Plan Review Details - Permit 04051102
Plan Review Stops For Permit 04051102
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2004-08-05 Cont ID  
Sent By alange Date 2004-08-05 Time 14:14 Rev Time 0.66
Received By alange Date 2004-08-05 Time 14:14 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2004-06-11 Cont ID  
Sent By shill Date 2004-06-11 Time 14:48 Rev Time 1.00
Received By shill Date 2004-06-11 Time 13:28 Sent To  
Notes
2004-06-11 00:00:00****CORRECTIONS****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 [email protected]
  
 1.)SHEET S2 PROVIDES DESIGN
 INFORMATION (STRUCTURAL NOTES) WHICH
 RELATE TO WIND.PROVIDE DESIGN
 CRITERIA FOR THE STAIRS (TABLE 1604.1),
 HANDRAILS (FBC1608.2.1), AND THE
 GUARDRAILS (FBC1608.2.2).
  
 2.)RISERS SHALL BE A MAXIMUM HEIGHT OF
 7", MINIMUM OF 4", TREADS A MINIMUM OF
 11", FBC1007.3.
  
 3.)HANDRAILS SHALL COMPLY WITH FBC
 1007.5.5.
  
 4.)THE GUARDRAILS, INCLUDING THE STAIR
 RAIL WHICH ALSO SERVES AS A GUARDRAIL,
 ARE TO COMPLY WITH FBC1015.3 AND
 1015.3(1) (OPENINGS).
  
 5.)THE NOTE ON DETAIL B-S4, GRAB BAR
 RAIL SEE DETAIL, AND NEW STAIR HANDRAIL
 POINT TO RAILS AT 42", BUT THE DETAIL
 INDICATES 36".
  
 6.)DETAIL 4-S5 REFERS TO DETAILS 7-S4
 AND 6-S4, DETAILS ARE ON S5.

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2004-08-04 Cont ID  
Sent By lmartine Date 2004-07-30 Time 15:51 Rev Time 1.00
Received By lmartine Date   Time   Sent To  
Notes
2004-08-04 00:00:00APPROVED BY MIKE CARSILLO

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2004-05-26 Cont ID  
Sent By mcarsill Date 2004-05-26 Time 12:32 Rev Time 0.00
Received By mcarsill Date 2004-05-26 Time 12:32 Sent To  
Notes
2004-05-26 00:00:001) DEMOLITION, RENOVATION, AND
 CONSTRUCTION TO COMPLY WITH NFPA 241.
  
 2) PLEASE PROVIDE PRESCRIPTIVE
 STRENGTH REQUIREMENTS FOR NEW HANDRAILS
 AND GUARDRAILS.
  
 3) STAIRS SHALL BE NO LESS THAN 4 INCHES
 NO GREATER THAN 7 INCHES AND TREADS
 SHALL BE NO LESS THAN 11 INCHES.
  
 4) PLEASE DEMONSTRATE THAT SPHERES OF
 VARIOUS SIZES WILL NOT PASS THROUGH
 HANDRAILS AND GUARDRAILS.
  
 5) PLEASE INDICATE HOW REMOVAL OF
 STAIRS WILL IMPACT THE REST OF THE
 PARKING GARAGE.
  
 MIKE CARSILLO, ASSISTANT FIRE MARSHAL
 835-2910

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2004-08-05 Cont ID  
Sent By alange Date 2004-08-05 Time 14:14 Rev Time 0.00
Received By alange Date 2004-07-29 Time 15:58 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-07-30 Cont ID  
Sent By csiegber Date 2004-07-30 Time 08:03 Rev Time 0.00
Received By csiegber Date 2004-07-30 Time 08:03 Sent To  
Notes
2004-07-30 00:00:00TO COMM BD#20

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-05-25 Cont ID  
Sent By alange Date 2004-05-25 Time 15:33 Rev Time 0.00
Received By alange Date 2004-05-25 Time 15:33 Sent To  
Notes
2004-05-25 00:00:00TO COMM BD #46