OVERHANG WITH WATER DISCHARGED ONE
 FOOT FROM STRUCTURE. SIZE AND DISCHARGE
 OF ROOF GUTTERS, SCUPPERS, ETC. PER FBC
 PLUMBING. SPECIFY THIS FOR THE FLAT ROOF
 AT GARAGE AND DECK.
  
 12) SPECIFY THE 1-1/2" BLOCK RECESS
 WATERSTOP WHERE THE MASONRY WALL BEARS
 ON THE CONCRETE FLOOR. SEE CITY OF WPB
 AMENDMENTS TO FBC 2111.1.9.
  
 13) SPECIFY THE EMBEDMENT DEPTH OF THE
 3" DIAMETER PIPE COLUMN AT THE LOGGIA.
  
 14) CLARIFY THE COLUMNS INDICATED ON A4
 WITH THE TWO REINFORCING BARS. ARE THESE
 8 X 16 BLOCK WITH 2 REINFORCED FILLED
 CELLS?
  
 15) A5 SHOWS META 24 CONNECTORS FOR THE
 GARAGE ROOF AND D1 ON A8 SHOWS HETA 20
 CONNECTORS. PLEASE CLARIFY.
  
 16) DETAIL 1 ON A6 SHOULD THIS BE A SPH6
 CONNECTOR INSTEAD OF HPH6 ?
  
 17) SPECIFY THE BUCK ATTACHMENT FOR THE
 DOORS.
  
 18) THE UPLIFT VALUE FOR THE META 24
 CONNECTORS IS INCORRECT. IT SHOULD BE
 1450#. SEE 2004 SIMPSON CATALOG.
  
 19) PLEASE CLARIFY THE FOOTING THICKNESS
 DIMENSIONS LISTED ON A6. TOP OF FINISH
 FLOOR IS REQUIRED TO BE A MINIMUM OF 4"
 ABOVE FINAL GRADE AND BOTTOM IS REQUIRED
 TO BE MINIMUM OF 12" BELOW GRADE. FBC
 1804.1.3 AND CITY AMEND. 1804.1.7.
  
 20) THE UPLIFT VALUE OF THE HETA 20 ON
 A8 IS INCORRECT. IT SHOULD BE 1810# PER
 2004 SIMPSON CATALOG.
  
 21) THE STRUCTURE IS TYPE VI. PLEASE
 REVISE NOTE ON A8.
  
 22) CLARIFY THE 2 DIMENSIONS GIVEN FOR
 THE FOOTER WIDTH IN DETAIL 1 ON A9.
  
 23) THE DESIGN PRESSURE IN THE TABLE ON
 A9 IS INCORRECT FOR THE POSITIVE
 INTERIOR ZONE FOR 0-15 SQFT OPENINGS.
 SHOULD BE +35.3.
  
 24) SPECIFY THE POSITIVE AND NEGATIVE
 OPENING PRESSURES FOR EACH WINDOW AND
 DOOR OPENING ON THE ELEVATIONS.
  
 25) THE WELDED POST CAP & POST ASSEMBLY
 ON A9 IS REQUIRED TODESIGNED BY AN
 ARCHITECT OR ENGINEER.
  
 26) SPECIFY THE EDGE DISTANCE AND CENTER
 TO CENTER SPACING OF THE REDHEADS USED
 TO ATTACH THE GARAGE DOOR BUCK ON SHEET
 A10.
  
 27) FIREBLOCKING IS REQUIRED AT THE
 CONCEALED SPACE BETWEEN STAIR STRINGERS
 AT THE TOP AND BOTTOM OF RUNS PER FBC
 2305.1.4. SPECIFY ON A11 AND A12.
  
 28) FBC 1007.8.1 REQUIRES WINDERS TO
 HAVE A MINIMUM TREAD WIDTH OF 6" AND A
 MINIMUM TREAD DEPTH OF 11" AT A POINT
 12" FROM THE NARROW EDGE. SPECIFY THIS
 ON PLANS.
  
 29) CHECK CALCULATIONS FOR UPLIFT AT HIP
 ROOF GIRDER TRUSSES ON A13. UPLIFT MAY
 EXCEED 1260# AT THESE LOCATIONS.
  
 30) SUBMIT STATE PRODUCT APPROVALS FOR
 OVERHEAD GARAGE DOOR, STRUCTURAL
 MULLIONS, STANLEY 6-PANEL DOOR, TRUSS
 CONNECTORS.
  
 31) PLEASE CLARIFY ON A1 WHICH WINDOWS
 AND DOORS ARE TO BE IMPACT RESISTANT AND
 WHICH WILL BE SHUTTERED.
  
 SEE NOTES IN RED PENCIL ON THE PLANS.
  
 IF YOU HAVE QUESTIONS PLEASE CALL:
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2004-08-03 Cont ID  
Sent By btrobaug Date 2004-08-03 Time 14:43 Rev Time 0.50
Received By btrobaug Date 2004-08-03 Time 10:01 Sent To M
Notes
2004-08-03 00:00:00 
 PROVISO
 ~~~~~~~
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 NOTE THAT ON SHEET E-1 THE FOLLOWING
 ITEMS NEED CORRECTIONS.
  
 1} THE BEDROOM NEEDS TWO RECEPTACLES
 ADDED TO COMPLY WITH 210.52(A)&(B).
  
 2} THE LOCATION OF THE A/C DISCONNECTS
 DO NOT COMPLY WITH CLEARANCE
 REQUIREMENTS OF 110.26.
  
 PLEASE SEE THAT THESE CORRECTIONS ARE
 MADE PRIOR TO ROUGH INSPECTION AND
 REVISED ON THE PLAN BEFORE C.O..
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718
 [email protected]
 FAX/:561/659-8026

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2004-06-11 Cont ID  
Sent By csiegber Date 2004-07-26 Time 17:09 Rev Time 0.75
Received By btrobaug Date 2004-06-11 Time 10:03 Sent To M
Notes
2004-06-11 00:00:00 
 PLEASE MAKE THE FOLLOWING CORRECTIONS
 FOR CODE COMPLIANCE AND RESUBMIT FOR
 REVIEW.
  
 1} THE ELECTRICAL RISER INDICATES THE
 SERVICE IS EXISTING. SHOW LOCATION OF
 SERVICE. THIS IS CONFUSING DO TO THE
 FACT THE RESIDENCE HAS NOT YET BEEN
 CONSTRUCTED.
  
 2} PLEASE PROVIDE PANEL SCHEDULES AND
 LOADS FOR ALL PANELS. WHAT DOES THE 2ND
 METER AND PANEL "K" SERVE?
  
 3} THE GRONDING ELECTRODE SYSTEM MUST
 COMPLY WITH 250.50 "EACH ITEM",
 INCLUDING FOOTER STEEL, (UFER GROUND).
  
 4} THE GARAGE RECEPTACLES MUST BE GFCI
 PROTECTED PER 210.8(A)(2).
  
 5} PROVIDE SMOKE DETECTORS PER
 8-1.4.1.6.2 NFPA-72 & 905.2.2 FBG, SEE
 SHEET E-1.
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718
 [email protected]
 FAX/:561/659-8026

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-09-07 Cont ID  
Sent By adarroug Date 2005-09-07 Time 09:03 Rev Time 0.00
Received By adarroug Date 2005-09-07 Time 09:03 Sent To B
Notes
2005-09-07 00:00:00TO "RMCDOUGAL" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-07-26 Cont ID  
Sent By csiegber Date 2004-07-26 Time 17:09 Rev Time 0.00
Received By csiegber Date 2004-07-26 Time 17:09 Sent To E
Notes
2004-07-26 00:00:00TO BT DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-07-01 Cont ID  
Sent By mmclean Date 2004-06-08 Time 12:13 Rev Time 0.00
Received By rmcdouga Date 2004-06-04 Time 16:47 Sent To  
Notes
2004-06-08 00:00:00TO SFD RACK/E
2004-06-04 00:00:00TO Z

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2004-08-06 Cont ID  
Sent By pkrauss Date 2004-08-06 Time 08:29 Rev Time 0.35
Received By pkrauss Date 2004-08-06 Time 07:33 Sent To P
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2004-06-14 Cont ID  
Sent By btrobaug Date 2004-08-03 Time 14:46 Rev Time 0.30
Received By pkrauss Date 2004-06-14 Time 09:15 Sent To P
Notes
2004-06-14 00:00:00DENIED:
 PLANS SUBMITTED ARE NOT COMPLETE.
 PLEASE PROVIDE THE FOLLOWING
 INFORMATION FOR REVIEW:
  
 1.DUCT SIZES FOR THE SUPPLY AND RETURN
 AIR JUMPERS.JUMPERS ARE TO BE 1 1/2
 THE SUPPLY AIR TO THAT SPACE.IN THE
 MASTER SUITE, ALL SUPPLY AIR INTO THE
 SUITE IS TO BE INCLUDED FOR A "TOTAL"
 OF SUPPLY AIR TO THE SUITE, SIZE THE
 RETURN ACCORDINGLY.
  
 2.PROVIDE LOCATION OF THE AHU.
  
 3.PROVIDE ENERGY AND MANUAL J CALCS
 AS PER 2001 FBC CHAPTER 13 SUB-CHAPTER
 6.
  
 4.PROVIDE AN EQUIPMENT SCHEDULE.
  
 5.PLAN SHEET M-2 BEDROOM AREAS
 INDICATE A RETURN AIR JUMPER AND A
 RETURN AIR GRILLE, NO SUPPLY DUCT
 INDICATED, PLEASE CLARIFY.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561) 805-6719.

Review Stop P PLUMBING
Rev No 2 Status P Date 2004-08-10 Cont ID  
Sent By jleech Date 2004-08-10 Time 18:10 Rev Time 0.33
Received By jleech Date 2004-08-10 Time 18:10 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2004-06-17 Cont ID  
Sent By pkrauss Date 2004-08-06 Time 08:30 Rev Time 0.75
Received By jleech Date 2004-06-17 Time 19:20 Sent To B
Notes
2004-06-17 00:00:00DENIED;
 1.DELETE GAS RISER. GAS CONTRACTOR TO
 PROVIDE RISER DIAGRAM WITH REQUIRED
 INFORMATION WITH PERMIT APPLICATION.
 2.RISER DIAGRAM; 1-LAV IS MISSING FROM
 MASTERBATH, FIRST FLOOR BATH SHR. NOT
 SHOWN, AND DRY VENT GOES THRU ROOF.
 3.WASHING MACHINE NOT SHOW ON FLOOR PLAN
 OR RISER DIAGRAM.
 PLUMBING PLAN REVIEW BY;
 JOHN LEECH
 805-6695

Review Stop Z ZONING
Rev No 1 Status P Date 2004-06-08 Cont ID  
Sent By mmclean Date 2004-06-08 Time 12:13 Rev Time 0.00
Received By mmclean Date 2004-06-08 Time 12:13 Sent To I
Notes
***NONE***