|
 |
 |
 |
 |
 |
Plan Review Details - Permit 04051134
| Plan Review Stops For Permit 04051134 |
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2004-06-15 |
|
|
Cont ID |
|
| Sent By |
mjacobs |
Date |
2004-06-15 |
Time |
13:47 |
Rev Time |
0.00 |
| Received By |
mjacobs |
Date |
2004-06-15 |
Time |
13:47 |
Sent To |
P |
|
| Notes |
| 2004-06-15 00:00:00 | RESUB TO P BOX /PIPING TABLES |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2004-05-26 |
|
|
Cont ID |
|
| Sent By |
alange |
Date |
2004-05-26 |
Time |
10:09 |
Rev Time |
0.00 |
| Received By |
alange |
Date |
2004-05-26 |
Time |
10:09 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2004-06-20 |
|
|
Cont ID |
|
| Sent By |
pschmitz |
Date |
2004-06-20 |
Time |
07:13 |
Rev Time |
0.75 |
| Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2004-06-20 00:00:00 | PLAN REVIEW PROVIS: | | | SEE ATTACHED. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
|
Date |
2004-06-05 |
|
|
Cont ID |
|
| Sent By |
mjacobs |
Date |
2004-06-15 |
Time |
13:48 |
Rev Time |
0.00 |
| Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2004-06-05 00:00:00 | PLAN REVIEW DENIED FBC 2001 FUEL GAS | | | (1) ALL DRAWINGS SHALBEAR THE NAME OF | | | THE FIRM AND THE NAME OF THE PERSON | | | RESPONSIBLE FOR THE DESIGN. | | | (2) SUBMIT MANUFACTURE SHEETS FOR ALL | | | EQUIPMENT TO VERIFY COMPLIANCE WITH | | | STANDARDS NFPA 54, NFPA 58, AND THE | | | FBC-2001 FUEL GAS CODE SEC 402.2 | | | (3) TOTAL LOAD ON EXISTING SYSTEM AND | | | TOTAL DEVELOPED LENGTH TO THE FARTHEST | | | OUTLET. | | | (4) MANFACTURE INFORMATION FOR PE AND | | | PIPE SIZING TABEL. | | | END OF COMMENTS, QUESTIONS 561-805-6692 |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |