| Plan Review Stops For Permit 04050773 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2004-06-22 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2004-06-22 |
Time |
13:07 |
Rev Time |
1.00 |
| Received By |
shill |
Date |
2004-06-22 |
Time |
12:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2004-06-17 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2004-06-17 |
Time |
13:52 |
Rev Time |
1.50 |
| Received By |
shill |
Date |
2004-06-17 |
Time |
13:13 |
Sent To |
|
|
| Notes |
| 2004-06-17 00:00:00 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | | [email protected] | | | | | | 1.)A NOTICE OF COMMENCEMENT MUST BE | | | FILED WITH THE CLERK OF COURTS BEFORE A | | | PERMIT CAN BE ISSUED. | | | | | | 2.)THE DOCTOR'S TOILET SHALL BE | | | ADAPTABLE FBC11-4.1.3(11) (GRAB BAR | | | BACKING, SINK), PROVIDE A DETAIL. CLEAR | | | FLOOR SPACE REQUIRED FBC11-4.23.3. | | | | | | 3.)SHOW CLEAR FLOOR SPACE FOR | | | FIXTURES. | | | | | | 4.)DOORS SHALL NOT SWING INTO THE | | | FLOOR SPACE REQUIRED FOR ANY FIXTURE | | | FBC11-4.23.2 (HANDICAP TOILET). | | | | | | 5.)RE: THE NEW CASED OPENINGS, PROVIDE | | | INFORMATION ABOUT THE WALL, IS A HEADER | | | REQUIRED? | | | | | | 6.)THE GRAB BAR AT THE WATER CLOSET IS | | | TO BE 36" MIN, FBC 11-FIGURE 29. | | | | | | 7.) 1503.4.4 PROTECTION AGAINST DECAY & | | | TERMITES. CONDENSATE LINES & ROOF DOWN | | | SPOUTS SHALL DISCHARGE AT LEAST 1 FT. | | | AWAY FROM THE STRUCTURE SIDEWALL, | | | WHETHER BY UNDERGROUND PIPING, TAIL EX- | | | TENSIONS, OR SPLASH BLOCKS. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2005-04-06 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2005-04-06 |
Time |
12:52 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2005-04-06 |
Time |
11:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2004-06-22 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2004-06-22 |
Time |
19:30 |
Rev Time |
0.33 |
| Received By |
dpalmer |
Date |
2004-06-22 |
Time |
19:30 |
Sent To |
|
|
| Notes |
| 2004-06-22 00:00:00 | ********** PROVISO/ REVISIONS ******** | | | | | | 1)NOTE: PLEASE SEE 600.5 FOR MISSING | | | REQUIRED SIGN CIRCUIT. | | | | | | 2)NOTE: PLEASE PROVIDE ALL CIRCUITING | | | ON PLANS AND SUBMIT W/ PANEL SCHEDULE | | | BEFORE FINAL ELECTRICAL INSPECTION. | | | THIS MUST BE SUBMITTED TO CITY FOR | | | REVIEW AND STAMPING TO BE BACK ON | | | JOBSITE FOR INSPECTION. | | | | | | ** PLEASE NOTE, ALL OTHER REVSIONS TO | | | PLANS/JOBSITE MUST BE SUBMITTED FOR | | | REVIEW AND STAMPING BEFORE ROUGH ELECTR- | | | -ICAL INSPECTION IS CALLED IN. | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | | REVIEW. IF THERE ARE ANY QUESTIONS, | | | PLEASE DO NOT HESITATE TO CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | CITY OF WEST PALM BEACH | | | CONSTUCTION SERVICES DEPT. | | | 561-805-6717 | | | [email protected] |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2004-05-20 |
|
|
Cont ID |
|
| Sent By |
mjacobs |
Date |
2004-06-21 |
Time |
16:31 |
Rev Time |
0.33 |
| Received By |
dpalmer |
Date |
2004-05-20 |
Time |
14:47 |
Sent To |
|
|
| Notes |
| 2004-05-20 00:00:00 | *********** UNSAT *************** | | | | | | 1)NOTE: PLEASE SHOW ALL CIRCUITING ON | | | PLANS AND CORRELATE WITH PANEL SCHEDULE( | | | S) TO BE SUBMITTED. | | | PLEASE ALSO SEE 700.12E FOR CIRCUITING | | | OF EM/LTS. | | | | | | 2)NOTE: PLEASE SHOW NEW OR EXSITNG | | | SIGN CIRCUIT PER 600.5. | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | | REVIEW. IF THERE ARE ANY QUESTIONS, | | | PLEASE DO NOT HESITATE TO CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | CITY OF WEST PALM BEACH | | | CONSTUCTION SERVICES DEPT. | | | 561-805-6717 | | | [email protected] |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2004-05-20 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2004-05-19 |
Time |
13:10 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2004-05-19 |
Time |
13:10 |
Sent To |
|
|
| Notes |
| 2004-05-19 00:00:00 | 1) ALL DEMOLITION, RENOVATION, AND | | | CONSTRUCTION TO COMPLY WITH NFPA 241. | | | | | | 2) DEBRIS IS TO BE REMOVED DAILY FROM | | | THE SITE. | | | | | | 3) ENSURE THAT PORTABLE FIRE | | | EXTINGUISHERS ARE PRESENT. | | | | | | MIKE CARSILLO, ASSISTANT FIRE MARSHAL | | | 835-2910 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2005-03-31 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2005-03-31 |
Time |
13:49 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2005-03-31 |
Time |
13:49 |
Sent To |
E |
|
| Notes |
| 2005-03-31 00:00:00 | TO "DPALMER" DESK/REVISION |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2004-06-21 |
|
|
Cont ID |
|
| Sent By |
mjacobs |
Date |
2004-06-21 |
Time |
16:30 |
Rev Time |
0.00 |
| Received By |
mjacobs |
Date |
2004-06-21 |
Time |
16:30 |
Sent To |
|
|
| Notes |
| 2004-06-21 00:00:00 | SENT TO COMM BD#21 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2004-06-17 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2004-06-17 |
Time |
15:17 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2004-05-19 |
Time |
07:56 |
Sent To |
|
|
| Notes |
| 2004-05-19 00:00:00 | TO COMM BD#2 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2004-06-08 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2004-06-08 |
Time |
07:27 |
Rev Time |
0.25 |
| Received By |
pkrauss |
Date |
2004-06-08 |
Time |
07:27 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2004-07-08 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2004-07-08 |
Time |
12:28 |
Rev Time |
1.00 |
| Received By |
kstevens |
Date |
2004-07-08 |
Time |
12:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2004-06-05 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2004-06-05 |
Time |
10:20 |
Rev Time |
0.50 |
| Received By |
kstevens |
Date |
2004-06-05 |
Time |
10:20 |
Sent To |
|
|
| Notes |
| 2004-06-05 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | FBC-2001 CHAPTER 1 | | | FBC-2001 CHAPTER 11 | | | | | | 1) SHT 1 DEMO NOTES #4 & #5 - NO DEAD | | | ENDS ALLOWED IN THE REMOVAL OF ANY PART | | | OF THE DRAINAGE SYSTEM. SECTION 704.5 | | | 2) SHT 3 GENERAL PLUMBING NOTES #17, AIR | | | CHAMBERS ARE NOT APPROVED. DELETE FROM | | | REFERENCE NOTE. SECTION 604.9 | | | 3) SHT 3 WATER HEATER SHALL BE ACCESSIB- | | | LE. SUBMIT A DETAIL. - SUBMIT A DETAIL | | | FOR THE PIPING OF THE T/P RELEIF VALVE | | | DISCHARGE AND THE EMERGENCY HEATER PAN | | | DRAINAGE PIPING. SECTIONS 501.4 AND | | | 104.2.1 | | | 4) SHT 3 THERMAL EXPANSION CONTROL IS | | | REQUIRED FOR THE WATER HEATER. SECTION | | | 607.3.2. | | | 5) A DRINKING FOUNTAIN IS REQUIRED PER | | | TABLE 403.1. (ALSO SEE SECTION 410.1) | | | | | | REVIEW BY KEN STEVENS | | | (561) 805-6721 | | | FAX (561) 653-2692 | | | E-MAIL [email protected] |
|
|